Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
Wednesday, 26 July 2023
June 2023 Quarterly Activities Report
HIGHLIGHTS
Mount Lindsay Tin-Tungsten Project:
• Venture announced (ASX announcement 13 April 2023) extensive Tin-Boron Rich Zones,
with study work identifying the potential for large-scale quantities of tin and boron
throughout the greater Mount Lindsay skarn system;
• Boron is now included in the European’ Commission’s Critical Raw Material Act
and is considered vital to the green energy transition. In addition to boron’s use in
solar panels, up to 50kg of boron material is required in the construction of Electric
Vehicles.
• The Company believes the inclusion of tin-rich borates into the current
underground feasibility study could deliver major economic benefits.
• Venture is in the process of engaging hyrdometallurgical experts to commence the
next stage of metallurgical test work on the tin-rich borates.
Iron Duke, Brothers and Bandy REE Projects, Western Australia
• The Company has acquired and identified new priority Rare Earth Element
(“REE”) targets as part of its strategy to expand the company’s exposure to the
Rare Earth Element space, with a particular focus on the clay hosted REE
mineralisation type.
• Venture signed a JV agreement to earn into the Iron Duke Project located
immediately south of the recently acquired Brother REE project.
• The Iron Duke Total Rare Earth Oxides (“TREO”) results include (ASX announcement 9
May 2023):
• WRC01 49 metres (m) @ 1,313 ppm TREO from 12 m to end of hole,
including 20 m @ 1,721 ppm TREO from 20 m, or 8 m @ 2,011 ppm TREO
from 28 m.
• • WRC02 49 m @ 953 ppm TREO from 12 m to end of hole, including 20 m
@ 1,118 ppm TREO from 16 m, or 4 m @ 1,413 ppm TREO from 28 m.
Golden Grove North – SensOre Farm-in Agreement
• SensOre to earn up to 70% in all mineral rights with the exclusion of REE,
spending up to $4.5m in two stages.
• As part of the earn-in SensOre will drill the High Grade Vulcan REE target of
which Venture retains the REE rights.
• SensOre to utilise its proprietary AI technology at Golden Grove North giving
Venture exposure to the exploration upside of this advanced technology that has
already highlighted lithium and copper potential.
Corporate:
• Cash Position of $3.1 million as at 30 June 2023.
Venture Minerals Limited | ASX : VMS/VMSO
Level 2, 16 Altona Street, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
ASX: VMS
Mount Lindsay Project, Tin-Tungsten, North West Tasmania
Introduction
The Mount Lindsay Project (178 km2) is located in north-western Tasmania (Refer Figure 1) within the contact
metamorphic aureole of the highly perspective Meredith Granite. The project sits between the world class
Renison Bell Tin Mine (Metals X Ltd/Yunnan Tin Group >230kt of tin metal produced since 1968) and the
Savage River Magnetite Mine (operating for >50 years, currently producing approximately 2.5 Mtpa of
iron pellets). Mount Lindsay has excellent access to existing infrastructure including hydropower, wind
power, water, sealed roads, rail and port facilities.
Venture owns 100% of the tenure that hosts both the Mount Lindsay Tin-Tungsten Deposit and all of the
surrounding prospects. Since 2007, Venture has completed circa 100 kilometres of diamond core drilling
at Mount Lindsay and defined JORC compliant Measured, Indicated and Inferred Resources (Refer to ASX
Announcement 17 October 2012). The resource base at Mount Lindsay is hosted within two magnetite rich skarns
(Main Skarn and the No.2 Skarn) which extend over a total strike of 2.8 km and remain open at depth.
Additional indicated and inferred resources have been defined at the Reward and Stanley River South
Prospects, which extend over an additional 1.1 km of strike.
The Mount Lindsay Project (Refer Figures 1 & 2) is already classified by the Australian Government as a
Critical Minerals Project2 with an advanced Tin-Tungsten asset, which is significantly enhanced by the
recent discovery of two new skarn zones, one within the Renison Mine Sequence in the Mount Lindsay
area and the other along strike from Mount Lindsay’s main tin deposits (Refer to ASX Announcement 27 September
2021). Mount Lindsay is one of the largest undeveloped tin projects in the world, containing in excess of
80,000 tonnes of tin metal (Refer ASX announcement 17 October 2012) and within the same mineralised body a
globally significant tungsten resource containing 3,200,000 mtu (metric tonne unit)1 of WO3. The
Australian Government is supporting the Critical Minerals Sector through several initiatives including the
establishment of a A$2 billion finance facility announced in September 2021 to be administered by Export
Finance Australia which Venture is working to access for the project.
