Jupiter Resource Drilling Confirms Priority High-Grade Zones
Released
Released
Announcement PDF
ASX Announcement
13 July 2026 | ASX: CRI
CRITICA LIMITED
Level 2, 16 Altona Street,
West Perth, Western
Australia ABN 51 119 678 385
T: +61 8 6279 9428
E: admin@critica.limited
critica.limited
Resource Drilling at Jupiter Confirms Priority Near-Surface
and High-Grade Rare Earth Zones
Resource definition drilling successfully confirms priority higher-grade zones and
provides a key input into the updated SRK Resource Estimate and Jupiter
Scoping Study.
Jupiter Highlights
• 145 AC holes completed for 7,274 metres across a c. 3 km2
prioritised near-
surface resource definition area within the 40 km2
Jupiter Inferred Resource
footprint
• Drilling designed to support conversion of priority resource areas from Inferred to
Indicated classification
• Multiple broad, high-grade rare earth intersections returned, including:
o JPAC273 – 23m @ 3,603 ppm TREO from 20m including 12m @ 5,350 ppm
TREO from 24m
o JPAC277 – 30m @ 2,995 ppm TREO from 20m including 16m @ 3,811 ppm
TREO from 20m
o JPAC280 – 40m @ 2,626 ppm TREO from 36m
o JPAC393 – 56m @ 2,642 ppm TREO from 16m including 20m @ 3,465 ppm
TREO from 36m
o JPAC397 – 73m @ 2,400 ppm TREO from 16m including 32m @ 3,551 ppm
TREO from 24m
o JPAC401 – 62m @ 2,138 ppm TREO from 20m including 24m @ 2,930 ppm
TREO from 62m
• Results confirm continuity of higher-grade mineralisation within targeted
optimisation areas
• Resource upgrade area coincides with pilot plant sample area utilised in
beneficiation and hydrometallurgical testwork
• Results delivered to SRK Consulting for the updated Jupiter Mineral Resource
Estimate
• Updated Resource Estimate to support mine planning and the Jupiter Scoping
Study targeted for completion in Q3 2026
2
Critica Limited (ASX: CRI) (“Critica”or“the Company”) is pleased to announce results from the recently
completed Jupiter Resource Definition Drilling Program, a key component of the Company's strategy to advance
the Jupiter Rare Earth Project towards completion of the Scoping Study.
The program comprised 145 Air Core (AC) drill holes for 7,274 metres completed on 125 metre spacing across
priority areas identified through resource optimisation studies. The results confirm strong continuity of higher-
grade rare earth mineralisation and provide an important dataset supporting the updated Mineral Resource
Estimate currently being prepared by SRK Consulting.
Critica’s CEO Jacob Deysel commented:
"When we commenced this program earlier this year, our objective was clear: increase confidence in
priority areas of the Jupiter Resource and provide a robust dataset to support the updated Mineral
Resource Estimate and ongoing Scoping Study.
The results have successfully validated the targeted higher-grade zones within the existing resource and
demonstrate strong continuity of mineralisation across the resource upgrade area. Importantly, the
program was designed to support the conversion of priority areas from Inferred to Indicated
classification and represents another important de-risking milestone for the Jupiter Project.
With drilling now completed and the results delivered to SRK Consulting, we are entering the next stage
of resource development. Together with the significant metallurgical advancements achieved over the
past year, these results strengthen the technical foundation of Jupiter and support the progression of the
updated Resource Estimate and Scoping Study."
Figure 1: Jupiter infill drilling on 1.8 BT at 1,700 ppm TREO Inferred Resource block model (as announced by
Critica to the ASX 11 February 2025) draped over satellite image. See Table 1 for complete listing of the 125
x 125 m infill drilling intersections.
3
Figure 2: Selected intersections as reported (refer to key in Figure 1), see Table 1 for complete listing of the
125 x 125 m infill drilling intersections.
Jupiter Resource Definition Drilling program
The Jupiter Resource Drilling Program forms a key component of Critica's strategy to advance the
Jupiter Rare Earth Project through resource optimisation, metallurgical development and ongoing
Scoping Study activities.
The program was specifically designed to increase drill density across priority areas of the Jupiter
Resource identified through optimisation studies, with the objective of supporting the conversion of
selected portions of the existing Inferred Mineral Resource to Indicated classification and improving
confidence for mine planning and development studies.
A total of 145 Air Core (AC) holes for 7,274 metres were completed on nominal 125 metre by 125 metre
spacing across the targeted resource upgrade area. The drilling focused on higher-confidence areas
within the current resource footprint and was designed to provide key inputs into the updated Mineral
Resource Estimate currently being prepared by SRK Consulting.
Importantly, the resource definition area coincides with the pilot plant sample area and includes
mineralisation previously utilised in Critica's beneficiation and hydrometallurgical testwork programs.
