Annual Report to shareholders
Released
Released
Announcement PDF
Annual Report
30 June 2015
ABN 51 119 678 385
Corporate Directory
Non-Executive Chairman
Mel Ashton
Managing Director
Hamish Halliday
Technical Director
Andrew Radonjic
Non-Executive Directors
Bruce McFadzean
John Jetter
Company Secretary
Brett Dunnachie
Principal & Registered Office
288 Churchill Avenue
SUBIACO WA 6008
Telephone: (08) 9381 4222
Facsimile: (08) 9381 4211
Share Registry
Security Transfer Registrars Pty Ltd
770 Canning Highway
APPLECROSS WA 6153
Auditors
Stantons International
Level 2
1 Walker Avenue
WEST PERTH WA 6005
Bankers
National Australia Bank
50 St Georges Terrace
PERTH WA 6000
Stock Exchange Listing
Australian Securities Exchange
(Home Exchange: Perth, Western Australia)
Code: VMS
Website Address
www.ventureminerals.com.au
2015 Annual Report
Contents
Chairman’s Letter to Shareholders
2
Directors’ Report
3
Auditor’s Independence Declaration
30
Financial Statements
31
Directors’ Declaration
58
Independent Auditor’s Report
59
Additional Shareholder Information
61
Schedule of Mineral Tenements
63
Venture Minerals Limited | 1
Chairman’s Letter to Shareholders
On behalf of the Directors of Venture Minerals Limited (“Venture”), I present to shareholders the
Company’s annual report for the year ended 30 June 2015.
The past twelve months have been a challenging time for the Company. Having worked diligently
during the previous years to position ourselves for production at the Riley DSO Project, receiving all
necessary approvals and completing pre-production work, it was with much regret that operations
had to be suspended in August 2014 due to significant deterioration in the iron ore market.
Substantial delays due to on-going appeals to our environmental approvals meant the Company was
unable to take advantage of strong iron ore prices throughout the preceding 18 months.
Subsequent to the suspension of operations at Riley, in June 2015 the Federal Court dismissed the
appeal against the environmental approvals.
The decision effectively delivers Venture
unencumbered approvals for any future development of the Riley iron ore mine. While the Riley
Project remains suspended, the Company remains well positioned should the economic environment
support a production decision in the near term. I commend the Company’s management and all
stakeholders for their diligence and perseverance in successfully advancing the Company’s projects
to where they are today and look forward to realising value for those projects in the future.
On the positive side for the Company, Venture was pleased with receiving granted tenure for its first
two prospects in northern Thailand. The granting of tenure is a result of the efforts over previous
years of targeting exploration opportunities in South East Asia. The Company will look to continue to
build a cost effective portfolio of exploration projects in the region over the medium term.
The past year has also seen a series of substantial cost cutting measures which included voluntary
salary reductions of up to 50% by directors, management and staff. This has allowed Venture to
maintain a strong cash position which will be able to fund a number of exploration programs in
Thailand from its current cash reserves.
While this has been a challenging year for shareholders and stakeholders alike, Venture remains
positive about the outlook for the current year. The Company is excited about exploring its prospects
in Thailand and will remain production ready at the Riley DSO Project should future iron ore prices
support a production decision.
The Directors and I look forward to meeting shareholders at the upcoming annual general meeting.
Mel Ashton
Chairman
Venture Minerals Limited | 2
Directors’ Report
For the year ended 30 June 2015
The Directors of Venture Minerals Limited submit herewith the consolidated financial statements of the
Company and its controlled entities for the financial year ended 30 June 2015 in order to comply with the
provisions of the Corporations Act 2001.
1.
Directors
The following persons were Directors of Venture Minerals Limited during the whole of the financial year and up
to the date of this report, unless otherwise stated:
Mr Mel Ashton
Mr Hamish Halliday
Mr Andrew Radonjic
Mr Bruce McFadzean
Mr John Jetter
2.
Non-Executive Chairman
Managing Director
Technical Director
Non-Executive Director
Non-Executive Director
Principal Activities
The principal activity of the consolidated entity during the financial year was mineral exploration. There were no
significant changes in the nature of the consolidated entity’s principal activities during the financial year.
3.
