Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
29 April 2025
ASX: CRI
QUARTERLY REPORT – MARCH 2025
The Board of Critica Limited (Critica or the Company) is pleased to provide its Quarterly Activities Report for the three
months ending 31 March 2025.
HIGHLIGHTS
Jupiter Project (part of the broader Brothers Clay-Hosted Rare Earths Project)
Maiden Inferred Mineral Resource Estimate (MRE) declared
Including
GLOBAL RESOURCE
1.8 Bt @ 1,700 ppm TREO 1
(1,000ppm cut-off)
HIGH-GRADE RESOURCE
500 Mt @ 2,200 ppm TREO
(1,800ppm cut-off)
•
Establishes Jupiter as Australia’s largest and highest-grade clay hosted rare earth resource.
•
Jupiter’s REE content is globally significant and potentially strategic to Australia’s future supply chain.
•
Broad, shallow, high-grade resource remarkably consistent over a 42km2 area.
•
Average drill hole depth of just 58 metres, with more than 50% of holes ending in mineralisation.
•
Excellent high-value MREO2 content averaging approximately 23% of total REEs across global MRE.
•
Consistently very low in-situ uranium and thorium content.
•
High-grade component comparable with leading global clay-hosted REE deposits.
•
Jupiter just one of six discrete REE discoveries at the broader Brothers Project identified to date.
•
Enviable location in established mining district with key existing transport and power infrastructure.
Metallurgical testwork
•
Initial metallurgical testwork has successfully demonstrated an impressive beneficiation upgrade of
approx. 830% (9.3x) along with a 95% reduction in mass.
•
Beneficiation outcomes produced using composite sample of typical Jupiter mineralisation (including low
in-situ thorium and uranium).
•
Preliminary results confirm potential to produce a high-grade concentrate through a simple flotation
process at room temperature.
•
Also pleasing at this early/unoptimised stage, REE recoveries to beneficiated concentrate exceeded 50%.
•
Multiple metallurgical testwork streams ongoing with further results expected over coming months.
Corporate
•
Tasmanian MRT mining bond funds of approx. A$0.6 million returned to Critica in January 2025.
•
Cash of A$4.7 million and zero debt (excluding typical trade creditors) as at 31 March 2025.
•
Cash bolstered with $1m refund for Research and Development Tax Incentive received post quarter.
1
TREO represents the sum of 14 Rare Earth Elements (Lanthanum, Cerium, Praseodymium, Neodymium, Samarium, Europium, Gadolinium, Terbium, Dysprosium,
Holmium, Erbium, Thulium, Ytterbium, Lutetium) plus Yttrium expressed as oxides.
2
MREO represents the sum of the Neodymium, Praseodymium, Dysprosium and Terbium expressed as oxide.
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
1
ASX: CRI
Critica’s Managing Director, Philippa Leggat, commented:
“It has been an excellent start to 2025 with the declaration of the maiden MRE at our flagship Jupiter Project. The MRE
presents Jupiter as the largest, highest-grade clay-hosted rare earth resource in Australia. Additionally, the higher-grade
component (at a 1,800 ppm cut-off) of 520 Mt at 2,169 ppm TREO within this global resource puts us in the league of global
clay-hosted rare earth deposits in China and Brazil.
“This was an outstanding achievement for the Critica team, who have delineated this resource in a bit over a year since
discovery in November 2023. It has also proven our rapid, low-cost Aircore exploration drilling strategy as an effective means
of targeting new discoveries at both Jupiter and the larger Brothers Project. The next phase of exploration drilling will seek to
evaluate the recent satellite discoveries at the broader Brothers project, for their potential to offer additions of high-grade,
high-MREO material to the existing Jupiter MRE.
