Critica Limited (ASX: CRI) Investor Webinar | 30 September 2026
Critica CEO Jacob Deysel joins Investability's Dannika Warburton to walk through the outcomes of the Mt Lindsay Tin-Tungsten Project Scoping Study, released to the ASX on 29 September 2026. Jacob describes the study as a key step in his vision to transform Critica "from an explorer into a developer of critical metals."
The Scoping Study evaluates a 1.0 Mtpa underground mining and processing operation at the 100%-owned project in north-west Tasmania. Base Case outcomes include an after-tax NPV₈ of approximately A$1.01 billion, an after-tax IRR of approximately 56% and a payback period of approximately 1.9 years. These are set against estimated pre-production capital of A$244.5 million, an after-tax NPV-to-capex ratio of 4.1x. The project sits on a granted Mining Lease, and tungsten makes up approximately 75% of modelled life-of-mine revenue. Global tungsten supply is highly concentrated, with China controlling approximately 79% of mining capacity.
In the Q&A that follows the presentation, Jacob answers investor questions on:
Tungsten and tin price assumptions
Offtake discussions
How Critica plans to fund development
Processing plant location and tailings
Approvals and stakeholder engagement
The Livingston and Reward deposits
Potential by-product upside, including copper and boron
Engagement with institutional investors
An update on the upcoming Jupiter Rare Earth Project Scoping Study
The Scoping Study is preliminary in nature. Please refer to the cautionary statement in the ASX announcement.