Tin is now recognised as a fundamental metal to the battery revolution and new technology. The
International Tin Association recently stated “As the awareness of tin’s importance grows, so too will the
need to secure supply. The organisation highlighted the scale of new investment required to meet the
expected surge in demand. It estimates that $1.4 billion is needed to deliver 50,000 tpa more tin by 2030”
(world tin consumption was 380,600t in 20223).
1. Generally quoted as US dollars per mtu of tungsten trioxide (WO3).
2. Refer to ‘Australian Critical Minerals Prospectus 2022’ report prepared by the Australian Government represented by the Australian
Trade and Investment Commission (Austrade) and Geoscience Australia, December 2022.
3. DATA: International Tin Association.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 2
Figure 1 | Location Map for Mount Lindsay Tin-Tungsten Deposit, Riley Iron Ore Mine &
Livingstone DSO Deposit
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 3
Activities during the June Quarter
Studies – Tin and Boron
Mount Lindsay Underground study work has identified the potential for additional, large-scale quantities
of tin and boron throughout the greater Mount Lindsay skarn system (Refer Figure 2). The tin-boron zones
are in the form of borate minerals and have not previously been assessed in any mining studies at Mount
Lindsay. The borate minerals containing a large amount of Boron, a critical mineral in the solar panel
industry, not only occur in the current Mount Lindsay resources (Refer Figure 2), but also occur extensively
throughout the numerous skarns surrounding the Company’s current tin-tungsten deposits which are
closely analogous to well-known large skarn deposits in Russia and China, that contain the same borates.
The outcomes to date on the bulk metallurgical testwork to investigate cost effective magnetic and gravity
focused processing flowsheets has identified the potential to recover tin that sits within tin-iron borates
that make up a significant portion of the Mount Lindsay mineral resource (Refer to ASX announcement 17 October
2012). The previously completed (2012) Mount Lindsay Open-Pit Study had a processing flowsheet that
could only recover the tin that occurs in cassiterite therefore limiting the revenue generated by tin.
The next stage of the metallurgical testwork will continue investigating the extraction of tin, boron and iron
from tin-iron borates, potentially significantly increasing the tin recovery and producing a valuable boron
by-product resulting in another revenue stream to the Mount Lindsay project. These tin, boron and iron
products are successfully recovered from large scale mines in China and Russia. Venture believes the
inclusion of tin-rich borates into the current underground feasibility studies could deliver a major economic
benefit to the study, through the recovery of boron and additional tin and iron. Venture had previously
engaged CSIRO to do the first stage of metallurgical recovery work on the tin-rich borates and is now in
the process of engaging hyrdometallurgical experts to commence the next stage of metallurgical test
work.
Boron (Borates) is on the European Commission’s list of minerals to feed the green energy transition in
the recently released Critical Raw Materials Act (CRMA) and is also on Japan’s Critical Minerals list1, and
importantly is not produced in Australia. Over 80% of the World’s Boron is produced by two companies
Rio Tinto (Boron Mining Operations in California, USA since 1927) and Eti Maden AS (State owned
Enterprise of Turkey) which produce over 50%.
Boron is a rare light metal which is an important industrial mineral that is only produced in a few locations
globally but plays an important role in the modern world. It is one of the most versatile elements in the
world, used in everything from computer screens to fertilisers to creating powerful magnets for wind
turbines and electric vehicles (EV). Boron is sometimes referred to as the 5th element of decarbonisation.
Exploration
Late in the March Quarter, Venture completed drill testing (SR001 to a depth of 443 metres) a new Nickel
Target defined by a three kilometre long EM conductor supported at the surface by nickel in soil anomalism
and interpreted to be within the Wilson River Ultramafics. Venture has 100% ownership of granted tenure
encompassing 13 kilometres of this prospective ultramafic unit (Refer to ASX announcement 15 February 2023). As
of the end of the quarter, assays were pending.
