JUPITER DELIVERS FIRST 160 MT INDICATED MINERAL
RESOURCE
Infill drilling across approximately 10% of the Jupiter Resource area has
established an Indicated Mineral Resource representing approximately 10% of the
total Resource tonnage. The independent Mineral Resource Estimate by SRK
Consulting delineates 160 million tonnes at 1,700 ppm TREO in the Indicated
category at a 1,000 ppm TREO lower cut-off.
Million
Tonnes
TREO
ppm
MREO
ppm
Pr6O11
ppm
Nd2O3
ppm
Tb4O7
ppm
Dy2O3
ppm
Y2O3
ppm
Sc2O3
ppm
Ga2O3
ppm
Indicated Mineral Resource
160 1,700 420 84 310 4 18 89 45 40
Inferred Mineral Resource
1,500 1,700 380 82 280 3 14 72 36 40
Notes: Mineral Resources are reported at a 1,000 ppm TREO lower cut-off grade. Tonnages and grades are rounded and totals may not sum
precisely due to rounding. TREO means Total Rare Earth Oxides. MREO means Magnet Rare Earth Oxides, comprising Pr₆O₁₁, Nd₂O₃, Tb₄O₇
and Dy₂O₃. No Ore Reserve has been declared.
Jupiter Highlights
• First Indicated Mineral Resource of 160 Mt at 1,700 ppm TREO within the
updated 1.7 Bt at 1,700 ppm TREO Jupiter MRE, at a 1,000 ppm TREO lower
cut-off.
• Approximately 10% of the Jupiter Resource tonnage is now Indicated,
following infill drilling across approximately 10% of the Resource area.
• Increased confidence in geological and grade continuity within the infill-drilled
area supports the Indicated classification.
• Magnet rare earth oxides (MREO), comprising neodymium, praseodymium,
dysprosium and terbium oxides, represent approximately 25% of TREO within
the Indicated Mineral Resource.
• Independent MRE prepared by SRK Consulting, incorporating drilling
completed to March 2026.
• Jupiter Scoping Study progressing, to be released shortly.
2
Critica Limited (ASX: CRI) (“Critica” or “the Company”) is pleased to announce an updated Mineral
Resource Estimate (“MRE”) for the Jupiter Rare Earths Project, located within the Company’s 100%-
owned Brothers Project in Western Australia.
The updated MRE incorporates the results of infill drilling on a 125 m x 125 m grid across approximately
10% of the Jupiter Resource area, targeting a portion of the maiden Inferred Mineral Resource announced
to the ASX on 11 February 2025. At a 1,000 ppm TREO lower cut-off, the program has established an
Indicated Mineral Resource of 160 Mt at 1,700 ppm TREO, representing approximately 10% of the total
Jupiter Resource tonnage.
Critica’s CEO Jacob Deysel commented:
“The delivery of Jupiter’s first Indicated Mineral Resource is an important milestone for the Project and
demonstrates the effectiveness of the targeted infill drilling completed over the past year.
The results provide increased confidence in the geological and grade continuity of the infill-drilled area,
while the vast majority of the Jupiter Resource remains classified as Inferred. This gives us confidence in
our approach to progressively increasing Resource confidence across Jupiter.
Importantly, the Indicated Resource also contains a strong contribution from the key magnet rare earths
neodymium, praseodymium, dysprosium and terbium, which together represent approximately 25% of
TREO.
The Jupiter Scoping Study is progressing and will be released shortly.”
Updated Mineral Resource Estimate
The following provides a summary of the material information relating to the updated Jupiter Mineral
Resource Estimate, consistent with the requirements of ASX Listing Rule 5.8.1. Further information is
provided in JORC Code Table 1, included as Appendix A to this announcement.
The updated Jupiter Mineral Resource Estimate (“MRE”) was prepared independently by SRK Consulting
following infill drilling on a 125 m x 125 m grid across approximately 3.3 km² of the 42 km² Jupiter
Resource footprint. The infill drilling was designed to provide increased confidence in geological and
grade continuity and support the establishment of a maiden Indicated Mineral Resource at Jupiter.
The updated MRE incorporates drilling completed to March 2026, with a data cut-off of 6 July 2026.