Group Financial Overview
Profit and Loss
The loss attributable to owners of the consolidated entity after providing for income tax amounted to $2,527,053
(2014: $5,730,604).
Financial Position
The consolidated entity had $3,260,962 in cash and cash equivalents as at 30 June 2015 (2014: $6,674,595). The
Directors believe the consolidated entity is in a sound financial position with sufficient capital to effectively
explore its current landholdings.
4.
Dividends Paid or Recommended
The Directors do not recommend the payment of a dividend and no amount has been paid or declared by way of
a dividend to the date of this report.
5.
Business Strategies & Prospects for the Forthcoming Year
Venture Minerals Limited is focused upon the exploration and development of mineral resources within its
current portfolio of projects in Tasmania and Thailand.
The Company has recently received granted tenure for three licence applications in Thailand. The licences are
within two prospects named “Pak Yang” and “Thali” and are located in the highly prospective Loei Belt, which
already hosts world class copper and gold deposits. First pass exploration on both prospects is currently
underway.
The Riley DSO Project has received all necessary environmental approvals and is in a state of readiness for an
immediate commencement of operations. Venture has already completed extensive pre-production work at Riley
and is in a strong position should the iron ore price improve and afford the Company the opportunity to
commence production with relatively short notice.
Venture Minerals Limited will continue to identify new mineral exploration opportunities within Australia and
the rest of the world, particularly South East Asia, for further potential acquisitions which may offer value
enhancing opportunities for shareholders.
Material business risks that may impact the results of future operations include further exploration results,
future commodity prices and funding.
Venture Minerals Limited | 3
Directors’ Report
For the year ended 30 June 2015
6.
Significant Changes in the State of Affairs
During the current year the Company suspended development operations of the Riley DSO Project in response to
the sharp fall in the iron ore price.
The Company received granted tenure for three exploration licences in Thailand. The licences are within two
prospects named “Pak Yang” and “Thali”.
There were no further significant changes in the state of affairs of the Company during the financial year.
7.
Review of Operations
Pre-development projects
Tasmanian Operations
The Tasmanian Operations are located in northwest Tasmania (Figure 1) approximately 125km south, by sealed
road, from the Port of Burnie. The tenement exploration area covers 186km2 encompassing the south and
eastern margins and metamorphic aureole of the Meredith Granite. The Meredith Granite is part of a suite of
Devonian granites which are associated with several world class tin deposits including Renison Bell Tin Mine
(Metals X Ltd/Yunnan Tin Group-231kt of tin metal produced since 1968), Mount Bischoff and Cleveland. In
addition to the tin deposits the granites are also associated with iron deposits (Savage River Magnetite Mine
operating for > 45 years, currently producing approximately 2.3 Mtpa of iron pellets), nickel deposits (Avebury),
and poly-metallic deposits (Rosebery - operating for +75 years).
The region has all necessary infrastructure in place with the operations located in close proximity to:
a sealed road,
existing rail (with spare capacity) via a sealed road,
existing port facilities (with spare capacity) via 100km of rail,
high voltage hydropower,
abundant water, and
existing mining support towns - Tullah (20kms east) & Rosebery (15kms east-south-east).
The Tasmanian Operations host three projects with the Company’s focus on the Mt Lindsay Tin-Tungsten Project
plus two nearby DSO hematite projects. The three projects that make up the Operations are:
Mt Lindsay Tin-Tungsten Project
Riley DSO Hematite Project
Livingstone DSO Hematite Project
Venture Minerals Limited | 4
Directors’ Report
For the year ended 30 June 2015
7.
Review of Operations (continued)
Figure 1 | Location Map for Mt Lindsay Tin-Tungsten Deposit/Riley DSO Deposit/Livingstone DSO Deposit
Mt Lindsay Tin-Tungsten Project
Exploration commenced on the Mt Lindsay Project in 2007 for skarn hosted tin-tungsten-magnetite
mineralisation. Since then Venture has completed approximately 83,000m of diamond core drilling and defined a
JORC compliant Measured, Indicated and Inferred Resources (refer Table 1).
Tin-Tungsten Resources
Table 1 | Mt Lindsay Tin-Tungsten Project Tasmania Resources - June 2015
Lower
Cut (Tin
equiv)
0.20%
0.45%
Category
Tonnes
Tin
Equiv.
