March 2024 Quarterly Activities Report
HIGHLIGHTS
Brothers REE Project (including Jupiter Rare Earths discovery), Western Australia
• Venture reached 70% ownership of JV on Jupiter with the Company forging ahead towards
90% ownership following completion of the Stage One Resource definition drill program.
• The first batch of results released from the stage one resource drilling definition drill
program (ASX announcement 9 February 2024) with an Australian record clay hosted record
•
drill intersection of 48 m @ 3,025 ppm TREO.
The second batch of results released (ASX announcement 8 March 2024) including a record
intersection of over 5,000 ppm neodymium and praseodymium oxides. Drilling continued to
intersect consistent high-grade zones of +2000ppm TREO over 20-30 m widths,
• The final batch of results were released post quarter end (ASX announcement 16 April 2024)
including up to 60 m at over 2000 ppm TREO. The final batch achieved the 2nd, 3rd and 4th
best drill intersections at Jupiter to date.
• Stage Two Resource definition drill program also now completed with the initial results
•
expected in May 2024.
A key landholding was acquired providing a key link between the large-scale, clay hosted
Jupiter prospect and Venture’s northern tenure, which hosts significant rare earth
mineralisation only 10 km from the Jupiter discovery.
Mount Lindsay Tin-Tungsten Project
•
•
Curtin University continued the metallurgical testwork on extraction of tin, boron, and iron
from tin-iron borates to potentially significantly increasing the tin recovery and producing a
high value boron by-product .
Tin Price recently reached US$36,000 per tonne which is nearing two-year highs and
equates to over 40% increase since the start of 2024, the highest of any other base metals.
Riley Iron Ore Mine
•
•
Appointment of Argonaut PCF as advisor on the Riley Iron Ore Mine to undertake a
strategic review of the asset.
Preparation of data room and initial market sounding process underway.
Corporate
•
•
•
•
Cash Position of $2.9 million as at 31 March 2024.
Receipt of the ATO R&D incentive scheme claim of $1m.
Acuity At-the-Market funding received of $1m.
Mr John Jetter resigned effective 31 March 2024 as part of the Board renewal process.
Venture Minerals Limited | ASX: VMS/VMSO
Level 2, 16 Altona Street, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
ASX: VMS
Brothers REE Project (including the clay hosted Jupiter Rare Earths prospect),
Western Australia
Activities during the March Quarter
Venture Minerals successfully completed the Stage One Resource definition drill program (Refer to Figure 1) at
the large-scale, clay hosted Jupiter Rare Earths Elements (“REE”) prospect at the Brothers Project located in
the Mid-West region of Western Australia. The completion of the program enabled Venture to reach the 70%
expenditure milestone for the JV covering the 40 km2 target, with the Company now forging ahead to 90%
ownership (Refer to ASX announcements 16 January 2024).
The Jupiter Stage One Resource definition drill program was completed late last year with 82 holes drilled for
5,052 m on a 1000 m x 500 m spaced pattern across the 40 km2 target. The final drill program consisted of 30
Aircore (“AC”) drill holes completed for 1,803 m and 52 Reverse Circulation (“RC”) holes completed for 3,249
m. The drill program was designed to supplement the previous high-grade clay hosted REE drilling results
within the Jupiter target (Refer to ASX announcements 1 August 2023, 9 November 2023 and 29 November 2023) and to
increase the level of confidence in the grade and scale of the mineralisation in preparation for a Maiden Clay
Hosted REE estimation for Jupiter.
The first batch of assay results from the Stage One Resource definition drill program at Jupiter includes
the headline result of 48 m @ 3,025 ppm TREO1 in BRRC 71 which is the highest grade, clay hosted REE
intersection in Australia. In addition, there are very high-grade results in both BRRC 031 & 074 including
assays up to 10,266 ppm & 20,538 ppm TREO respectively, with the latter being one of the highest clay
hosted REE assay results in Australia to date (Refer to ASX announcements 16 January 2024).
Table One: Jupiter Drill Intersection Highlights – First Batch of Results
Hole No.