At a 1,000 ppm TREO lower cut-off, the updated MRE comprises 160 Mt at 1,700 ppm TREO of Indicated
Mineral Resources and 1.5 Bt at 1,700 ppm TREO of Inferred Mineral Resources, for a total Jupiter Mineral
Resource of 1.7 Bt at 1,700 ppm TREO.
The Indicated Resource represents approximately 10% of the total Jupiter Resource tonnage at the 1,000
ppm TREO lower cut-off, following infill drilling across approximately 10% of the Resource footprint.
The Jupiter MRE is presented across a range of TREO lower cut-off grades in Table 1.
The 1,000 ppm TREO lower cut-off selected for headline reporting reflects consideration of the shallow
and consistent nature of the mineralisation, preliminary metallurgical test work and benchmarking
against comparable clay-hosted rare earth projects at similar stages of development. The selected cut-
off is considered conservative relative to those used for most peer projects.
3
Table 1 | Jupiter Mineral Resource Estimate at selected TREO lower cut-off grades
Cut-off
TREO
Million
Tonnes
TREO
ppm
MREO
ppm
Pr6O11
ppm
Nd2O3
ppm
Tb4O7
ppm
Dy2O3
ppm
Y2O3
ppm
Sc2O3
ppm
Ga2O3
ppm
Fe
%
Indicated Resources
400 220 1,400 350 71 260 3 15 75 40 39 9.7
800 180 1,600 400 80 290 4 17 86 44 39 10
1,000 160 1,700 420 84 310 4 18 89 45 40 11
1,200 150 1,700 420 86 320 4 18 90 46 41 11
1,500 100 1,900 460 94 340 4 19 94 49 42 11
1,800 50 2,100 520 110 390 4 20 99 53 43 12
2,000 28 2,300 560 120 420 5 22 104 56 44 12
Inferred Resources
400 2,500 1,300 290 62 210 2 11 55 30 38 6.9
800 1,700 1,600 360 77 270 3 13 69 35 39 7.3
1,000 1,500 1,700 380 82 280 3 14 72 36 40 7.5
1,200 1,400 1,700 400 85 290 3 14 74 37 40 7.7
1,500 900 1,900 440 94 330 3 16 80 39 41 7.9
1,800 460 2,200 500 110 370 4 17 87 40 42 7.8
2,000 270 2,400 540 120 400 4 18 93 40 42 7.8
Notes: Mineral Resources are reported at a range of TREO cut-off grades and rounded to two significant figures in accordance with the JORC
Code (2012 Edition). Totals may not sum precisely due to rounding. TREO means Total Rare Earth Oxides. MREO means Magnet Rare Earth
Oxides and comprises Pr₆O₁₁, Nd₂O₃, Tb₄O₇ and Dy₂O₃. Gallium and scandium are excluded from TREO and reported separately. No Ore
Reserve has been declared.
Mineral Resource Classification
Infill drilling was completed on a 125 m x 125 m grid across approximately 3.3 km², or 10% of the Jupiter
Resource area. The closer-spaced drilling has increased confidence in the geological interpretation and
grade continuity within the infill-drilled area and supports classification of this portion of the Resource as
Indicated Mineral Resources.
At the 1,000 ppm TREO lower cut-off, approximately 10% of the total Jupiter Resource tonnage is now
classified as Indicated. The balance of the Resource remains classified as Inferred, reflecting the broader
drill spacing outside the infill-drilled area.
SRK’s classification considered the geological interpretation, quantity and quality of the available drilling
and sampling data, grade continuity and the performance of the resource estimation. The closer-spaced
drilling demonstrated sufficient geological and grade continuity to support Indicated classification within
the infill area, while the broader 250 m x 250 m drilling continues to support an Inferred classification
across the remainder of the Resource.
Comparison with Previous Mineral Resource Estimate
The updated MRE reported in this announcement supersedes the maiden Jupiter MRE announced on 11
February 2025.
The principal objective of the 2026 infill drilling program and MRE update was to establish Indicated
Mineral Resources and increase confidence in the Jupiter Resource.