1.
https://www.csis.org/analysis/geopolitics-critical-minerals-supply-chains
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 4
Figure 2 | Mount Lindsay Project: Geology Map showing High Grade Tin-Tungsten Targets and Tin-Boron Skarns
*See Metals X Announcement “2022 Renison Mineral Resource Update”, 14 June 2022.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 5
Iron Duke, Bandy & Brothers REE Projects, Western Australia
During the quarter, Venture acquired and identified new priority REE targets as part of its strategy to
expand the company’s exposure to the Rare Earth Element space, with a particular focus on the clay
hosted REE mineralisation type.
Acquisitions (through the tenement application process) include a 100% owned 511 km2 tenement
package less than 10kms away from the Very High Grade REE target recently discovered at the Vulcan
prospect within the Golden Grove North project, with results including several values over 1% TREO1
ranging up to 12.5% TREO with 5,460 ppm (0.55%) Pr6O11 and 14,575 ppm (1.46%) Nd2O3 (Refer Figures
to 3 & 12 and to ASX announcement 11 November 2022).This new REE project is named “Brothers” and is highlighted
by a high grade 7 element (Ce, Eu, La, Sm, Tm, Y & Yb) REE laterite soil result of 1,864 ppm combined
REE (the third highest result from the Laterite Geochemical Database for the Western Yilgarn Craton of
Western Australia2) amongst other higher values and is located close to a historic government co-funded,
through the Western Australian Exploration Incentive Scheme (“EIS”), RC drill hole that intersected 4
meters @ 2,103 ppm TREO3 within clays) (Refer to Figure 4).
The Company has also acquired a 100% owned 809 km2 tenement package and has named this new
REE project “Bandy”, which is highlighted by a high grade 7 element (Ce, Eu, La, Sm, Tm, Y & Yb) REE
laterite soil anomaly of 2,704 ppm (from the Laterite Geochemical Database for the Western Yilgarn
Craton of Western Australia2) amongst other higher values (Refer to Figure 5), this high grade combined
REE result is the highest combined REE value returned from that complete surface sampling program.
Later in the quarter, Venture signed a JV agreement to earn into a REE project (known as the Iron Duke
Project), which hosts two shallow historic drillholes, both of which have broad, high grade intersections of
TREO. Iron Duke is located immediately south of the recently acquired Brothers REE project and contains
numerous high priority REE targets for immediate drill testing (Refer to Figures 3 & 4, and ASX announcement 18
April 2023). With only two historic RC drill holes at Iron Duke, both of which intersected broad, high grade
zones of REE, the Project is very well positioned for a new REE discovery.
The Iron Duke TREO results include (Refer to ASX announcement 9 May 2023 for full details):
•
WRC01 49 metres (m) @ 1,313 ppm TREO from 12 m to end of hole, including
20 m @ 1,721 ppm TREO from 20 m, or
8 m @ 2,011 ppm TREO from 28 m.
•
WRC02 49 m @ 953 ppm TREO from 12 m to end of hole, including
20 m @ 1,118 ppm TREO from 16 m, or
4 m @ 1,413 ppm TREO from 28 m.
The Company also pegged an additional 429 km2 tenement package adjacent to both the Brothers and
Iron Duke Projects, bringing the total project area up to 1,091 km2 of prospective REE tenure (Refer to
Figures 3 & 4).
1. TREO represents the sum of 14 Rare Earth Elements excluding Promethium plus Yttrium expressed as oxides.
2. Geological Survey of Western Australia Record 2007/9- Laterite Geochemical Database for the Western Yilgarn Craton of
Western Australia by M. Cornelius, I. D. M. Robertson, A. J. Cornelius and P. A. Morris.
3. https://geodocs.dmirs.wa.gov.au/Web/documentlist/10/Report_Ref/A123326
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 6
Activities during the June Quarter
During the quarter, Venture signed a contract with a drilling company to begin a maiden drilling program
to test the extent of the clay hosted REE mineralisation at Iron Duke and to testing numerous high priority,
clay hosted, REE targets at the recently acquired Brothers and Bandy Projects.
The aircore drilling program was completed during the quarter, with 40 holes for 2,397 metres at Brothers
(including Iron Duke), and 17 holes for 456 metres at Bandy. As of the end of the quarter, assays were
pending.