This alignment provides a direct link between resource definition, metallurgical performance and ongoing
development planning.
4
Results Confirm Higher-Grade Mineralisation Continuity
A 3 km2
area of shallow clay-hosted rare earth mineralisation was selected for 125 x 125 m spaced infill
drilling within the c. 40 km2 Jupiter Inferred Resource footprint. The drilling intersected broad zones of
clay-hosted rare earth mineralisation across both clay and saprolite domains, confirming continuity of
mineralisation and supporting the Company's objective of increasing resource confidence within
prioritised development zones.
Selected significant intersections include:
• JPAC273 – 23m @ 3,603 ppm TREO from 20m including 12m @ 5,350 ppm TREO from 24m
• JPAC277 – 30m @ 2,995 ppm TREO from 20m including 16m @ 3,811 ppm TREO from 20m
• JPAC280 – 40m @ 2,626 ppm TREO from 36m
• JPAC338 – 53m @ 1,878 ppm TREO from 12m including 16m @ 3,040 ppm TREO from 44m
• JPAC364 – 55m @ 1,965 ppm TREO from 8m including 8m @ 2,808 ppm TREO from 12m
• JPAC388 – 42m @ 2,338 ppm TREO from 12m including 12m @ 3,105 ppm TREO from 12m
• JPAC389 – 25m @ 2,218 ppm TREO from 8m including 4m @ 4,346 ppm TREO from 12m
• JPAC393 – 56m @ 2,642 ppm TREO from 16m including 20m @ 3,465 ppm TREO from 36m
• JPAC397 – 73m @ 2,400 ppm TREO from 16m including 32m @ 3,551 ppm TREO from 24m
• JPAC401 – 62m @ 2,138 ppm TREO from 20m including 24m @ 2,930 ppm TREO from 62m
Next Steps
With the resource definition drilling program now completed, Critica's immediate focus is on finalisation
of the updated Mineral Resource Estimate and continued progression of the Jupiter Scoping Study.
Key upcoming activities include:
• Completion of the updated Jupiter Mineral Resource Estimate by SRK Consulting
• Integration of the updated resource model into mine planning and optimisation studies
• Ongoing metallurgical optimisation and product qualification programs
• Assessment of development assumptions and project economics as part of the Jupiter Scoping
Study
• Completion of the Jupiter Scoping Study targeted for Q3 2026
The Company believes the updated Resource Estimate, together with the significant metallurgical
advancements achieved over the past year, will further strengthen the technical foundation of the Jupiter
Project as it advances toward development.
5
Building a Critical Minerals Platform
The fracturing of global critical mineral supply chains has created an urgent structural demand for
Western aligned sources of the materials that underpin defence, artificial intelligence, electrification and
advanced manufacturing. China currently controls approximately 98% of global gallium supply, 85% or
more of rare earth processing, 80% or more of tungsten production and downstream processing, and 35%
or more of refined tin supply. Export restrictions tightened in November 2025, and Western defence
supply chains are actively targeting non-China sourcing by approximately 2027.
Critica is strategically positioned to capitalise on this demand through its Jupiter and Mt Lindsay projects,
which collectively provide exposure to five critical minerals—tin, tungsten, rare earth elements, yttrium
and gallium. These commodities are at the centre of global efforts to diversify supply chains, strengthen
resource security and support advanced manufacturing, underpinned by increasing policy support and
investment across the United States, Australia and Europe
Jupiter, Australia's largest clay-hosted rare earth resource1
adds scale-driven exposure to magnet rare
earths, gallium and yttrium across electrification, robotics and AI infrastructure demand. Mt Lindsay, one
of Australia's largest undeveloped tin-tungsten projects, offers leveraged exposure to two of the most
strategically sensitive metals in Western defence and semiconductor supply chains.
Together, these assets position Critica as an emerging multi-commodity critical minerals platform,
diversified by project, commodity and end market, and aligned with the structural reconfiguration of
Western supply chains now underway.
Dual Project Development Timeline
The development timeline below illustrates the progress made across both projects to date and the
key milestones:
1. Refer to ASX announcement 11 February 2025
6
Authorised by the Board of Critica Limited.
Jacob Deysel
CEO
Critica Limited
Level 2, 16 Altona Street, West Perth, Western Australia
T: + 61 8 6279 9428 | admin@critica.limited | critica.limited
Investor and Media Relations
Dannika Warburton
InvestabilityPartners
investors@investability.com.au
JOIN CRITICA’S INTERACTIVE INVESTOR HUB
Sign up and engage with our investor relations team
BUILDING A CRITICAL MINERALS PLATFORM
RARE EARTHS | YTTRIUM | GALLIUM | TIN | TUNGSTEN
Critica Limited (ASX: CRI) is advancing a
portfolio of critical minerals projects with
exposure to commodities used in defence,
semiconductors, artificial intelligence,
advanced manufacturing and
electrification.