BRAC061
BRRC031
Intersection(m)
28
30
TREO (ppm)
1,849
3,142
BRRC032
BRRC034
BRRC069
BRRC071
BRRC072
BRRC074
BRRC078
32
60
42
48
50
16
56
1,637
1,487
1,839
3,052
1,722
5,399
1,607
including
12 m @ 4,673 ppm and
2 m @ 10,266 ppm
14 m @ 2,313 ppm
4 m @ 2,046 ppm
28 m @ 2,067 ppm
20 m @ 2,519 ppm
2 m @ 20,538 ppm
24 m @ 2,060 ppm
Assay results for 23 of the 24 (96%) drill holes received, again returned consistent 20-30 m widths of REE
mineralisation grading over 2,000 ppm TREO within broader zones up to 60 m grading well over 1,000 ppm
TREO with extremely low levels of Thorium and Uranium, which is very similar to the results announced in
the previous drill program of 25 RC drill holes (Refer to ASX announcement 29 November 2023).
The Magnet Rare Earth Oxides (MREO2) assays received include several over 1,000 ppm Nd2O3
(Neodymium oxide) up to 3,288 ppm, and several over 300 ppm Pr6O11 (Praseodymium oxide) up to 788
ppm, and a several over 50 ppm Dy2O3 (Dysprosium oxide) up to 674 ppm, and several over 10 ppm Tb2O3
(Terbium oxide) up to 101 ppm.
The second batch of assay results from the recently completed Stage One drill program at Jupiter includes
a record intersection of 5,056 ppm NdPr oxides in BRRC 061 with 3,824 ppm Nd2O3 and 1,232 ppm Pr6O11.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 2
2
In addition, there are very high-grade results in both BRRC 061 & 076 including assays up to 13,906 ppm
TREO.
This batch of assay results from the drilling completed late last year continued to deliver consistent highgrade zones (+2,000ppm TREO) over 20-30 m widths, within broader zones up to 72 m grading well over
1,000 ppm TREO with Thorium and Uranium levels remaining consistently extremely low. These results
continue to validate geophysics and cover only a small portion of the 40 km2 Jupiter target.
Table Two: Jupiter Drill Intersection Highlights – Second Batch of Results
Hole No.
BRAC043
Intersection(m)
48
TREO (ppm)
1,658
BRRC043
BRRC045
BRRC046
BRRC047
BRRC061
BRRC075
BRRC076
BRRC080
72
36
42
30
9
41
25
42
1,406
1,991
1,819
1,537
5,020
1,521
2,711
2,154
including
10 m @ 2,124 ppm and
14 m @ 2,044 ppm
28 m @ 2,309 ppm
22 m @ 2,070 ppm
12 m @ 2,326 ppm
2 m @ 13,906 ppm
14 m @ 2,109 ppm
12 m @ 4,131 ppm
16 m @ 3,324 ppm
1.TREO represents the sum of 14 Rare Earth Elements excluding Promethium plus Yttrium expressed as oxides.
2.MREO represents the sum of the Neodymium, Praseodymium, Dysprosium and Terbium expressed as oxides.
The Stage Two Resource definition drill program at Jupiter commenced in early March 2024. This planned
300 drillhole program will bring the drill density across the 40 km2 target to a 500 m x 250 m spacing.
On 22 March 2024, the company announced the acquisition of a key landholding adjacent to the Jupiter
REE Discovery that sits between the large-scale, clay hosted Jupiter Rare Earths prospect and additional
Rare Earth mineralisation located 10 kilometres to the north (Refer to Figure 2) including drill intersections up
to 45 m @ 1,455 ppm TREO including 15 m @ 2,105 ppm TREO, from the first reconnaissance drill
program (Refer to ASX announcement 1 August 2023).
This key landholding is part of a 361 km2 strategic tenement package acquisition (through the tenement
application process) that complements the existing tenure and expands the project by 36% and secures
the remaining priority clay hosted, Rare Earth targets within the immediate vicinity of the Jupiter discovery.
Post quarter end, the third and final batch of assays from the Stage One Resource Definition drill program
were released (Refer to ASX announcement 16 April 2024).
The latest drill results include some of the best intersections recorded to date including up to 60 metres at
over 2000 ppm TREO. In addition, the Stage Two Resource Definition Drilling Program, which includes
approximately 250 drill holes, has now been completed, well ahead of schedule.