Grade
Tin
Grade
Tungsten
Grade
(WO3)
Mass Recovery of
Magnetic Iron (Fe)
Grade
Copper
Grade
Contained Tin
Metal
(tonnes)
Contained Tin/
Tungsten Metal
(tonnes)
Measured
8.1Mt
0.6%
0.2%
0.1%
17%
0.1%
18,000
29,000
Indicated
17Mt
0.4%
0.2%
0.1%
15%
0.1%
32,000
43,000
Inferred
20Mt
0.4%
0.2%
0.1%
17%
0.1%
32,000
41,000
TOTAL
45Mt
0.4%
0.2%
0.1%
17%
0.1%
81,000
113,000
Measured
4.3Mt
0.8%
0.3%
0.2%
18%
0.1%
12,000
22,000
Indicated
5.2Mt
0.7%
0.3%
0.2%
15%
0.1%
14,000
22,000
Inferred
3.9Mt
0.6%
0.3%
0.1%
9%
0.1%
12,000
17,000
TOTAL
13Mt
0.7%
0.3%
0.2%
14%
0.1%
38,000
61,000
Venture Minerals Limited | 5
Directors’ Report
For the year ended 30 June 2015
7.
Review of Operations (continued)
Tin-Tungsten Resources
Table 2 | Mt Lindsay Tin-Tungsten Project Tasmania Resources - June 2014
Lower
Cut (Tin
equiv)
0.20%
0.45%
Category
Tonnes
Tin
Equiv.
Grade
Tin
Grade
Tungsten
Grade
(WO3)
Mass Recovery of
Magnetic Iron (Fe)
Grade
Copper
Grade
Contained Tin
Metal
(tonnes)
Contained Tin/
Tungsten Metal
(tonnes)
Measured
8.1Mt
0.6%
0.2%
0.1%
17%
0.1%
18,000
29,000
Indicated
17Mt
0.4%
0.2%
0.1%
15%
0.1%
32,000
43,000
Inferred
20Mt
0.4%
0.2%
0.1%
17%
0.1%
32,000
41,000
TOTAL
45Mt
0.4%
0.2%
0.1%
17%
0.1%
81,000
113,000
Measured
4.3Mt
0.8%
0.3%
0.2%
18%
0.1%
12,000
22,000
Indicated
5.2Mt
0.7%
0.3%
0.2%
15%
0.1%
14,000
22,000
Inferred
3.9Mt
0.6%
0.3%
0.1%
9%
0.1%
12,000
17,000
TOTAL
13Mt
0.7%
0.3%
0.2%
14%
0.1%
38,000
61,000
Note: Reporting to two significant figures. Figures have been rounded and hence may not add up exactly to the given totals. Full details of the estimate are
in the ASX announcement for the Quarterly Report on 17 October 2012.
The Sn equivalent formula used to calculate the Sn equivalent values for the Main and No.2 Skarns is as follows: Sn Equivalent (%) = Sn% + (WO3% x 1.90459) + (mass
recovery % of magnetic Fe x 0.006510) + (Cu% x 0.28019). Whereas for the Sn equivalent formula used to calculate the Sn equivalent values for the Stanley River South and
Reward Skarns is as follows: Sn Equivalent (%) = Sn% + (WO 3% x 1.65217) + (Cu% x 0.34783).
The mass recovery of the magnetic iron is determined mostly by Davis Tube Results (“DTR”).
The Sn equivalent formulae uses a tin metal price of US$23,000/t, an APT (Ammonium Para Tungstate) price of US$380/mtu (1mtu
=10kgs of WO3), a magnetite concentrate price of US$110/t and a copper metal price of US$8,000/t.
Pilot scale metallurgical testwork has been completed on the Main and No.2 Skarns with results indicating the metallurgical recovery for
tin is 72%, for WO3 is 83%, for iron in the form of magnetite is 98% and for copper is 58%. The results of this testwork are stated in the
ASX announcement of August 31 2012.
It is the Company’s opinion that the tin, WO3 and copper as included in the metal equivalent calculations for the Stanley River South and Reward Skarns have a reasonable
potential to be recovered for when the Mt Lindsay Project goes into production.