The Jupiter Project in Western Australia
provides exposure to rare earths, yttrium
and gallium, while the Mt Lindsay Project
in Tasmania provides exposure to tin and
tungsten.
Together, these projects provide exposure
to minerals essential to future industrial
growth and national security applications.
7
Competent Persons Statement
The information in this report that relates to exploration results including geology interpretation, data
preparation and data quality is based on work compiled by Dr. Stuart Owen who is a Member of the
Australian Institute of Geoscientists. Dr. Owen is a permanent employee of Critica Limited and has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the
2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC code). Dr. Owen consents to the inclusion in the report of the matters based on his
information in the form and context in which they appear.
No new Mineral Resource information is contained in this report
All material assumptions and technical parameters underpinning the Minerals Resource Estimates
referred to within previous ASX announcements continue to apply and have not materially changed since
last reported. The company is not aware of any new information or data that materially affects the
information included in this announcement.
Forward Looking Statements
This ASX announcement contains certain statements that may constitute “forward looking statement”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the
Company, that could cause actual results to differ materially from those expressed in, or implied or
projected by, the forward-looking information and statements.
These risks and uncertainties include, but are not limited to: (i) those relating to the interpretation of drill
results, the geology, grade and continuity of mineral deposits and conclusions of economic evaluations,
(ii) risks relating to possible variations in reserves, grade, planned mining dilution and ore loss, or recovery
rates and changes in project parameters as plans continue to be refined, (iii) the potential for delays in
exploration or development activities or the completion of feasibility studies, (iv) risks related to
commodity price and foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate
financing on a timely basis and on acceptable terms or delays in obtaining governmental approvals or in
the completion of development or construction activities, and (vi) other risks and uncertainties related to
the Company’s prospects, properties and business strategy. Our audience is cautioned not to place
undue reliance on these forward-looking statements that speak only as of the date hereof, and we do not
undertake any obligation to revise and disseminate forward-looking statements to reflect events or
circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
announcement based on the information contained in this and previous ASX announcements.
8
Table One: Jupiter Drill hole locations and significant intersections
Hole East North RL
m
EOH
m
From
m
To
m
Interval
m
TREO
ppm
MREO
ppm
MREO/
TREO
Pr6O11
ppm
Nd2O3
ppm
Tb4O7
ppm
Dy2O3
ppm
JPAC263 529494 6854474 346 51 8 51 43 1241 309 25% 65 227 3 15
including 12 16 4 2122 543 26% 119 401 4 19
JPAC264 529487 6854343 346 57 12 57 45 1300 343 26% 72 254 3 14
JPAC265 529368 6854359 346 48 12 48 36 1280 330 26% 69 244 3 15
JPAC266 529494 6854225 347 63 28 63 35 1943 458 24% 100 338 4 17
including 32 40 8 3450 706 20% 170 518 4 15
JPAC267 529496 6853971 347 16 12 16 4 735 160 22% 37 119 1 5
JPAC268 529379 6853857 347 16 12 16 4 584 121 21% 30 89 1 2
JPAC269 529497 6853729 348 30 8 30 22 1356 365 27% 70 276 4 16
JPAC270 529376 6853724 347 54 8 54 46 1906 511 27% 100 384 5 23