Included in this third batch of assay results is the 2nd, 3rd & 4th best drill intersections (BRAC044,
BRAC047 & BBRC074) seen at Jupiter to date. In addition, there are very high-grade results in BRAC047
including assays up to 26,958 ppm TREO.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 3
3
Figure 1 | Jupiter 40 km2 target with drill hole locations and updated significant intersections on
Bouger gravity 2.67 anomaly as defined by recent high resolution ground gravity surveying. For
marked east-west section lines refer to ASX announcement 16 April 2024 for the drill cross sections.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 4
4
Table Three: Jupiter Drill Intersection Highlights – Third Batch of Results
Hole No.
BRAC044
BRAC047
BRAC052
BRAC053
BRAC056A
BRAC057
BRAC064
BRAC065
BRAC067
BRRC074*
Intersection(m)
60
39
40
50
37
50
24
42
37
79
TREO (ppm)
2,014
2,960
1,466
1,611
1,447
1,852
1,792
1,320
2,211
1,805
including
22 m @ 3,024 ppm
18 m @ 5,206 ppm
8 m @ 2,158 ppm
24 m @ 2,048 ppm
10 m @ 2,568 ppm
38 m @ 2,120 ppm
12 m @ 2,227 ppm
10 m @ 2,065 ppm
16 m @ 3,337 ppm
14 m @ 6,054 ppm incl
2 m @ 20,538 ppm
The Stage Two Drill Program was completed with 246 AC holes drilled for a total of 14,370 metres. This
drill program will bring the drill density across the 40 km2 target to a spacing that will provide the necessary
data for a Maiden Resource estimate at Jupiter.
This final batch of assay results from the drilling completed late last year continued to deliver consistent
high-grade zones (+2,000ppm TREO) over 20-30 m widths, within broader zones up to 79 m grading well
over 1,000 ppm TREO with Thorium and Uranium levels remaining consistently extremely low. These
results continue to validate geophysics over the entire 40 km2 Jupiter target.
Assay results for 71 of the 78 (91%) drill holes received so far from the Stage One Resource definition
drill program, have results >1,000 ppm TREO. These results are very similar to the results announced in
the previous drill program of 25 RC drill holes at Jupiter (Refer to ASX announcement 29 November 2023).
The MREO continues to average 23% in intersections over +1,000 ppm TREO. In addition, there are
elevated levels of Samarium oxide with several over 100 ppm Sm2O3 up to 389 ppm.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 5
5
Figure 2 | Brothers Project combined granted (granted & pending) tenure on regional geology with
total magnetic intensity image highlighting large interpreted alkaline intrusion & clay hosted REE
mineralisation at Jupiter.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 6
6
Figure 3 | Location Map of the Brothers REE Project with the Jupiter Target, in Western Australia,
showing new additional tenement applications.
Project Background
Venture currently holds a significant tenement package of 1,464km2 of prospective REE tenure (Brother’s
Project – 1,353 km2 and Bandy Project - 111 km2) in Western Australia following the company’s strategy
to increase its exposure to the Rare Earth Element space, with a particular focus on the clay hosted REE
mineralisation type.
The Jupiter Prospect is subject to a JV earn-in agreement to earn into the Iron Duke REE project and
Venture has earned a 70% interest in the project with a clear path to earn 90% (Refer to ASX announcement 18
May 2023).
Brothers is well located in regional Western Australia (Refer to Figure 3) away from any significant population
centres but close to infrastructure with a nearby bitumen highway and gas pipeline on route to the major
port of Geraldton 300km away. Brothers is also only ~250 kms from Iluka’s Eneabba Rare Earths Refinery
to be in production in 2025 (Refer to ASX: ILU announcement “Eneabba Rare Earths Refinery – Final Investment Decision” 3
April 2022) and only ~520 kms from Lynas Rare Earths currently operating Mount Weld Concentrator.
As part of Iluka Resources Limited’s decision to build the Eneabba Rare Earths Refinery it had reached
an agreement of a risk sharing arrangement with the Australian Government, including a non-recourse
loan of $1,050 million plus a $200 million cost overrun facility under the Australian Government’s $2 billion
Critical Minerals Facility, administered by Export Finance Australia. Iluka’s close collaboration with the
Australian Government reflects the alignment of their commercial objectives for its rare earths business
with the Commonwealth’s Critical Minerals Strategy.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 7
7
Lynas is currently commissioning its new Rare Earths Processing Facility in Kalgoorlie, on 22 July 2021,
it announced that it was awarded a $14.8 million grant as part of the Australian government’s Modern
Manufacturing Initiative’s Manufacturing Translation Stream for Resources Technology and Critical
Minerals Processing. The grant was given to enable Lynas to commercialise an industry-first Rare Earth
carbonate refining process. In addition, Lynas announced on the 3 August 2022 an ~$500m project to
expand capacity at the Mount Weld mine and concentration plant to meet accelerating market demand
for rare earth materials. The combined project clearly supports the Australian Government’s Critical
Minerals Strategy and the Western Australian Government’s Battery and Critical Minerals Strategy.