“Critica’s other primary focus is on designing a technically robust and economically efficient processing pathway for future
material mined at Jupiter. Results from initial metallurgical testwork exceeded all expectations, demonstrating the potential
to beneficiate compositive material grade by around 830%. This represents an outstanding grade uplift – a factor of nearly
ten times – through a simple flotation at ambient temperature. Importantly, this upgrade was achieved with an impressive
94.5% reduction in mass through to beneficiated concentrate, and at early-stage/unoptimised REE recoveries exceeding
50%. Rare earths are metallurgically complex in nature, so these are truly outstanding first-pass results that we intend to
build upon. We are advancing multiple metallurgical testwork streams with the aim of improving beneficiation opportunities
and then working towards producing Mixed Rare Earth Carbonate, with results expected over the course of 2025.
“Brothers and Jupiter are shaping up to be a potentially world-class rare earth asset with broad zones of very high in-situgrade mineralisation, which are both near-surface and incredibly consistent. We benefit from their strategic location within a
tier-one mining jurisdiction with easy access to quality transport, utilities and mining support infrastructure. These attributes
give us excellent optionality in designing any potential future mining and processing operation.
“We are well funded to continue advancing our two primary development workstreams through 2025, particularly with our
cash position being bolstered with the $1m R&D refund we received in April . With global markets reeling from escalating
trade tensions and China’s continued dominance in rare earth products, the strategic importance of developing a sustainable
rare earths supply cannot be understated. With a growing district-scale opportunity at Jupiter and Brothers, we have a strong
potential pathway to becoming a key player in Australia’s developing rare earths future.”
OPERATIONAL ACTIVITIES
BROTHERS AND JUPITER
Discovered in late 2023, the Jupiter high grade clay-hosted rare earth deposit is part of Critica’s wholly-owned Brothers
project. The Brothers project spans 1,650 km2 of semi contiguous granted tenure located approximately 550 kilometres
northeast of Perth and 60 kilometres west of Mount Magnet in Western Australia (Figure 1 below).
Jupiter benefits from well-established infrastructure, enhancing its development potential. The project is strategically located
within the Mt Magnet – Yalgoo area, a premier mining district of Western Australia. It is less than 10 kilometres from the Mount
Magnet-Geraldton bitumen highway, providing direct access to local labour centres and the Port of Geraldton. Access to the
project area from the bitumen highway is via unsealed tracks through the two crown pastoral lease stations that overlap the
Brothers tenements. The terrain at Jupiter is flat, sparsely vegetated and facilitates year-round access.
The mid-west gas pipeline runs parallel to the Mount Magnet-Geraldton highway, past the project site and transmission power
lines run within 40 kilometres of the site to the south-west.
A preliminary heritage survey was completed, and no Aboriginal cultural sites or materials were identified with the site deemed
a low-risk area.
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
2
ASX: CRI
Figure 1: Location Map
The Jupiter target was originally identified by geophysics with coincident aeromagnetic and gravity anomaly coupled with
anomalous rare earth element results from two co-funded EIS drill-holes drawing Critica geologists into the area. First pass
AirCore (AC) drilling of the Jupiter target along existing pastoral tracks was completed in June 2023 with every drill-hole
reporting significant rare earth mineralisation within clay and saprolite zones. The grades and thicknesses reported were
considered high compared to other known Australian clay-hosted rare earth deposits at the time. The discovery of the Jupiter
REE deposit was announced to the market in November 2023. Following the Jupiter discovery Critica conducted geophysical
surveys (gravity and magnetics) and several RC and AC drilling campaigns which delineated an area of 40 square kilometres
of high-grade, clay-hosted rare earth mineralisation. The consistent, broad zones of mineralisation up to 80 metres thick, with
grades above 1,000 ppm TREO were identified.
In 2024, two resource definition programs comprising 508 AC holes for 29,772 metres were drilled across the Jupiter project
area. The first program defined the Jupiter mineralisation to a 500 x 250 metre line spacing. The second program infilled
areas with thick intersections of >2,000 ppm TREO to a 250 x 250 metre drill spacing. The resulting information was utilised
by SRK Consulting to produce an independent MRE for Jupiter.