including 12 32 20 2484 710 29% 140 540 5 25
JPAC271 529375 6853602 347 70 24 70 46 1433 361 25% 75 270 3 14
including 32 48 16 2047 541 26% 111 407 4 19
JPAC272 529498 6853477 348 40 8 40 32 1963 464 24% 93 347 4 21
including 12 28 16 2527 553 22% 112 413 5 24
JPAC273 529372 6853476 348 43 20 43 23 3603 828 23% 172 620 6 30
including 24 36 12 5350 1188 22% 243 895 9 42
JPAC274 529248 6853474 347 54 8 54 46 1502 374 25% 74 281 4 16
including 16 32 16 2229 508 23% 103 381 4 21
JPAC275 529374 6853356 348 39 12 39 27 1992 378 19% 76 282 4 17
including 20 28 8 3980 591 15% 116 445 6 27
JPAC276 529124 6853359 347 74 24 74 50 1675 369 22% 78 277 3 12
including 48 56 8 3915 855 22% 170 652 6 27
JPAC277 529374 6853220 348 51 20 50 30 2995 864 29% 171 657 7 29
including 20 36 16 3811 1156 30% 238 877 8 33
JPAC278 529252 6853222 348 72 16 72 56 1509 325 22% 73 242 2 9
JPAC279 529118 6853233 347 77 20 77 57 1803 358 20% 79 265 2 11
JPAC280 529369 6853095 348 76 36 76 40 2626 696 27% 144 511 7 34
JPAC281 529134 6853097 347 82 44 82 38 1966 417 21% 92 303 4 19
including 60 68 8 3676 934 25% 198 682 8 46
JPAC282 529489 6852978 349 72 32 72 40 933 193 21% 44 141 1 7
JPAC283 529378 6852972 348 78 36 78 42 1530 303 20% 71 223 2 8
JPAC284 529254 6852967 348 67 36 67 31 1426 317 22% 72 235 2 9
JPAC285 529133 6852973 348 68 36 68 32 1772 399 23% 89 296 2 12
JPAC286 529371 6852852 348 83 48 83 35 2057 466 23% 105 346 3 12
including 68 76 8 3418 744 22% 169 556 4 16
JPAC287 529627 6852852 349 66 48 64 16 1242 288 23% 59 215 2 12
JPAC288 529873 6852848 351 49 12 49 37 1719 335 19% 71 249 3 13
JPAC289 530130 6852846 352 27 8 27 19 1212 305 25% 60 225 3 17
JPAC290 530373 6852849 353 59 16 59 43 1466 370 25% 72 276 4 19
JPAC291 529623 6852994 349 57 24 32 8 1015 226 22% 45 166 2 12
JPAC292 529700 6852989 350 63 24 63 39 1721 405 24% 77 303 4 20
including 24 36 12 2568 541 21% 103 407 6 26
JPAC293 529749 6852976 350 60 20 60 40 1684 414 25% 80 310 4 20
JPAC294 529871 6852972 350 54 12 54 42 1788 428 24% 89 319 4 17
including 24 36 12 2618 590 23% 123 439 5 23
JPAC295 529997 6852982 351 43 8 42 34 1720 455 26% 89 343 4 19
JPAC296 530120 6852976 351 31 8 31 23 1057 262 25% 53 195 3 12
JPAC297 530250 6852977 352 48 8 48 40 1677 439 26% 84 329 6 22
JPAC298 530369 6852973 352 53 12 52 40 1476 359 24% 75 268 3 14
JPAC299 529625 6853106 349 56 24 56 32 1666 444 27% 85 332 5 24
JPAC300 529872 6853100 350 66 16 65 49 1643 436 27% 84 328 4 20
JPAC301 530124 6853103 351 34 8 34 26 954 251 26% 48 187 3 14
JPAC302 529620 6853230 349 57 12 57 45 1487 372 25% 73 278 4 18
including 24 36 12 1908 477 25% 96 356 4 21
JPAC303 529748 6853229 350 52 20 52 32 1830 480 26% 95 361 4 20
JPAC304 529872 6853228 350 54 12 28 16 2138 461 22% 92 348 4 18
JPAC305 530000 6853227 351 32 NSI
JPAC306 530123 6853228 351 27 8 27 19 1797 474 26% 93 360 4 18
JPAC307 530247 6853223 352 24 16 24 8 1373 289 21% 61 213 2 12
JPAC308 530371 6853228 352 42 8 42 34 1400 317 23% 62 230 4 22
JPAC309 529623 6853359 349 41 12 41 29 2128 582 27% 110 441 5 26
JPAC310 529873 6853346 350 33 8 33 25 1429 383 27% 72 291 4 17
including 24 28 4 2796 917 33% 141 717 11 49
JPAC311 530125 6853349 351 13 8 13 5 649 99 15% 26 71 <1 2
JPAC312 530372 6853349 352 45 12 45 33 1740 419 24% 85 312 4 19
9
Hole East North RL
m
EOH
m
From
m
To
m
Interval
m
TREO
ppm
MREO
ppm
MREO/
TREO
Pr6O11
ppm
Nd2O3
ppm
Tb4O7
ppm
Dy2O3
ppm
including 20 32 12 2469 593 24% 120 448 4 20
JPAC313 529622 6853470 349 39 8 39 31 1518 402 26% 81 300 4 18
JPAC314 529745 6853479 349 50 8 50 42 1543 398 26% 77 296 4 22
JPAC315 529869 6853478 350 26 8 26 18 1042 264 25% 51 198 3 13
JPAC316 529997 6853470 350 33 4 33 29 1092 306 28% 57 233 3 14