The substantial co-investment by two of Australia’s major mining companies with the Australian
Government into the Rare Earths industry within the same region of Western Australia that Venture’s
Brothers Project sits put it in an enviable position and provides the Company with significant commercial
advantages should the project move towards development.
Mount Lindsay Project, Tin-Tungsten, North West Tasmania
Activities during the March Quarter
Studies – Tin and Boron
In 2023, Venture engagement Curtin University to commence the next stage of metallurgical test work on
the Mount Lindsay tin-rich borates. This program will follow on from the stage 1 work successfully
completed by CSIRO.
The program will investigate the extraction of tin, boron, and iron from tin-iron borates, potentially
significantly increasing the tin recovery and producing a high value boron by-product resulting in another
revenue stream to the Mount Lindsay project.
Venture believes the inclusion of tin-rich borates into the current underground feasibility studies could
deliver a major economic benefit to the study through the recovery of boron and additional tin and iron
from the tailings circuit of the current processing flowsheet, which has the economic advantage of already
been mined and processed.
During the quarter, the work program continued with a site visit undertaken by Curtin University and
Venture’s technical team, tin-iron borate mineral separation work which includes grind establishment and
sizing, magnetic separation, hydro cyclone separation, and micro and batch flotation. In addition,
hydrometallurgical testwork flowsheets that have been identified for testwork include direct acid leaching,
and reductive and oxidative alkaline roasts followed by leaching. The Company looks forward to delivering
results from this testwork within the coming months.
The Tin Price recently reached US$36,000 per tonne (US$35,685 on 19 April 2024) which is nearing twoyear highs and equates to over 40% increase since the start of 2024, the highest of any other base metals.
The price is currently at US$33,000 per tonne.
Exploration
Exploration during the quarter was limited to an extensional soil sampling program following-up on tin
targets to the west of Mount Lindsay.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 8
8
Project Background
The Mount Lindsay Project (178 km2) is located in north-western Tasmania (Refer Figure 4) within the contact
metamorphic aureole of the highly perspective Meredith Granite. The project sits between the world class
Renison Bell Tin Mine (Metals X Ltd/Yunnan Tin Group >230kt of tin metal produced since 1968) and the
Savage River Magnetite Mine (operating for >50 years, currently producing approximately 2.5 Mtpa of
iron pellets). Mount Lindsay has excellent access to existing infrastructure including hydropower, wind
power, water, sealed roads, rail and port facilities.
Venture owns 100% of the tenure that hosts both the Mount Lindsay Tin-Tungsten Deposit and all of the
surrounding prospects. Since 2007, Venture has completed circa 100 kilometres of diamond core drilling
at Mount Lindsay and defined JORC compliant Measured, Indicated and Inferred Resources (Refer to ASX
announcement 17 October 2012). The resource base at Mount Lindsay is hosted within two magnetite rich skarns
(Main Skarn and the No.2 Skarn) which extend over a total strike of 2.8 km and remain open at depth.
Additional indicated and inferred resources have been defined at the Reward and Stanley River South
Prospects, which extend over an additional 1.1 km of strike.
The Mount Lindsay Project (Refer Figures 5 & 6) is already classified by the Australian Government as a
Critical Minerals Project2 with an advanced Tin-Tungsten asset, which is significantly enhanced by the
recent discovery of two new skarn zones, one within the Renison Mine Sequence in the Mount Lindsay
area and the other along strike from Mount Lindsay’s main tin deposits (Refer to ASX announcement 27 September
2021). Mount Lindsay is one of the largest undeveloped tin projects in the world, containing in excess of
80,000 tonnes of tin metal (Refer ASX announcement 17 October 2012) and within the same mineralised body a
globally significant tungsten resource containing 3,200,000 mtu (metric tonne unit) 1 of WO3. The
Australian Government is supporting the Critical Minerals Sector through several initiatives including the
establishment of a A$2 billion finance facility announced in September 2021 to be administered by Export
Finance Australia which Venture is working to access for the project.