Maiden MRE declared for Jupiter REE Project
In February 2025, Critica achieved a key milestone through the release of its maiden MRE for Jupiter. The MRE contained an
Inferred Resource of 1.8 Bt @ 1,700 ppm TREO at a 1,000ppm cut-off, including a higher-grade component of 500 Mt @
2,200 ppm TREO at a 1,800ppm cut-off. This high-grade component is comparable with leading global clay-hosted REE
deposits.
The Jupiter MRE establishes the project as Australia’s largest and highest-grade clay hosted rare earth resource with a globally
significant REE content potentially strategic to Australia’s future supply chain.
The MRE was prepared by leading international resource consultancy, SRK Consulting, and significantly exceeded Critica’s
expectations in terms of both tonnes and grade. The MRE also highlights excellent MREO content averaging approximately
23% of total REEs along with a consistently low in-situ uranium and thorium content.
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
3
ASX: CRI
The MRE was delineated with an average drill hole depth of just 58 metres, with more than 50% of drill holes ending in
mineralisation. Average thickness of mineralisation across the deposit is 31 metres. Mineralisation begins from as little as two
metres from surface, with an average depth across the deposit of 26 metres.
Notably, the MRE was delivered in just over a year following initial discovery at Jupiter in November 2023.
Table 1 | Jupiter Inferred Grade-Tonnage Summaries.
JORC Inferred Resource
Global Resource
High-Grade Resource
Cut-off
Tonnage
TREO
MREO3
TREO (ppm)
(Bt)
(ppm)
(ppm)
200
3.28
1,156
266
300
3.04
1,230
283
400
2.91
1,267
292
500
2.69
1,335
308
600
2.44
1,417
328
700
2.22
1,492
346
800
2.06
1,550
359
900
1.91
1,603
372
1,000
1.78
1,651
383
1,100
1.70
1,679
389
1,200
1.60
1,711
397
1,400
1.24
1,828
423
1,600
0.84
1,987
459
1,800
0.52
2,169
499
2,000
0.30
2,372
542
2,200
0.17
2,578
587
For full Jupiter MRE details, tables and figures, refer to the Critica ASX announcement dated 11 February 2025.
First pass metallurgical testwork delivers 830% rare earth upgrade
Following the initial resource drill-out program at Jupiter, Critica commenced a comprehensive metallurgical program
focused on beneficiation techniques designed to remove non mineralised material and concentrate rare earth
mineralisation. Several independent Australian based and international laboratories were engaged to test a number of
techniques. As part of this initial program, Critica engaged Vietnamese based GAVAQ Solution to target gangue removal and
flotation.
Preliminary results from this initial program with GAVAQ Solution significantly exceeded expectations, delivering excellent
beneficiation outcomes using a composite sample of representative Jupiter mineralisation (including low in-situ thorium and
uranium).
A high-grade concentrate was delivered with an upgrade factor of approximately 830% (9.3x). This was achieved by
subjecting a composite sample of typical Jupiter mineralisation (grading 1,430 ppm TREO) to a simple flotation process at
ambient room temperature to produce a beneficiated product grading 13,310 ppm (or 1.331%) TREO.
Importantly, this upgrade was achieved with an impressive 94.5% reduction in mass through to beneficiated concentrate,
and at early-stage/unoptimised REE recoveries exceeding 50%.
3
MREO represents the sum of the Neodymium, Praseodymium, Dysprosium and Terbium expressed as oxide. MREO is 23% of TREO.
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
4
ASX: CRI
These results confirmed the potential for Critica to produce a high-grade concentrate through a simple flotation process at
room temperature.
While only the first process stage under consideration, this places Critica in an excellent position with respect to its
continuing metallurgical programs. These programs are designed to construct a technically robust and economically efficient
process pathway for a potential future rare earths mining and processing operation of significant scale at Jupiter.
For further details of these initial metallurgical results, refer to the Critica ASX announcement dated 23 January 2025.