JPAC317 530118 6853469 351 24 8 24 16 429 80 19% 18 59 1 3
JPAC318 530249 6853477 351 14 failed to reach target zone
JPAC319 530374 6853477 352 24 16 24 8 642 151 24% 31 111 1 8
JPAC320 529630 6853603 349 50 16 44 28 1553 407 26% 81 305 4 18
including 20 32 12 2602 700 27% 139 527 6 29
JPAC321 530124 6853598 350 58 8 58 50 1278 268 21% 62 195 2 9
including 36 52 16 2038 418 21% 96 307 3 13
JPAC322 529624 6853734 348 47 16 47 31 867 223 26% 46 164 2 11
JPAC323 529747 6853727 349 38 12 38 26 1919 544 28% 104 411 5 24
including 24 36 12 2725 799 29% 146 612 7 33
JPAC324 529872 6853725 349 45 8 45 37 1584 398 25% 81 298 3 16
JPAC325 529998 6853731 349 65 60 65 5 912 244 27% 48 183 2 11
JPAC326 530123 6853727 350 65 40 65 25 1468 405 28% 79 303 4 19
JPAC327 529619 6853846 348 48 8 48 40 1294 342 26% 66 255 4 18
JPAC328 529742 6853861 348 39 12 39 27 1949 497 26% 100 373 4 21
JPAC329 529871 6853848 349 53 12 53 41 1566 414 26% 86 309 4 17
JPAC330 530000 6853850 349 71 20 71 51 1248 313 25% 62 233 3 15
including 36 40 4 2021 463 23% 93 341 5 25
JPAC331 529622 6853976 347 57 12 57 45 1564 401 26% 77 300 4 20
JPAC332 529745 6853981 348 55 16 55 39 1484 374 25% 78 280 3 14
JPAC333 529873 6853975 348 61 28 61 33 1834 441 24% 89 328 4 20
JPAC334 530000 6853978 349 66 36 66 30 1625 379 23% 80 280 4 17
including 48 52 4 2989 736 25% 160 551 5 21
JPAC335 530248 6853463 351 18 12 18 6 984 246 25% 49 183 2 12
JPAC336 529618 6854099 347 63 24 63 39 1784 436 24% 96 322 4 20
JPAC337 529871 6854099 348 68 32 68 36 1158 283 24% 55 206 4 19
JPAC338 530122 6854100 349 65 12 65 53 1878 488 26% 95 360 6 28
including 44 60 16 3040 819 27% 146 607 11 56
JPAC339 529628 6854221 347 71 24 71 47 1698 428 25% 88 318 4 19
including 32 56 24 2352 594 25% 120 442 6 26
JPAC340 529748 6854229 348 67 16 67 51 1354 358 26% 73 266 3 16
including 44 56 12 2198 623 28% 118 471 6 29
JPAC341 529874 6854219 348 67 16 67 51 1606 405 25% 82 301 4 19
including 44 60 16 2463 600 24% 114 450 6 31
JPAC342 530000 6854233 348 67 8 67 59 905 197 22% 45 144 2 8
including 52 67 15 1563 380 24% 79 282 4 17
JPAC343 530128 6854224 349 47 16 47 31 386 70 18% 17 51 1 3
JPAC344 529625 6854350 347 57 12 57 45 1726 447 26% 90 330 5 23
JPAC345 529871 6854348 348 40 8 40 32 1374 340 25% 71 250 3 16
JPAC346 530123 6854355 349 24 8 24 16 1776 445 25% 91 330 4 20
JPAC347 529625 6854468 347 54 8 54 46 1189 309 26% 62 229 3 16
JPAC348 529745 6854475 347 46 8 46 38 1595 387 24% 79 282 4 21
JPAC349 529872 6854479 347 36 8 36 28 975 243 25% 49 181 2 12
JPAC350 530000 6854473 348 34 8 34 26 1474 399 27% 80 297 4 19
JPAC351 530124 6854471 349 40 8 40 32 1717 398 23% 82 294 4 19
JPAC352 530246 6854471 349 47 8 47 39 1260 284 23% 61 209 2 11
JPAC353 529623 6854603 346 39 8 31 23 1393 337 24% 69 253 3 13
JPAC354 529871 6854600 347 29 NSI
JPAC355 530120 6854601 349 41 20 41 21 751 167 22% 35 124 1 7
JPAC356 530374 6854597 350 72 20 72 52 1605 401 25% 82 300 3 16
including 40 44 4 2638 774 29% 144 591 7 33
JPAC357 529621 6854725 346 44 16 44 28 823 175 21% 39 129 1 6
JPAC358 529749 6854728 347 63 20 63 43 1264 314 25% 63 235 3 14
including 40 48 8 2215 515 23% 101 388 5 23
JPAC359 529872 6854723 347 52 24 52 28 1863 433 23% 86 325 4 19
including 32 36 4 3494 722 21% 144 540 7 32
JPAC360 530000 6854721 348 39 28 39 11 1504 366 24% 81 270 3 14
JPAC361 530123 6854722 348 57 32 57 25 1398 366 26% 76 272 3 16
JPAC362 530249 6854722 349 68 24 68 44 1724 488 28% 99 366 4 19
including 44 52 8 2681 783 29% 154 594 6 29
JPAC363 530371 6854723 350 48 28 48 20 1631 471 29% 97 353 4 18
JPAC364 530498 6854722 350 63 8 63 55 1965 543 28% 106 404 5 28
including 12 20 8 2808 818 29% 163 612 8 36