In October 2023, the Government announced a A$2 billion expansion of the Critical Minerals Facility,
bringing the total financing available under the Facility to A$4 billion. Further, in December 2023, the
Australian Government updated its Critical Minerals List and introduced a new Strategic Materials List,
(including Tin) recognising the importance of certain materials in the global transition to net zero and in
broader strategic applications2.
Tin is now recognised as a fundamental metal to the battery revolution and new technology. The
International Tin Association recently stated “As the awareness of tin’s importance grows, so too will the
need to secure supply. The organisation highlighted the scale of new investment required to meet the
expected surge in demand. It estimates that $1.4 billion is needed to deliver 50,000 tpa more tin by 2030”
(world tin consumption was 380,600t in 20223).
Venture’s recent study work identified the potential for additional, large-scale quantities of tin and boron
throughout the greater Mount Lindsay skarn system (Refer Figures 6). The tin-boron zones are in the form of
borate minerals and have not previously been assessed in any mining studies at Mount Lindsay. The
borate minerals containing a large amount of Boron, a critical mineral in the solar panel industry, not only
occur within the current Mount Lindsay resource base (Refer Figure 6), but also occur extensively throughout
the numerous skarns surrounding the Company’s current tin-tungsten deposits. The quantum of Boron
within the Mount Lindsay deposits, and surrounding exploration Targets areas can be highlighted by the
drill intersections released in Venture’s ASX Announcement dated 13 April 2023.
Venture has engaged Curtin University to undertake the metallurgical testwork for extraction recovery of
tin from the borates. Curtin has been named the first of Australia’s Trailblazer universities to receive a
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 9
9
share of more than $242 million in federal government funding, to develop a research commercialisation
hub to turn research outputs into breakthrough services, products and businesses. Curtin is leading the
Resources Technology and Critical Minerals Trailblazer hub which is part of the recently announced
Federal Government’s Trailblazer Universities Program.
The Mount Lindsay deposits, and the surrounding exploration target areas are all defined as skarn style
mineralisation and are closely analogous to well-known large skarn deposits in Russia and China, which
contain the same borates that exist at Mount Lindsay. The CSIRO study confirmed that both China and
Russia commercially extract large volumes of boron and iron from these deposits, initial testwork by
CSIRO returned results suggesting the recovery of tin from the borates was commercially possible.
Boron is now included in the European Commission’s Critical Raw Materials Act and is considered vital
to the green energy transition. In addition to boron’s use in solar panels, up to 50kg of boron material is
required in the construction of Electric Vehicles. Currently Australia does not produce boron, but instead
relies on supply from large producers such as Turkey, which comes with potential disruption and the risk
of political instability.
Boron (Borates) is on the European Commission’s list of minerals to feed the green energy transition in
the recently released Critical Raw Materials Act (CRMA) and is also on Japan’s Critical Minerals list1, and
importantly is not produced in Australia. Over 80% of the World’s Boron is produced by two companies
Rio Tinto (Boron Mining Operations in California, USA since 1927) and Eti Maden AS (State owned
Enterprise of Turkey) which produce over 50%.Ioneer (ASX: INR, Market Cap of A$590 million as at 15
August 2023) is looking to develop Rhyolite Ridge Project in Nevada (INR released a JORC Total Mineral
Resource of 459.5 Million Tonnes @ 0.46%2 Boron on 31 October 2017), whilst 5E Advanced Materials
(ASX: 5EA, Market Cap of A$150 million as at 15 August 2023) is commissioning the plant for the Boron
Americas (Fort Cady) Complex in California (5EA released a JORC Total Mineral Resource of 120.4
Million Tonnes @ 2.02% Boron2 on 3 December 2018), both are being touted as a replacement for the
Rio Tinto USA based mine supply as the reserves diminish.
1.
2.
https://www.csis.org/analysis/geopolitics-critical-minerals-supply-chains
To covert B to B2O3 multiply by 3.218. To convert B2O3 to H3BO3 multiply by 1.776.
1. Generally quoted as US dollars per mtu of tungsten trioxide (WO3).
2. Refer to ‘Australian Critical Minerals Prospectus’ report prepared by the Australian Government represented by the Australian
Trade and Investment Commission (Austrade) and Geoscience Australia, January 2024.