CORPORATE
Research and Development Tax Incentive Refund
Post quarter, on 28 April 2025, Critica announced receipt of $1m as a refund under the research and development tax
incentive program administered by the Australian Tax Office. This refund is in addition to the cash balance and will be utilised
to continue advancing work programs.
Mining Bond released
On 17 January 2025, Critica advised on the release of its mining bond with Mineral Resources Tasmania (MRT). The bond
was released in accordance with completion of the share purchase and sale agreement for Venture Iron Pty Ltd (refer Critica
ASX release dated 24 June 2024).
Critica received returned funds totalling A$585,000, which are now available to be utilised in the Company’s 2025
exploration and advancement of Jupiter.
Liquidity
As at 31 March 2025, the Company had A$4.7 million cash on hand and zero debt (excluding typical trade creditors).
Additional information required by ASX Listing Rule 5.3
Critica notes the following aggregate payments during the quarter:
•
A$0.6 million on exploration activities (refer to Item 1.2(a) of Appendix 5B), relating to drilling and activities,
tenement fees and rates, and geological staff costs (ASX Listing Rule 5.3.1); and
•
there were no mining or development activities during the quarter (ASX Listing Rule 5.3.2); and
•
A$104,000 in aggregate of payments made to related parties or their associates (refer to Item 6.1 of Appendix 5B)
including (ASX Listing Rule 5.3.5): Directors’ fees, salaries and superannuation.
Authorised by the Board of Critica Limited.
Philippa Leggat
Managing Director
JOIN CRITICA’S INTERACTIVE INVESTOR HUB
Visit Critica Limited’s InvestorHub to sign up and engage with the Team
CONTACT US
Critica Limited
Level 2, 16 Altona Street, West Perth, Western Australia
T: + 61 8 6279 9428 | admin@critica.limited | www.critica.limited
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
5
ASX: CRI
COMPETENT PERSONS STATEMENT – EXPLORATION RESULTS
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Dr. Stuart
Owen who is a Member of the Australian Institute of Geoscientists. Dr. Owen is a permanent employee of Critica Limited and has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking
to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Dr. Owen consents to the inclusion in the report of the matters based on his information in the form and
context in which they appear.
The Information in this announcement that relates to previous exploration results for the Projects is extracted from
the following ASX announcements:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
First Pass Metallurgical Testwork Delivers 830% REE Upgrade – 23 January 2025
Jupiter Project Update – 19 December 2024
Excellent High-Grade Continuity at Jupiter and Mineral Resource Estimate Underway – 27 November 2024
Best Intersection – 67m @ 3,074ppm TREO from Latest Jupiter Drilling – 6 November 2024
Multiple Rare Earth Discoveries Near Jupiter – 17 October 2024
New Rare Earth Discovery Jupiter Satellite – 17 September 2024
Another Record Drilling Result – 57m @ 3,430ppm TREO – 17 July 2024
Best Drill Intersection to date – 58m @ 2,723ppm TREO – 17 June 2024
8m @ 5,716ppm TREO- Jupiter Drilling Continues to Outperform – 5 June 2024
Drilling Delivers More Record REE Intersections at Jupiter – 23 May 2024
Jupiter-more outstanding REE hits up to 60 m over 2000 ppm – 16 April 2024
Strategic Acquisition Adjacent to Jupiter REE Discovery – 22 March 2024
300 Drillhole Program Commences at Jupiter – 15 March 2024
Jupiter Continues to Deliver with Record NdPr over 5,000 ppm – 8 March 2024
Jupiter delivers record drill hit of 48 m @ 3,025 ppm TREO – 9 February 2024
Jupiter Delivers over 7,000 ppm TREO from Maiden RC Drilling – 29 November 2023
Massive new REE Target at Brothers with up to 3,969 ppm TREO – 9 November 2023
VMS makes High Grade clay hosted REE discover at Brothers – 1 August 2023
Venture set to drill at the Iron Duke High Grade REE Project –18 May 2023
JV into Neighbouring REE project with 49m @ 1313ppm TREO – 9 May 2023
ESTIMATION AND REPORTING OF MINERAL RESOURCES – JUPITER PROJECT
No new Mineral Resource information is contained in this report. Information in this report which refers to Mineral Resources for the Jupiter
Project in Western Australia is taken from the company’s initial ASX disclosure dated 11 February 2025 “Jupiter Maiden Resource:
Australia’s Largest and Highest Grade Clay Hosted Rare Earth Resource”, found at www.critica.limited. The disclosure fairly represents
information compiled by Mr Rodney Brown a Member of Australian Institute of Mining and Metallurgy and is an employee of SRK
Consulting (Australia) Pty Ltd, independent of Critica Limited and has no conflict of interest.