JPAC365 529748 6854848 347 72 36 64 28 1171 294 25% 59 221 2 12
10
Hole East North RL
m
EOH
m
From
m
To
m
Interval
m
TREO
ppm
MREO
ppm
MREO/
TREO
Pr6O11
ppm
Nd2O3
ppm
Tb4O7
ppm
Dy2O3
ppm
JPAC366 529868 6854846 347 65 32 65 33 1875 457 24% 96 344 3 15
JPAC367 530124 6854850 348 50 24 50 26 834 207 25% 42 154 2 10
JPAC368 530372 6854851 349 54 12 54 42 1881 502 27% 101 376 5 21
JPAC369 530623 6854843 351 10 NSI
JPAC370 529750 6854976 347 59 20 59 39 911 210 23% 44 156 2 8
JPAC371 529873 6854977 347 66 12 66 54 1608 413 26% 83 310 3 17
JPAC372 529999 6854977 348 48 32 48 16 1717 473 28% 93 359 4 18
JPAC373 530124 6854976 348 45 32 40 8 1240 284 23% 44 189 7 44
JPAC374 530245 6854977 348 42 12 42 30 1488 383 26% 73 286 4 21
JPAC375 530372 6854975 349 19 8 19 11 1160 271 23% 54 204 2 11
JPAC376 530500 6854971 350 12 8 12 4 586 150 26% 30 113 1 6
JPAC377 530624 6854976 350 10 NSI
JPAC378 530748 6854974 350 38 8 38 30 780 169 22% 38 126 1 5
JPAC379 529867 6855096 347 40 12 40 28 1506 365 24% 76 273 3 15
JPAC380 530120 6855099 348 26 8 26 18 898 243 27% 48 185 2 9
JPAC381 530374 6855101 349 39 20 38 18 1191 262 22% 57 195 2 9
JPAC382 530622 6855099 350 34 8 33 25 1252 221 18% 49 165 1 6
including 8 12 4 2558 355 14% 83 264 2 7
JPAC383 529998 6855225 347 38 12 38 26 1161 295 25% 60 221 2 12
JPAC384 530120 6855222 348 35 28 35 7 1082 257 24% 54 192 2 9
JPAC385 530248 6855228 348 54 40 52 12 1099 292 27% 63 219 2 8
JPAC386 530370 6855228 349 78 24 78 54 927 205 22% 45 151 1 7
JPAC387 530497 6855227 349 60 8 60 52 1499 377 25% 74 283 3 16
including 16 24 8 2359 637 27% 118 488 6 26
JPAC388 530621 6855226 350 55 12 54 42 2338 560 24% 116 418 5 23
including 12 24 12 3105 719 23% 149 534 6 29
JPAC389 530747 6855226 350 33 8 33 25 2218 466 21% 95 350 4 18
including 12 16 4 4346 643 15% 129 478 7 30
JPAC390 529874 6855351 347 62 20 62 42 1323 324 24% 64 241 3 15
JPAC391 530123 6855350 347 51 17 50 33 1075 256 24% 55 190 2 10
including 40 48 8 2052 453 22% 92 339 4 19
JPAC392 530375 6855350 348 69 8 69 61 1587 391 25% 81 292 3 15
including 32 40 8 2384 608 26% 123 457 5 23
JPAC393 530623 6855349 349 72 16 72 56 2642 692 26% 141 524 5 23
including 36 56 20 3465 889 26% 178 678 6 27
JPAC394 529748 6855478 346 91 20 91 71 1620 383 24% 76 288 3 16
including 12 36 24 2407 528 22% 103 398 5 22
JPAC395 529870 6855477 346 83 16 83 67 1067 265 25% 53 199 2 12
JPAC396 529996 6855477 347 58 12 58 46 1966 505 26% 102 383 4 17
including 28 36 8 2861 774 27% 151 588 6 29
JPAC397 530121 6855477 347 89 16 89 73 2400 620 26% 124 471 5 20
including 24 56 32 3551 931 26% 186 708 7 31
JPAC398 530245 6855478 348 54 28 54 26 1159 256 22% 54 186 2 10
JPAC399 530371 6855472 348 75 36 68 32 1194 243 20% 53 181 2 8
JPAC400 530498 6855476 348 70 36 70 34 1915 438 23% 90 328 3 17
including 52 64 12 3206 719 22% 143 544 5 26
JPAC401 530620 6855474 349 82 20 82 62 2138 508 24% 100 380 5 25
including 32 56 24 2930 668 23% 129 492 7 40
JPAC402 529626 6855601 345 74 16 74 58 1469 381 26% 77 285 3 15
JPAC403 529872 6855724 346 28 0 24 24 1754 439 25% 91 330 3 15
JPAC404 529998 6855727 346 14 4 14 10 1301 335 26% 66 254 3 13
JPAC405 530123 6855725 347 6 NSI
JPAC406 530250 6855728 347 51 4 48 44 1832 439 24% 87 330 4 18
including 12 24 12 2601 552 21% 117 413 4 19
JPAC407 530371 6855727 348 42 12 42 30 1397 346 25% 71 258 3 14
Notes: Coordinates MGA Zone 50 GDA94. All holes drilled vertically. TREO represents the sum of 14 Rare Earth Elements excluding Promethium
plus Yttrium expressed as oxides. MREO represents the sum of the Neodymium, Praseodymium, Dysprosium and Terbium expressed as oxides See
Table Two for complete REE assay listing. NSI = no significant intersection.