3. DATA: International Tin Association
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 10
10
Figure 4 | Location Map for Mount Lindsay Tin-Tungsten Deposit, Riley Iron Ore Mine &
Livingstone DSO Deposit
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 11
11
Figure 5 | Mount Lindsay Project: Geology Map showing High Grade Tin-Tungsten Targets and Tin-Boron Skarns
*See Metals X Announcement “2023 Renison Mineral Resource Update”, 28 September 2023.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 12
12
Riley Iron Ore Mine, North West Tasmania
Activities during the March Quarter
Venture engaged Argonaut PCF on 30 January 2024 as advisor on the Riley Iron Ore Mine to undertake
a strategic review of the asset.
Argonaut PCF is a specialist natural resources advisor with leading expertise and a proven track record
of assisting metals and mining companies critically assess and optimise the value of assets.
The review follows the lapse of the offtake agreement with Prosperity Steel, which allows the Company
to now consider all options in relation to the future of the Riley Iron Ore Mine.
The strategic review included an initial assessment of the project including a potential restart, joint venture
or an asset sale, focusing on delivering near term value for the Company and our shareholders.
Interest in the project from third parties including potential offtake and joint venture partners remains
strong, the Company will consider the full range of pathways to unlock the commercial value of the project
for Venture shareholders.
The advisors have undertaken a review, built a data room and undertaken a market sounding process
and look forward to providing an update as it progresses in the coming months.
During the period, the mining licence renewal was granted by Mineral Resources Tasmania.
Project Background
The 100% owned Riley Iron Ore Mine (Riley DSO Hematite Project) is located 10 km from the Mount
Lindsay Deposit (Refer Figure 4) and occurs as a hematite rich pisolitic and cemented laterite. The deposit
is all at surface, located less than 2 km from a sealed road that accesses existing port facilities.
In September 2021, the company mined and shipped 43kt of iron ore from Riley and following completion
of the first shipment the Mine has been on care and maintenance.
South West Project, Nickel-Copper-PGE, Western Australia (Chalice Earn-in at 51%)
Activities during the March Quarter
A total of 76 infill laterite samples were collected during the quarter over a previously defined Sn-Ta
anomaly (~2km2 grid) and results have extended the Sn and Ta anomalism to ~2.5km x 1km. A followup soil sampling program is planned in Q2 CY24 to infill this anomaly on a 400m x 50m sample spacing
and to check for any prospective pegmatite geology.
Results were returned for infill sampling over one priority Lithium-Caesium-Tantalum (LCT) target which
failed to extend the Li anomalism. Subsequent field checking did not locate any pegmatite geology in
laterite and clay regolith and no further work is planned.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 13
13
Project Background
The South West Project contains the Thor and Odin Prospects within its tenement package (256 km²)
and is located ~240 km south of Perth, hosted within the Balingup Gneiss Complex. A joint venture
between Teck Cominco and BHP Billiton, first identified this area as being prospective for base and
precious metals hosted within the complex. The joint venture completed surface sampling and airborne
EM surveys which culminated in the discovery of a base and precious metals deposit (Kingsley Prospect)
which Teck identified as a meta-Volcanic Massive Sulfide (“VMS”) system in high grade metamorphic
rocks. Venture’s nearby Thor prospect hosts a strong and coherent arsenic in laterite anomaly, with
locally elevated levels of copper, zinc, tin, bismuth, tungsten and antimony, elements that are typically
elevated in VMS systems.
Thor Prospect
Following the discovery of the main Thor target, the Company successfully pushed the total combined
strike to over 10 km of EM and geochemical targets. Venture then acquired the northern extension, so
that Thor encompassed some 24-strike km of prospective geology which already hosts multiple VMS
Style targets.
The Company then, through the initial drilling program, confirmed the presence of VMS style
mineralisation and now has a 20 km VMS target zone at Thor (Refer Figure 7). Following on a new highresolution airborne EM survey delivered priority VMS drill targets for testing within the original Thor area
(Refer Figure 6). The second phase of drilling at the Thor Prospect intersected further massive sulfides with
Copper and Zinc mineralisation.
Thor has seen only two single drill holes targeting two of the thirteen priority VMS drill targets delineated
around the initial discovery area.
Odin Prospect
Initially was a newly discovered lithium target situated ~30 km south of Greenbushes, the world’s largest
hard