At the same 1,000 ppm TREO lower cut-off, the February 2025 MRE comprised 1.8 Bt at 1,700 ppm TREO,
entirely classified as Inferred. The updated MRE comprises 160 Mt at 1,700 ppm TREO Indicated and 1.5
Bt at 1,700 ppm TREO Inferred, for a total of 1.7 Bt at 1,700 ppm TREO.
4
The key outcome of the update is the establishment of a substantial Indicated Mineral Resource within
the infill-drilled area, reflecting increased confidence in geological and grade continuity.
Table 2 | Comparison of February 2025 and updated Jupiter Mineral Resource Estimates at 1,000 ppm
TREO cut-off grade
MRE
Classification
Cut-off grade
(TREO)
MRE - 2025 MRE - 2026
Tonnes TREO (ppm) Tonnes TREO (ppm)
Indicated 1,000 ppm - - 160 Mt 1,700
Inferred 1,000 ppm 1.8 Bt 1,700 1.5 Bt 1,700
Total 1,000 ppm 1.8 Bt 1,700* 1.7 Bt 1,700
Notes: The February 2025 and updated Mineral Resource Estimates are compared at the same 1,000 ppm TREO lower cut-off grade.
Tonnages and grades are rounded and totals may not sum precisely due to rounding. TREO means Total Rare Earth Oxides.
*The February 2025 MRE was entirely Inferred.
Project Location and Accessible Infrastructure
Discovered in late 2023, the Jupiter clay-hosted REE deposit forms part of Critica’s 100%-owned Brothers
Project, which currently covers approximately 1,700 km² of semi-contiguous granted Exploration
Licences, located approximately 550 km northeast of Perth and 60 km west of Mount Magnet in Western
Australia.
Jupiter is located less than 10 km from the sealed Geraldton–Mount Magnet Road, providing access
towards Geraldton and its established port and regional infrastructure. The Mid-West gas pipeline runs
parallel to the Geraldton–Mount Magnet Road, while electricity transmission infrastructure is located
approximately 40 km southwest of Jupiter.
Access from the Geraldton–Mount Magnet Road to the Project is currently via unsealed pastoral station
tracks. The Jupiter area is characterised by relatively flat, sparsely vegetated terrain.
5
Figure 1 | Jupiter Project Location and Regional Infrastructure
Tenure and Ownership
The Brothers REE Project comprises granted Exploration Licences E59/2421, E59/2463, E59/2710,
E59/2711, E59/2819, E59/2821, E59/2827, E59/2889, E59/2890, E59/2907, E59/2927, E59/2928,
E59/2930, E59/2977 and E58/629, held 100% by Tasmanian Rare Earth Pty Ltd, a wholly owned subsidiary
of Critica Limited. The Jupiter deposit is located entirely within E59/2463.
Any future development of Jupiter will require the relevant mining tenure and environmental, heritage,
mining and other statutory approvals.
Project History
The Brothers Project area was initially identified by Critica as having clay-hosted REE mineralisation
potential through a review of publicly available geological and exploration data. The Jupiter target was
specifically highlighted by coincident aeromagnetic and gravity anomalies, together with anomalous REE
results from two co-funded WA DMPE EIS drill holes.
Reconnaissance Air Core (“AC”) drilling of the Jupiter target along existing pastoral tracks was completed
in June 2023, with every drill hole reporting significant rare earth mineralisation within clay and saprolite
zones. Discovery of the Jupiter clay-hosted REE deposit was announced to the ASX in November 2023.
Following the discovery, Critica conducted geophysical surveys and several drilling campaigns to
delineate an approximately 42 km² area of clay-hosted rare earth mineralisation, with broad zones of up
to approximately 80 m thickness grading above 1,000 ppm TREO.
6
Two resource definition programs comprising 508 AC holes for 29,772 metres were completed in 2024,
drilling most of the Jupiter target on a 500 m x 250 m spacing and selected higher-grade zones on a 250 m
x 250 m spacing. Seven diamond holes totaling 819 metres were also completed to provide geological
confidence and determine material densities for resource estimation.
A maiden Inferred Mineral Resource of 1.8 Bt at 1,700 ppm TREO at a 1,000 ppm TREO lower cut-off was
estimated by SRK Consulting and announced to the ASX on 11 February 2025.