Table 3 | Reserve Statement Mt Lindsay Tin-Tungsten Project Tasmania - June 2015
Tin
Grade
Tungsten
Grade (WO3)
Mass
Recovery of
Magnetic Iron
(Fe) Grade
Copper
Grade
Contained Tin
Metal (tonnes)
Contained Tin/
Tungsten Metal
(tonnes)
Category
Tonnes
Tin
Equiv.
Grade
Proved
6.4Mt
0.7%
0.2%
0.2%
18%
0.1%
14,000
23,000
Probable
7.3Mt
0.5%
0.2%
0.1%
13%
0.1%
16,000
23,000
TOTAL
14Mt
0.6%
0.2%
0.1%
15%
0.1%
30,000
46,000
Venture Minerals Limited | 6
Directors’ Report
For the year ended 30 June 2015
7.
Review of Operations (continued)
Table 4 | Reserve Statement Mt Lindsay Tin-Tungsten Project Tasmania - June 2014
Tin
Grade
Tungsten
Grade (WO3)
Mass
Recovery of
Magnetic Iron
(Fe) Grade
Copper
Grade
Contained Tin
Metal (tonnes)
Contained Tin/
Tungsten Metal
(tonnes)
Category
Tonnes
Tin
Equiv.
Grade
Proved
6.4Mt
0.7%
0.2%
0.2%
18%
0.1%
14,000
23,000
Probable
7.3Mt
0.5%
0.2%
0.1%
13%
0.1%
16,000
23,000
TOTAL
14Mt
0.6%
0.2%
0.1%
15%
0.1%
30,000
46,000
Note:
Rounding conforming to JORC 2004 to appropriate levels of precision may cause minor computational errors.
The reserves are based on the resources announced in the Quarterly Report for the period ending 30 September 2012 on 17 October 2012.
The open pits for each deposit were optimised using the Whittle Four-X implementation of the Lerchs–Grossman algorithm. Ore selection within Whittle has been based on
cashflow. Ore is selected by comparing the cashflow which would be produced by processing versus the cashflow produced by mining it as waste. If the cashflow from
processing is higher, the material is treated as ore. If not, it is treated as waste. Material is defined as ore when revenue less fixed, mining, processing and realisation costs is
greater than zero.
The open pit deposits will be mined using conventional drill and blast and excavator and truck mining methods.
The underground deposit (represents 13% of total reserves) is proposed to be mine using Long Hole Open Stoping (“LHOS”) methods. Mining progresses down-dip/plunge
with rib pillars employed, to maintain regional stability. Development drives are established along the strike of the ore body. Once the extremities of the ore body are
reached, stoping progresses in a retreat manner back along strike. The LHOS method is successfully used in mines throughout Australia and overseas with a high safety
record.
The Sn equivalent formula used to calculate the Sn equivalent values for the Main Skarn is: Sn Equivalent (%) = Sn% + (WO3% x 1.9181) + (mass recovery % of magnetic Fe x
0.0064) + (Cu% x 0.232791). The Sn equivalent formula used to calculate the Sn equivalent values for the western extension to the Main Skarn is: Sn Equivalent (%) = Sn% +
(WO3% x 2.3174) + (mass recovery % of magnetic Fe x 0.0078) + (Cu% x 0.3111). The Sn equivalent formula used to calculate the Sn equivalent values for the No.2 Skarn is:
Sn Equivalent (%) = Sn% + (WO3% x 2.17993) + (mass recovery % of magnetic Fe x 0.00709) + (Cu% x 0.31006). The Sn equivalent formula used to calculate the Sn
equivalent values for the Reward Skarn is: Sn Equivalent (%) = Sn%.
The mass recovery of the magnetic iron is determined mostly by Davis Tube Results.
The Sn equivalent formulae use the Commodity Price Assumptions as listed in this ASX announcement.
Pilot scale metallurgical testwork has been completed on the Main and No.2 Skarns with results indicating the metallurgical recovery for tin is 72%, for WO3 is 83%, for iron
in the form of magnetite is 98% and for copper is 58%. The results of this testwork are stated in the ASX announcement of 31 August 2012. Whereas for the western
extension to the Main Skarn a metallurgical recovery for tin of 62% and for WO3 of 82% were used with the same magnetite and copper recoveries. A metallurgical recovery
for tin of 73% was used for the Reward Skarn.