Figure 3 | Location Map of Venture’s REE Projects and Targets in Western Australia
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 7
Figure 4 | Brothers and Iron Duke Projects: Geology Map showing REE laterite geochemical sample
results, RC drill hole REE results and upcoming AC drilling areas.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 8
Figure 5 | Bandy Project: Geology Map showing REE laterite geochemical sample results and
upcoming AC drilling areas.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 9
South West Project, Nickel-Copper-PGE, Western Australia (Chalice Earn-in at 51%)
Introduction
The South West Project contains the Thor and Odin Prospects within its tenement package (256 km²)
and is located ~240 km south of Perth, hosted within the Balingup Gneiss Complex. A joint venture
between Teck Cominco and BHP Billiton, first identified this area as being prospective for base and
precious metals hosted within the complex. The joint venture completed surface sampling and airborne
EM surveys which culminated in the discovery of a base and precious metals deposit (Kingsley Prospect)
which Teck identified as a meta-Volcanic Massive Sulfide (“VMS”) system in high grade metamorphic
rocks. Venture’s nearby Thor prospect hosts a strong and coherent arsenic in laterite anomaly, with
locally elevated levels of copper, zinc, tin, bismuth, tungsten and antimony, elements that are typically
elevated in VMS systems.
Thor Prospect
Following the discovery of the main Thor target, the Company successfully pushed the total combined
strike to over 10 km of EM and geochemical targets. Venture then acquired the northern extension, so
that Thor encompassed some 24-strike km of prospective geology which already hosts multiple VMS
Style targets.
The Company then, through the initial drilling program, confirmed the presence of VMS style
mineralisation and now has a 20 km VMS target zone at Thor (Refer Figure 6). Following on a new highresolution airborne EM survey delivered priority VMS drill targets for testing within the original Thor area
(Refer Figure 7). The second phase of drilling at the Thor Prospect intersected further massive sulfides with
Copper and Zinc mineralisation.
Thor has seen only two single drill holes targeting two of the thirteen priority VMS drill targets delineated
around the initial discovery area.
Odin Prospect
Initially was a newly discovered lithium target situated ~30 km south of Greenbushes, the world’s largest
hard rock lithium mine (produces ≈40% of the world’s lithium and is owned 51% by Tianqi Lithium and
49% Albemarle). Odin was discovered following a detailed geological mapping and surface geochemical
program, which identified a potentially lithium bearing pegmatite system.
Following two phases of surface exploration a lithium target was identified which extended over 1.9 km
of strike and was up to 150m wide. The geochemistry in the laterite is analogous to Greenbushes with
significantly elevated levels of tin, tantalum and niobium.
The first hole (ODD01) targeting potential lithium bearing pegmatites intersected disseminated NickelCopper sulfides within a mafic-ultramafic host unit, therefore realising the Company a new Nickel-Copper
Target (Refer Figure 8). The nickel-copper target was identified by ODD01 intersecting a continuous 21
metre zone of minor disseminated Nickel-Copper sulfides hosted within a mafic-ultramafic gneiss.
Venture’s surface sampling showed significant nickel and copper geochemical anomalies within the
mafic-ultramafic target units to the south-west and south-east of the first hole.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 10
Chalice Earn-in (Thor and Odin Prospects)
In July 2020 Chalice executed an option and earn-in agreement on the South West Project owned by
Venture, as the project included a ‘Julimar lookalike’ Ni-Cu-PGE target: a ~20km long interpreted maficultramafic complex with a strong magnetic signature and massive sulfide occurrence (the Thor Target)
(Refer Figure 10). Chalice, as operator, may earn up to 70% by spending $3.7 million on exploration over 4
years.
Chalice completed a ground EM program, Auger Soil Geochemistry program and Maiden Drilling
Program on the prospective 20 km long Thor magnetic trend and met the expenditure requirement of
$1.2 million within two years of signing the agreement to earn 51%. Chalice can earn a further 19%
interest (for a total of 70%) through an additional $2.5 million of expenditure by July 2024. Once the
second stage of the earn-in is completed Venture can then elect to either contribute 30% or dilute to a
minimum of 10% JV interest, in which case the interest automatically reverts to a 1.25% NSR royalty.
After recently identifying two new Ni-Cu-PGE targets, Chalice committed to the second stage of the JV.