Critica subsequently progressed metallurgical testwork at laboratories including ANSTO, IMO and
GAVAQ. A base-case flowsheet involving magnetic separation and flotation followed by acid baking and
REE precipitation has been developed through bulk bench-scale testwork and piloting programs, with
optimisation work continuing.
In 2026, a selected area of the Jupiter Resource was infill drilled on a 125 m x 125 m grid to increase
Resource confidence and support the updated MRE.
Geological Setting and Interpretation
The Jupiter deposit is located within the Archaean Murchison Domain of the Youanmi Terrane, Yilgarn
Craton. The Murchison Domain comprises narrow belts of supracrustal greenstones, some large layered
mafic–ultramafic intrusive complexes (Meeline and Boodanoo suites) and voluminous granitic rocks
emplaced between c. 2.7 Ga and 2.6 Ga. The granitic rocks are divided into the Cullculli Suite (tonalite-
trondhjemite-granodiorite), Big Bell Suite (tonalite-monzogranite), Tuckanarra Suite (granodiorite-
monzogranite), Jungar (potassium feldspar porphyritic monzogranites) and the Bald Rock Supersuite
(monzogranite and fluorite bearing alkaline granite).
The Archaean basement in the Jupiter area is deeply weathered and extensively overlain by Cenozoic
alluvial and colluvial sand and gravel such that the Jupiter clay-hosted REE deposit is entirely concealed
beneath a thin layer of transported cover. Regolith thickness ranges from a few metres to c.100 m
thickness and is extensively mineralised at the >1,000 ppm TREO level. Three main regolith zones are
recognised, namely Cover (SAND), in situ-clay (RCLY) and saprolite (RSAP) as summarised for drill hole
JPD001 below. Bottom-of-hole AC and deeper (basement penetrating) RC and diamond core drilling
shows that the Jupiter clay-hosted REE deposit is underlain by a previously unrecognised alkaline igneous
intrusive complex comprising a composite of syenite, alkali gabbro, monzodiorite and monzonite bodies.
7
Table 3 | Jupiter Regolith Profile Description. Example regolith profile from JPD001.
8
Figure 2 | Lithologies of the Jupiter Alkaline Intrusive Complex (HQ diameter diamond drill core).
Mineralogy and Mineralisation Type Characterisation
The Jupiter clay-hosted REE resource is hosted by the in-situ clay (RCLY) and saprolite (RSAP) zones,
ranging from a few metres to c. 80 m thickness and commonly extending from the base of the cover
(RSAND) to fresh basement. Microanalytical work shows the REEs are mainly hosted hydrated
phosphates comprising rhabdophane-monazite, churchite-xenotime and florencite-gorceixite-goyazite
group minerals. The highest REE grades are typically within the lower RCLY and upper RSAP zones.
Gangue mineralogy is dominated by kaolinite, quartz and iron (hydr)oxides with minor Ti-oxides, barite
and relict zircon in the clay zone (RCLY), grading downwards through clay saprolite (RSAP) with increasing
relict feldspar, amphibole, biotite, chlorite, epidote, apatite, titanite, magnetite and pyroxene to saprock
and fresh basement.
Four broad mineralisation types are currently defined for metallurgical characterisation based on
geochemistry, gangue mineralogy and textural data. Detailed mineralogical analyses identified three
dominant REE mineral phases that account for the majority of the REE metal inventory within the Jupiter
deposit. As a result, variability in processing behaviours is expected to be driven primarily by differences
in gangue mineralogy rather than REE mineralogy.
9
Figure 3 | Classified TIMA images of Jupiter REE mineralisation and ore-types
Principal Components Analysis (PCA) using the major elements (Al, Ca, Fe, K, Na and Si) demonstrates
clear separation between clay-dominated (RCLY) and mixed clay + relict protolith mineral domains
(RSAP) such that gangue mineralogy can be largely predicted from PCA analysis. High Al is associated
with increasing kaolinite content, Fe is associated with magnetite, hematite and goethite dominated
gangue, Si with quartz, K with alkali feldspar and/or biotite, Na with feldspars; and Ca with pyroxene,
amphibole and/or epidote. Transported cover, which typically has <300 ppm TREO, forms a distinct
population from the in-situ regolith domains.