In addition 1.7Mt of low grade material will be used to supplement mill feed during the later stages of the mine operations.
The resource base at Mt Lindsay is hosted within two magnetite rich skarns (Main Skarn and the No.2 Skarn)
which extend over a total strike of 2.8kms and remain open at depth. Additional indicated and inferred resources
have been defined at the Reward and Stanley River South Prospects, which extend over an additional 1.1km of
strike.
In 2012 the resource base at Mt Lindsay was the subject of a Bankable Feasibility Study (“BFS”) which
entertained a 1.75 million tonne per annum operation, producing concentrates of tin, tungsten, copper and
magnetite. The study delivered an NPV8 of A$143m from a 9 year mine life with a capital cost estimate of
A$198m. Full details of the reserve statement and BFS outputs and a list of assumptions are in the ASX
announcement of 7 November 2012.
On 3rd July 2014, the Tasmanian Minister of Mines granted a mining lease over the Mt Lindsay Tin-Tungsten
Project.
Venture Minerals Limited | 7
Directors’ Report
For the year ended 30 June 2015
7.
Review of Operations (continued)
Mt Lindsay Exploration
Over the last 12 months Venture has focussed its efforts on identifying additional high grade tin-tungsten targets
in close proximity to the Mt Lindsay Deposit. The low cost exploration work is part of a broader strategy focussed
on identifying high grade mineralization within trucking distance of the existing deposit that has the potential to
further strengthen the economics of the Mt Lindsay Project.
The Company has successfully defined eight new targets considered prospective for high grade tin/tungsten
mineralization as well as targets prospective for copper and nickel mineralization (refer Figure 2). These targets are
hosted within the broader skarn units identified throughout the Mt Lindsay area of which to date only 10% have
been drill tested.
Initially, Venture successfully identified three new prospects, located only 2km south west of the Mt Lindsay
Deposit (refer Figure 2). These were defined by electromagnetic (“EM") anomalies extending over a combined strike
length of 4.5km. One of these new anomalies was partially tested by one previously drilled hole intersecting 2m
@ 1.1% tin (Refer ASX announcement 23 October 2014), suggesting the area has potential for high grade tin
mineralization. This is further supported by being adjacent to the interpreted northern extension of the FederalBassett Fault, which is the dominant structure for mineralization at the world class Renison Tin Mine located
only 15km to the south of Mt Lindsay.
The Company then defined an additional target next to the three new prospects with a coincident EM and
geochemical anomaly which is situated within the granted mining lease. The new prospect is also favourably
located within a fold in the northern extension of the Renison Mine Sequence.
Following on, Venture identifed a further four prospects defined by a series of EM targets as well as coincident
EM and geochemical anomalies. Two of these targets are situated within the Company’s granted mining leases
and are hosted within the broader skarn units identified throughout the Mt Lindsay area.
Towards the end of the year Venture continued to work on identifying new target areas in close proximity to the
Mt Lindsay Deposit.
Venture Minerals Limited | 8
Directors’ Report
For the year ended 30 June 2015
7.
Review of Operations (continued)
Figure 2 | Mt Lindsay - recently identified exploration targets
Venture Minerals Limited | 9
Directors’ Report
For the year ended 30 June 2015
7.
Review of Operations (continued)
Riley DSO Hematite Project
The 100% owned Riley DSO Project is located 10km from the Mt Lindsay Project (refer Figure 1) and occurs as a
hematite rich pisolitic and cemented laterite. The deposit is all at surface, located less than two kilometres from a
sealed road that accesses existing rail and port facilities.
A maiden resource statement of 2mt @ 57% Fe was defined in 2012 (refer Table Five) which resulted in the
Company doubling its overall DSO resource base, including the Livingstone Deposit, to 4.4mt @ 57% Fe.
Table 5 | Resource Statement - Riley DSO Project Tasmania – June 2015
Resource
Tonnes
Fe (%)
Fe (%)
Calcined
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
Cr (%)
LOI (%)
Indicated
2.0mt
57
61
3.7
2.6
0.03
0.08
2.8
7.7
*Refer to ASX announcement on 26 July 2012.