11
Table Two: Jupiter Drilling REE, Th and U assays.
Hole From
m
To
m
Interval
m
TREO
ppm
La2O3
ppm
CeO2
ppm
Pr6O11
ppm
Nd2O3
ppm
Sm2O3
ppm
Eu2O3
ppm
Gd2O3
ppm
Tb4O7
ppm
Dy2O3
ppm
Ho2O3
ppm
Er2O3
ppm
Tm2O3
ppm
Yb2O3
ppm
Lu2O3
ppm
Y2O3
ppm
Ga2O3
ppm
Th
ppm
U
ppm
JPAC263 4 8 4 401 82 157 22 71 10 2.4 9 1.1 5.6 1.1 2.9 0.4 2.8 0.5 35 27 22 2
JPAC263 8 12 4 805 150 386 40 136 21 4.7 16 1.6 7.9 1.3 3.2 0.4 2.1 0.3 37 35 23 3
JPAC263 12 16 4 2122 409 969 119 401 59 13.3 41 4.2 19.2 2.8 6.6 0.8 3.7 0.5 73 43 30 3
JPAC263 16 20 4 1351 251 630 75 259 38 8.5 26 2.7 12.2 1.8 3.7 0.5 2.7 0.4 40 35 23 4
JPAC263 20 24 4 1659 284 759 90 328 51 11.9 37 3.8 18 2.8 5.7 0.7 3.5 0.6 64 40 29 5
JPAC263 24 28 4 1194 208 552 64 222 34 8.1 25 2.7 13.3 2.2 5.3 0.7 4 0.6 54 32 20 6
JPAC263 28 32 4 1397 209 500 58 202 33 8.4 31 4.4 29.2 6.8 22.3 3.8 24.5 4.3 259 30 20 5
JPAC263 32 36 4 1394 214 527 71 267 46 11.3 38 4.3 22.3 4.5 12.3 1.9 10.8 1.9 163 28 18 5
JPAC263 36 40 4 905 172 378 47 164 26 6.2 20 2.2 10.9 2 4.8 0.7 3.9 0.6 67 26 15 3
JPAC263 40 44 4 959 182 413 50 174 26 6.3 21 2.3 11.3 2 5.1 0.8 4.2 0.7 61 26 16 3
JPAC263 44 48 4 840 158 360 45 155 24 5.7 18 1.9 9.6 1.7 4.5 0.6 3.6 0.5 53 27 14 3
JPAC263 48 51 3 948 183 409 49 172 26 6 20 2.1 10.7 2 4.8 0.7 4.4 0.6 59 28 14 2
JPAC264 8 12 4 118 30 43 6 20 2 0.7 2 0.3 1.7 0.3 0.8 0.1 0.8 0.1 9 21 15 2
JPAC264 12 16 4 1172 260 516 63 209 30 6.9 21 2.2 10.1 1.6 3.7 0.5 2.3 0.4 46 49 34 3
JPAC264 16 20 4 1494 339 639 86 283 40 8.6 25 2.6 11.8 1.8 4.3 0.5 2.6 0.4 50 60 38 3
JPAC264 20 24 4 1485 296 682 81 275 42 8.4 26 2.7 13.1 2 4.7 0.5 3 0.4 50 52 47 2
JPAC264 24 28 4 1082 216 464 63 213 31 6.8 21 2.2 10.4 1.7 3.9 0.5 2.6 0.3 46 48 24 2
JPAC264 28 32 4 1683 317 742 101 335 49 10.5 31 3.4 16.1 2.6 6.2 0.7 3.8 0.5 66 45 32 4
JPAC264 32 36 4 1949 314 898 108 383 56 13.1 41 4.3 21.3 3.7 8.6 1 4.8 0.7 92 45 32 4
JPAC264 36 40 4 1747 270 767 102 383 61 13.1 40 4.3 20 3.3 6.9 0.9 4.5 0.6 72 34 17 3
JPAC264 40 44 4 960 153 461 53 188 29 6.6 19 2 8.8 1.4 3.3 0.4 2.9 0.4 33 35 18 4
JPAC264 44 48 4 659 114 279 35 131 21 4.9 16 1.6 8 1.4 3.6 0.6 3.6 0.5 40 31 13 4