Three-dimensional modelling of the mineralisation types demonstrates spatial continuity over distances
ranging hundreds of metres to several kilometres and broadly reflects the zonation of the underlying
Jupiter alkali intrusive complex.
Four natural mineralogical populations are identified by the major element PCA analysis and form the
basis of the Jupiter mineralisation types used to inform Critica’s metallurgical test work and provide a
framework for understanding and predicting processing behaviours across the deposit. Consequently,
metallurgical test work results can be more confidently extrapolated across the resource, improving the
reliability of process design and mine planning studies.
10
Figure 4 | Principal Component Analysis: PC1 (39.0%) vs. PC2 (35.3%)
Jupiter Ore-type Classification
Drilling Techniques and Hole Spacing
A total of 770 holes for 45,937 m of AC, RC and diamond core drilling was used in the resource update
reported here, including 145 AC holes for 7,274 m drilled on a 125 x 125 m grid spacing in the Indicated
Resource area. Diamond core holes were drilled to provide lithology density data, detailed geological
understanding, and validate grades obtained by other forms of drilling. These holes were not drilled on a
regular spacing. All holes except the diamond holes were drilled vertically. The mineralisation forms a flat-
lying blanket over an undulating basement such that down-hole thickness represents the true thickness
of the mineralisation.
Table 4 | Jupiter resource definition drilling summary
Drill Program Holes Metres
Jupiter AC: Exploration 33 2,026
Jupiter RC: Exploration 77 5,046
Jupiter AC: 2024 Resource Definition 508 29,772
Jupiter DD: 2024 Resource Definition 7 819.4
Jupiter AC: 2026 Resource Definition 145 7,274
Total 770 45,937.4
Sampling and Sample Analysis
AC and RC samples were collected directly from the rig cyclone at one metre intervals and placed into
plastic bags at the drill site. The locally sticky nature of the clays and blade drilling method with
consequent variability in fragment size precluded the effective use of a cone or splitting for sampling.
Samples were homogenised in the bulk bags then subsampled by scoop from each 1 m interval to
prepare volumetrically consistent composites that typically comprised four metre intervals (range 2 to 6
metres) weighing 2 kg to 3 kg. Duplicate samples were collected in sequence with the primary samples to
monitor sampling consistency and ensure that the sampling method was suitable for this style of
11
mineralisation. Duplicate performance is considered excellent reflecting the fine-grained clay-dominated
nature of the mineralisation.
Diamond core drilling comprised of PQ3 and HQ3 drill core, with HQ and NQ tails into fresh rock. Triple
tube core was wrapped on site to preserve the drill core for density measurements. Core was transported
from site to Perth where it was processed. Drill core was cut in half and one side of the drill core
quartered. Quarter core sample intervals ranged from 0.3 m to 5.7 m and were sampled in lithologically
coherent intervals.
Samples were dispatched to ALS (Canningvale and Wangara, WA) for geochemical testing. Samples
weighing 2-3 kg, were processed using conventional sample preparation procedures, comprising oven-
drying, crushing and then pulverising to a split of P95 passing 75 µm.
All samples were assayed for a 34 element suite (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Co, Cr, Cu, Fe, Ga, K, La,
Li, Mg, Mn, Mo, Na, Ni, P, Pb, S, Sb, Sc, Sr, Th, Ti, Tl, U, V, W and Zn) using a four acid digest (nitric +
perchloric + hydrofluoric with hydrochloric wash) with an Inductively Coupled Plasma – Atomic Emission
Spectroscopy (ICP-AES) finish (ALS method ME-ICP61). Samples exceeding La > 100 ppm by ME-ICP61
were also assayed by a lithium borate fusion of pulverized material with nitric + hydrochloric +
hydrofluoric acid digest of the resultant glass bead and Inductively Coupled Plasma – Mass Spectrometry
(ICP-MS) finish for 32 elements (Ba, Ce, Cr, Cs, Dy, Er, Ga, Gd, Hf, Ho, La, Lu, Nb, Nd, Pr, Rb, Sc, Sm, Sn,
Sr, Ta, Tb, Th, Ti, Tm, U, V, W, Y, Yb and Zr) including full REE suite (ALS method ME-MS81). Rare Earth
Elements are expressed as oxides for reporting, and conversion factors are given in Appendix One –
Section 2.