Table 6 | Resource Statement - Riley DSO Project Tasmania - June 2014
Resource
Tonnes
Fe (%)
Fe (%)
Calcined
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
Cr (%)
LOI (%)
Indicated
2.0mt
57
61
3.7
2.6
0.03
0.08
2.8
7.7
*Refer to ASX announcement on 26 July 2012.
Following completion of the resource Venture engaged independent mining engineers, Rock Team to complete
mining studies on the deposit and produce a reserve statement. With all the hematite resources at Riley located
at or near surface, the study delivered a 90% conversion rate of resource to reserve (refer Table Seven).
Table 7 | Reserve Statement - Riley DSO Project Tasmania - June 2015
Reserve
Tonnes
Fe (%)
Fe (%)
Calcined
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
Cr (%)
LOI (%)
Probable
1.8mt
57
61
3.7
2.6
0.03
0.07
2.8
7.8
*Refer to ASX announcement on 26 July 2012.
Table 8 | Reserve Statement - Riley DSO Project Tasmania - June 2014
Reserve
Tonnes
Fe (%)
Fe (%)
Calcined
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
Cr (%)
LOI (%)
Probable
1.8mt
57
61
3.7
2.6
0.03
0.07
2.8
7.8
*Refer to ASX announcement on 26 July 2012.
Venture Minerals Limited | 10
Directors’ Report
For the year ended 30 June 2015
7.
Review of Operations (continued)
Having achieved all necessary approvals for the development of the project as well as secured both debt and
equity requirements, the Company was well placed to take advantage of higher iron ore prices throughout 2013.
Unfortunately delays suffered due to on-going appeals to the project’s approvals saw the production timeline
delayed until mid-2014, which coincided with a marked deterioration in the economic environment driven
principally by a substantial decline in the iron ore price.
Although the Company made the decision to suspend operations in August 2014, Venture had already completed
extensive pre-production work at the Riley Project putting in place all the necessary requirements to commence
mining. This work has placed Venture in a strong position should the iron ore price improve and afford the
Company the opportunity to commence production, on relatively short notice, and take advantage of any future
appreciation in the iron ore price.
Late June 2015, Venture received positive news from the Federal Court dismissing the appeal against the
environmental approvals for the Riley DSO Project. The decision effectively delivers Venture unencumbered
approvals for any future development of the Riley iron ore mine. The Federal Court decision in both the original
case and the recent appeal awarded costs in favour of Venture. The Company will continue to actively seek the
recovery of all legal costs associated with both cases.
Livingstone DSO Hematite Project
Located only 3.5km from the Company’s flagship Mt Lindsay Tin-Tungsten Deposit is the 100% owned
Livingstone DSO Hematite Deposit (refer Figure 1). Livingstone consists of an outcropping hematite cap overlaying
a magnetite rich skarn. The hematite occurs from surface, is consistent in grade and located only 2km from a
sealed road which accesses existing rail and port facilities.
A maiden resource statement of 2.2mt @ 58% Fe was defined at Livingstone in 2011, which was followed by a
positive and robust scoping study. Additional work later in 2011 included blending and sizing testwork and
preliminary mining studies, all of which delivered positive results.
During the second half of 2012 the Company completed a resource upgrade, which resulted in 100% of the
inferred resources being converted to the indicated category.
The Livingstone project area was granted as a mining lease on 28 May 2012 subject to Legislative requirements,
including environmental and local council approvals, being satisfied and obtained.
The Livingstone DSO Resource and Reserve statements are detailed in Tables 9 and 11.
Table 9 | Resource Statement Livingstone DSO Project Tasmania - June 2015
Resource
Tonnes
Fe (%)
Fe (%)
Calcined
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
LOI (%)
Indicated
2.4mt
57
61
5.4
1.9
0.07
0.05
7.0
*Refer to ASX announcement on 26 July 2012.
Table 10 | Resource Statement Livingstone DSO Project Tasmania - June 2014
Resource
Tonnes
Fe (%)
Fe (%)
Calcined
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
LOI (%)
Indicated
2.4mt
57
61
5.4
1.9
0.07
0.05
7.0
*Refer to ASX announcement on 26 July 2012.