South West Project Highlights:
• Thor has a 20km long ‘Julimar lookalike’ magnetic anomaly associated with chromium rich rocks
indicative of mafic-ultramafic intrusions;
• An airborne EM survey in 2018, identified 13 targets in the southern 6.5 km of the Thor magnetic
anomaly, the northern half of the survey was heavily disrupted by electrical infrastructure;
• Maiden Drill Program at Thor intersected 2.4m of Massive Sulfide in TOR05 averaging 0.5% Cu,
0.05% Ni, 0.04% Co and anomalous Au & Pd (Refer to ASX Announcement 21 February 2019);
• Maiden Drill Hole at Odin intersecting Ni and Cu sulfides within a highly prospective maficultramafic unit that extends over 10 strike kilometres (Refer to ASX Announcement 11 May 2018).
Exploration
In the March Quarter, Chalice received results from the completed Phase 2 Auger Soil Geochemistry
program (Refer Figures 6 to 8) and has identified another two new Ni-Cu-PGE targets as well as extending
and better defining the previously identified new Ni-Cu-PGE targets at the South West Project.
One of the new targets sits on the previously untested northern part of the Thor Target, whilst the other
new target sits in the eastern part of the South West Project, close to the Odin Ni-Cu-PGE prospect. The
two new targets have been infilled sampled with further Auger Soil Geochemistry.
The previously identified Ni-Cu-PGE targets from the Phase 1 soil program, are interpreted to be hosted
in ultramafic rocks and contain coincident and untested AEM and magnetic anomalies. These targets had
no plate conductors resolved from the recently completed Fixed Loop EM (“FLEM”) ground survey but
have been extended and better defined by the Phase 2 soil program (Refer to ASX Announcement 24 March 2023).
The South West Project is hosted in the Balingup Metamorphic Belt, within the highly prospective West
Yilgarn Ni-Cu-PGE Province discovered by Chalice that hosts their Julimar discovery, and which is one
of the largest greenfield Ni-Cu-PGE sulfide discoveries in recent history (Refer Figure 9). The two main
prospects within the Project are Thor and Odin which remain prospective for potential Ni-Cu-PGE
mineralisation.
Activities during the June Quarter
There were no on ground activities during the quarter. Work continued on getting statutory approvals to
enable potential follow up exploration work in the near future.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 11
Figure 6| South West Project - Chalice’s Auger Surface Geochemistry Phase One and Two results on
aeromagnetics over the Thor Target
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 12
Figure 7 | South West Project - Chalice’s Auger Surface Geochemistry Phase One and Two results
on airborne EM over the Thor Target
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 13
Figure 8 | South West Project - Chalice’s Auger Surface Geochemistry Phase Two results on
aeromagnetics over the Odin Ni-Cu-PGE Prospect
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 14
Figure 9 | Chalice’s Julimar and Venture’s South West JV Project locations over regional geology
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 15
Figure 10 | Comparison of Chalice’s Julimar and Venture’s South West Projects magnetic signatures
and EM anomalies at same scale
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 16
Golden Grove North Project, - Lithium & Zinc-Copper-Gold, Western Australia
(SensOre earning in)
Introduction
Venture has acquired a highly prospective land package (288 km2) less than 10 kilometres north of the
Golden Grove Camp (Mine) (Refer Figure 11), currently Western Australia’s premier location for VMS
deposits. In 2002, Golden Grove had an endowment (resources and production) of 40.2Mt @ 1.8% Cu,
0.9% Pb, 7.6% Zn, 103 g/t Ag & 0.8 g/t Au1 (Refer Figure 11), and in early 2017 EMR Capital purchased the
Mine for $US210M.
The Golden Grove North project (approx. 370 km north-northeast of Perth) has not been the focus of
VMS exploration for the last 25 years and it is the Company’s goal to use a systematic exploration
approach, utilising the latest techniques to explore for VMS style mineralisation.
There are already several compelling target areas throughout the project, including a number of historic
shallow gold drill intersections including 10 metres @ 1.4g/t gold from 16m; 8 metres @ 2.1g/t gold from
6m; 6 metres @ 2.3g/t gold from 6m; 3 metres @ 3.6g/t gold from 95 m; and several strong gold and
copper surface rock chip sampling results, including 9.4g/t gold, 7.4g/t gold and 6.6% copper; 6.2g/t gold,
5.7g/t gold, 4.0 g/t gold, 3.8g/t gold and 0.1% lead; 7.6% copper and 27g/t silver; 8.0% copper and 2.0%
copper; and an extensive land position of interpreted lithologies prospective for VMS style mineralisation
for over 25 strike kilometres that remain, due to cover, largely untested (Refer ASX Announcement 30 October
2018).