Quality Assurance and Quality Control Procedures
All drilling and sampling programs included appropriate Quality Assurance and Quality Control (QAQC)
procedures, including client (Critica) inserted blind standards, field duplicates, blanks, twinned drill
holes and umpire laboratory assay checks. Recovered bulk, split and received laboratory sample weights
were recorded and monitored. Periodic grinding checks were also conducted by the assay laboratory.
Descriptions of the QAQC procedures and results are summarised in Table 5.
Table 5 | Summary of QAQC procedures and results
QAQC Procedure Description
Drill-hole twinning
All drilling techniques can be susceptible to grade biases due to preferential material loss.
Critica twinned 3 AC holes with RC holes, 7 DD holes with RC and AC holes and observed
reasonable correlation in grade and in domain definition.
Field Duplicates
The field duplicates comprised of scoop samples collected from the composites at a
nominal frequency of 1 in 20 and at least one sample per major regolith domain of each drill
hole (i.e. one duplicate in the clay zone and one in the saprolite zone).
Critica used scatterplots, QQ plots, and precision plots to assess the duplicate datasets.
The QAQC graphs and summaries were made available to SRK and showed acceptable
performance. The scatterplots and QQ plots show no evidence of significant bias. The
HARD (Half average relative difference) plots show acceptable levels of precision have
been achieved, with over 90% of the pairs reporting a HARD of less than 10% for most
analytes.
Spearing and scooping are generally not considered to be reliable sampling methods.
However, the duplicate datasets do not show that these methods have introduced
significant sampling error for the analytes of interest.
Standards
Standards were routinely included in the laboratory submissions at a nominal frequency of
1 in 20 with at least one standard inserted per drill hole.
Critica entered into a joint venture agreement with OREAS to produce matrix-matched
certified reference material. The material was used to produce a series of standards across
a series of grade ranges; OREAS 471, OREAS 472, OREAS 473 and OREAS 474. The use of
matrix-matched CRMs is important for rare earth element mineralisation which may
contain difficult to dissolve minerals such as monazite, xenotime or zircon. Just as the
appropriate analytical method is required to dissolve these minerals of interest, the
12
QAQC Procedure Description
appropriate CRM is also required to ensure that the analytical methods are performing as
required.
Summary control charts prepared by Critica show acceptable ‘Standards’ performance,
with relatively low failure rates and appropriate monitoring and response when failures are
detected. Some biases are evident with Light Rare Earth Elements showing a slight low bias
across all standards. Most differences are less than 5 %.
Independent
Laboratory Checks
Critica submitted batches of pulp samples to independent laboratories for confirmatory
testing. Two batches totalling 201 pulp samples were sent to Intertek (Maddington) which
assayed for a 45-element suite using lithium borate fusion with ICP-OES/MS finish. The
same two batches of 201 pulps were then submitted to Bureau Veritas (South Australia)
which completed a 32-element suite using lithium borate fusion with an ICP-MS finish.
Analysis of the results showed very good agreement was achieved between the 3
laboratories, with no evidence of significant bias or precision differences.
Blanks
Blank samples were inserted into the laboratory batches by ALS as part of their internal
QAQC procedures at a nominal frequency of 1 in 20. The source, form, or certification of the
blanks is not described. Several REEs reported at least 1 failure, with the highest rate being
Lu (3.8%). Critica considers that the failure rates are associated with elements with the
lowest concentrations, and the failures for any given sample are generally limited to 1 or 2
analytes.
Surveys
All data used for resource estimation are reported using the MGA94 Zone 50 co-ordinate
system, with elevations based on the Australian Height Datum. The topographic dataset for
the deposit region was acquired from open-source 30 m gridded SRTM data. The collar
locations were surveyed using a Stonex S900A DGPS with nominal accuracy of ± 0.4
metres. All of the RC and AC holes were vertical and relatively shallow and downhole
surveying was not performed. The diamond core holes, which were all nominally angled at
70o
, were downhole surveyed at 30 metre intervals using gyro equipment.