JPAC264 48 52 4 1043 146 360 51 202 37 9.3 35 4.3 22.4 4.5 12.1 1.9 11.5 1.9 146 27 14 8
JPAC264 52 56 4 1122 178 453 58 206 32 7.6 28 3.2 16.3 3.3 8.7 1.3 7.7 1.1 117 27 16 4
JPAC264 56 57 1 928 163 394 50 177 27 6.3 21 2.2 11.6 2.1 5.1 0.7 4.1 0.6 63 30 14 3
JPAC265 8 12 4 255 67 93 15 46 6 1.5 5 0.6 2.8 0.5 1.4 0.2 1.4 0.2 15 28 20 2
JPAC265 12 16 4 1154 250 496 64 206 30 6.6 20 2.2 10.8 2.1 4.9 0.7 3.6 0.4 57 44 27 3
JPAC265 16 20 4 1475 293 655 84 278 37 8.5 25 2.7 13.8 2.3 5.5 0.7 3.7 0.5 66 45 26 2
JPAC265 20 24 4 1613 314 688 95 328 47 10.3 31 3.4 16 2.6 6.3 0.8 4.5 0.7 66 45 23 2
JPAC265 24 28 4 1483 276 662 86 292 44 9.2 29 3 14.6 2.2 5 0.7 3.7 0.6 57 45 25 2
JPAC265 28 32 4 1564 280 737 90 314 45 9.1 26 2.6 11.1 1.9 4.1 0.5 3.3 0.5 40 38 22 2
JPAC265 32 36 4 1046 188 458 57 217 31 6.7 20 2 8.8 1.6 4 0.6 4.1 0.7 46 29 16 4
JPAC265 36 40 4 934 146 351 44 163 30 6.9 23 3 16.5 3.1 9.8 1.6 10.3 1.6 125 28 15 6
JPAC265 40 44 4 1348 179 439 57 219 44 11.2 43 6 32.8 6.7 20 3 17.8 2.9 267 28 16 6
JPAC265 44 48 4 907 160 383 48 175 30 6.6 19 2.3 10.8 1.9 4.9 0.6 4.1 0.6 61 26 14 4
12
Hole From
m
To
m
Interval
m
TREO
ppm
La2O3
ppm
CeO2
ppm
Pr6O11
ppm
Nd2O3
ppm
Sm2O3
ppm
Eu2O3
ppm
Gd2O3
ppm
Tb4O7
ppm
Dy2O3
ppm
Ho2O3
ppm
Er2O3
ppm
Tm2O3
ppm
Yb2O3
ppm
Lu2O3
ppm
Y2O3
ppm
Ga2O3
ppm
Th
ppm
U
ppm
JPAC266 20 24 4 113 30 46 5 17 3 0.6 2 0.2 1.1 0.2 0.6 0.1 0.6 0.1 6 35 29 2
JPAC266 24 28 4 321 134 118 15 35 4 0.8 3 0.3 1.5 0.3 0.7 0.1 0.9 0.1 8 54 34 3
JPAC266 28 32 4 1608 660 597 92 206 17 3 7 0.9 4.3 0.7 2 0.3 1.8 0.3 16 44 31 4
JPAC266 32 36 4 4613 1115 2506 221 614 58 9.9 25 2.8 11.1 1.7 3.7 0.5 2.9 0.4 42 52 37 4
JPAC266 36 40 4 2287 444 1077 119 421 64 12.6 38 4.2 19.2 3 6.8 0.7 4.1 0.5 73 48 49 5
JPAC266 40 44 4 1396 260 636 73 271 43 9 25 2.8 12.5 1.9 5 0.6 3.9 0.5 53 42 44 8
JPAC266 44 48 4 2095 337 911 111 442 77 15.6 45 4.9 20.8 3.5 8.9 1.3 8.2 1.1 108 38 25 6
JPAC266 48 52 4 1877 265 667 89 360 69 16.2 55 7 35.8 6.9 20.4 2.9 17.9 3 263 35 27 5
JPAC266 52 56 4 1094 162 431 57 220 41 8.6 29 3.4 16.5 2.9 8.3 1.2 7.1 1.1 106 30 15 4
JPAC266 56 6
Share your feedback
Discover