Venture Minerals Limited | 11
Directors’ Report
For the year ended 30 June 2015
7.
Review of Operations (continued)
Table 11 | Reserve Statement - Livingstone DSO Project Tasmania – June 2015
Reserve
Tonnes
Fe (%)
Fe (%)
Calcined
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
LOI (%)
Probable
2.2mt
57
62
5.3
1.9
0.08
0.03
7.1
*Refer to ASX announcement on 26 July 2012.
Table 12 | Reserve Statement - Livingstone DSO Project Tasmania – June 2014
Reserve
Tonnes
Fe (%)
Fe (%)
Calcined
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
LOI (%)
Probable
2.2mt
57
62
5.3
1.9
0.08
0.03
7.1
*Refer to ASX announcement on 26 July 2012.
During the year, results from a preliminary screening program demonstrated that significant beneficiation of
clay-rich gossanous material at Livingstone to +58% Fe grades should be possible in many cases. The next steps
involve further testwork, followed by detailed evaluation and modelling that will be required to calculate
whether a significant tonnage could be added to the DSO resources at similar grades or whether an appreciable
upgrade in the iron grade of the current resource could be achieved.
Venture Minerals Limited | 12
Directors’ Report
For the year ended 30 June 2015
7.
Review of Operations (continued)
Exploration Projects
South East Asia Initiative
Venture continues to progress its strategy of targeting Southeast Asia for exploration opportunities and has
identified an extensive belt of “skarn style” mineralisation throughout the region specifically targeting strategic
metals such as tin and tungsten as well as other base and precious metals.
The Company established a low cost regional office in the region and will look to continue to build a cost effective
portfolio of exploration projects over the medium term.
Venture significantly advanced opportunities in Southeast Asia following the receipt of granted tenure in
northern Thailand in June 2015.
The first two prospects named “Pak Yang” and “Thali” are located in the highly prospective Loei Belt, which
already hosts world class copper and gold deposits including Kingsgate’s “Chatree” deposit (+5Moz Au*) and
PanAust’s “Phu Kham” deposit (1.3Mt Cu, 1.8Moz Au*) (refer to Figure 3).
Work commenced late in the year at both the Thali and Pak Yang prospects, which already host identified “skarn”
style mineralization. The on-going work programs include detailed geological mapping, rock chip sampling and a
first pass soil sampling program.
Figure 3 | Prospect location map - Thailand
*Total mineral endowment which includes the published production till the end of 2014 and current mineral resources
Venture Minerals Limited | 13
Directors’ Report
For the year ended 30 June 2015
7.
Review of Operations (continued)
Paulsens South Project, Western Australia
The Paulsens South Project was surrendered during the year.
Harris Bluff Project, South Australia
The Company has withdrawn from the joint venture with Doray Minerals.
Corporate Governance and Internal Controls
Venture ensures that the Mineral Resource and Ore Reserve estimates are subject to appropriate levels of
governance and internal controls. The Company periodically reviews the governance framework in line with the
expansion and development of the business.
The Mineral Resource estimates are prepared internally by highly competent and qualified professionals. The
Competent Person named by the Company is a Member of The Australasian Institute of Mining and Metallurgy.
Internal reviews are carried out on the quality of the database and geological models prior to estimation.
Ore Reserve estimates are prepared by independent external consultants who are highly competent and qualified
professionals. The Competent Person named by the Company is a Member of The Australasian Institute of Mining
and Metallurgy. Internal and external reviews are carried out on the quality of the database and geological
models prior to estimation.
8.
Matters Subsequent to the End of the Financial Year
No matter or circumstances has arisen since 30 June 2015 that has significantly affected the group’s operations,
results or state of affairs, or may do so in future years.
9.
Likely Developments and Expected Results of Operations
The Company will continue its mineral exploration activity at and around its exploration projects in Thailand and
Tasmania with the object of identifying commercial resources.
The Company will continue to monitor the iron ore price and exchange rates and will remain production ready at
the Riley DSO Hematite project in Tasmania. Should there be a favourable movement in the project economics,
the Company is in a position to commence production with relatively short notice.
Further inform
Share your feedback