Density Determination
Density data was derived from tests performed on core samples collected from seven diamond core
holes drilled in 2024. The holes were drilled using PQ3 coring equipment through the weathered zone,
stepping down to HQ3 once fresh rock was intersected. The drill-holes were broadly spaced over the
strike extent of the deposit. Density tests were performed using the following techniques:
• 388 Caliper density measurement were performed on competent core pieces ranging in length from
10 cm to one metre. The dimensions were measured prior to oven drying at 105o
C for 24 hours, with
density calculated from the dry weights and estimated volume.
• The core samples were processed using a Minalyzer core scanner. This equipment uses laser
scanning to estimate the volume of core samples stored in core trays. The core trays were weighed,
oven dried, and then reweighed, with the density estimated from dry weight and estimated core
volume. A total of 258 trays were scanned (equating to 704 metres) of which 131 tray measurements
were deemed acceptable.
• A total of 85 water immersion tests were performed. Sample sealing was not performed and the tests
were conducted on fresh rock samples only.
Critica compiled and compared the density test results and noted acceptable agreement between the
various test methods. Based on the synthesis of the results, the dry in situ bulk densities shown in Table 6
were chosen by Critica and assigned to the resource model according to lithological flagging.
Table 6 | Dry bulk densities
Lithology Dry Bulk Density (g/cm3
)
Transported Cover 1.90
Upper Saprolite - Clay 1.65
Lower Saprolite 2.00
Fresh Rock 2.80
13
Resource Estimation Methodology
The Jupiter Mineral Resource Estimate reported here was conducted by SRK Consulting (SRK) and is
based on AC, RC and DDC drilling conducted between June 2023 and March 2026. The data cut-off for the
input into the MRE was 6th
July 2026.
Geological Domains
Critica used a combination of geological logging, geochemistry and hyperspectral mineralogy to divide
the Jupiter regolith into three sub-horizontal lithological zones from surface to saprock/fresh basement:
• SAND = Cover (SRK LCODE = 10)
• RCLY = Clay Zone (SRK LCODE = 30)
• RSAP = Saprolite Zone (SRK LCODE = 40)
REE mineralisation is largely restricted to the RCLY and RSAP domains, with typically <200 ppm TREO in
the Cover (Overburden) zone. Maximum TREO grades typically occur in the lower RCLY or straddle the
RCLY – RSAP boundary, then generally decline to the top of fresh basement. A nominal threshold of 400
ppm TREO was used to define a mineralised envelope for resource estimation, with a 1200 ppm envelope
to define a high-grade core. The estimation domains are summarised in Table 7.
Table 7 | TREO Estimation domains
GCode Description
10
Material above the top of the TREO 400 domain. This is typically weakly mineralised overburden
material
20 Material between the top of the TREO 400 domain and the top of the TREO 1200 domain
30 Material within the TREO 1200 domain
40 Material below the TREO 1200 domain
Approximately 90 % of the holes finish in mineralisation that exceeds 400 ppm TREO and a lower surface
of GCode 40 was not defined using a grade threshold. Although the TREO domains (GCode) were used for
estimation control, SRK also encoded the Lithology domains (LCode) into the model. This was
implemented by using the lithology codes that Critica assigned to drill-hole samples to create surfaces
representing lithological contacts. The lithological domain coding was used to estimate hyperspectral
mineralogy to the model, and for density assignment.
Compositing and Estimation Domains
The dominant (70%) assay sampling interval was 4 m, 20% of sampling intervals were 2 m with the
remaining intervals ranging from 1 to 6 m. The geological model was used to assign regolith and
estimation domain codes to the assay samples then the flagged samples were all composited to 4 m
basis for resource estimation.
Statistical and geostatistical assessments of the major analyte grades were conducted to assist with
validation of the geology model and the selection of resource estimation parameters. Cumulative
frequency distribution plots and decay tables were used to check for outlier grades, and grade cutting
was not considered necessary.
Variographic studies were conducted on the spatially transformed data for selected analytes within the
main mineralised domain (GCODE = 30). Well-structured variograms were obtained for TREO as well as
for most of the major analytes (Figure 5). Nugget values were typically low (<10%) and total ranges were in
the order of several hundred metres, with 80% of the sill generally reached 400 m. The variograms exhibit
minimal lateral anisotropy, but significant vertical anisotropy. Where possible, it is preferable to use
similar variogram parameters