Highlights at the Golden Grove North Project include:
•
•
•
•
•
288 km2 located less than 10 kilometres from the Golden Grove Mine;
25 strike kilometres of a largely untested, prospective geological sequence for VMS style
mineralisation with early exploration success yielding the Vulcan and Neptune (Refer Figure
13) VMS targets;
EM surveys at Vulcan have discovered four high priority VMS drill targets at and around
the Copper-Gold Prospect along strike to the Golden Grove Zinc-Copper-Gold Mine (Refer
to ASX Announcement 6 August 2020);
Historic shallow gold drill intersections including 10 metres @ 1.4g/t gold from 16m, 8 metres @
2.1g/t gold from 6m, 6 metres @2.3g/t gold from 6 metres and 3 metres @ 3.6g/t gold from 95
metres (Refer to ASX Announcement 30 October 2018);
Historic surface rock chip sampling has returned assays including 9.4g/t gold, 7.4g/t gold &
6.6% copper, 6.2g/t gold, 5.7g/t gold, 4.0 g/t gold, 3.8g/t gold & 3.1% lead, 7.6% copper &
0.1% zinc, 8.0% copper, 2.0% copper, 1.8% copper & 3g/t silver (Refer to ASX Announcement 30
October 2018).
1.
Department of Mines and Petroleum Report 165, VMS Mineralization in the Yilgarn Craton, Western Australia: A review of known deposits and prospectivity
analysis of felsic volcanic rocks by SP Hollis, CJ Yeats, S Wyche, SJ Barnes and TJ Ivanic 2017.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 17
Activities during the June Quarter
During the quarter, Venture entered into a farm-in agreement on the Golden Grove North Project with
SensOre Ltd (ASX: S3N) and its subsidiary Exploration Ventures AI Pty Ltd a collaboration with
Deutsche Rohstoff AG. SensOre is to spend up to $4.5m to earn a 70% interest, with Venture to
retain the REE mineral rights and an option to claw back up to 10% under the terms of the Farm-in
Agreement (“Agreement”).
SensOre has committed to drill testing in the first 12 months a minimum of 300 metres on the Vulcan
High Grade REE drill target following the recent results announced regarding the very high grade REE
surface mineralisation at the Vulcan prospect within the Golden Grove North project. Results included
several values over 1% TREO ranging up to 12.5% TREO with 5,460 ppm (0.55%) Praseodymium
Oxide (Pr6O11) and 14,575 ppm (1.46%) Neodymium Oxide (Nd2O3).
The new REE target is supported by historic soil sampling originally focused on VMS style
mineralisation that was also assayed for two REEs being La and Ce. Recently completed soil sampling
in which the TREE suite was analysed (all 14 Rare Earth elements excluding Promethium plus
Yttrium), confirmed and defined the discovery. In addition, Venture’s previously drilled diamond core
hole VUDD001 targeting VMS style mineralisation adjacent to the new REE target intersected
anomalous La and Ce, but the hole was not drilled deep enough to test this new target (Refer to Figure
12 and ASX announcement 11 November 2022).
Since the signing of the Agreement, SensOre have initiated early, first pass field-activities at Golden
Grove North. Results were pending at the end of the quarter.
Key Terms of the SensOre Earn-in Agreement on the Golden Grove North Project:
1.
SensOre may earn a 51% beneficial interest in the Mineral Rights in the JV Area by sole
funding the first $1.5m of Farm-in Expenditure (which includes the Minimum Expenditure
and any liability under the Permitted Encumbrances) within the first 2 years of the Farm-in
Period on the JV Area,
A. Expenditure includes a minimum of 300 m RC or diamond core drilling to test the
Vulcan REE target (Vulcan Drilling) which must be completed within the first 12
months of the 2 year period, provided that the parties, acting reasonably, may
agree that the target has been tested by drilling less than 300m if the results support
that assessment.
B. The 12 month period to complete the Vulcan Drilling is subject to obtaining all
necessary land access and approvals under the Mining Law. In the case of any delay
in receiving land access and approvals, all parties, acting reasonably, wi
Share your feedback
Discover