The Company confirms that all material assumptions and technical parameters underpinning the Mineral Resources Estimates referred to
within previous ASX announcements remain current and have not materially changed since last reported. The Company is not aware of any
new information or data that materially affects the information included in this announcement.
The Company confirms that the form and context in which the Competent Person's findings are or were presented have not been
materially modified.
Notes:
1.TREO represents the sum of 14 Rare Earth Elements excluding Promethium plus Yttrium expressed as oxides.
2.MREO represents the sum of the Neodymium, Praseodymium, Dysprosium and Terbium expressed as oxide
Glossary
RE – Rare earth(s)
REE – Rare earth elements
TREO – Total rare earth oxides
MREO – Magnet rare earth oxides
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
6
ASX: CRI
APPENDIX ONE: TENEMENT REGISTER
Mining tenements held at the end of March 2025 Quarter
Project
Location
Tenement
Interest at end of
March 2025
Mount Lindsay
Tasmania
RL1/2024
100%4
Tasmania
7M/2012
100%
Tasmania
EL21/2005
100%
Tasmania
EL12/2022
100%
Western Australia
P59/2116
100%
Western Australia
E59/2243
100%
Western Australia
E59/2244
100%
Western Australia
E59/2285
95%1
Western Australia
E59/2288
100%
Western Australia
E59/2506
51%2
Western Australia
E59/1989
51%2
Western Australia
E70/5077
100%
Western Australia
E70/5084
51%3
Western Australia
E70/5801
100%
Western Australia
E59/2710
100%
Western Australia
E59/2711
100%
Western Australia
E59/2819
100%
Western Australia
E59/2820
100%
Western Australia
E59/2821
100%
Western Australia
E59/2827
100%
Western Australia
E59/2889
100%
Western Australia
E59/2890
100%
Western Australia
E59/2907
100%
Western Australia
E59/2927
100%
Western Australia
E59/2928
100%
Western Australia
E59/2930
100%
Western Australia
E59/2421
100%
Western Australia
E59/2463
100%
Golden Grove North
Kulin
Brothers
Jupiter
Notes
1
A 5% interest is held by Galahad Resources Pty Ltd with Critica potentially earning up to 100%.
Critica is earning up to 90% interest from Bright Point Gold Pty Ltd on E59/1989 with a 10% interest held by Bright Point Gold. Once Critica has earned a 90% interest, Bright Point must elect to
either contribute or dilute to a royalty of 1% NSR.
3
Critica has the right to earn in to 80% interest from Exactical Pty Ltd. Exactical can elect to contribute or dilute to royalty of 2%.
4
Livingstone Mining Licence converted to a Retention Licence.
2
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
7
ASX: CRI
Mining tenements acquired and disposed during the March 2025 Quarter:
Project
Location
Tenement
Interest at beginning
of Quarter
Interest at end
of Quarter
Western Australia
E59/2782
100%
-
Disposed
Mount Gibson
Acquired
-
Beneficial percentage interests in joint venture agreements at the end of the Quarter:
Project
Location
Tenement
Interest at beginning
of Quarter
Interest at end
of Quarter
-
Beneficial percentage interests in farm-in or farm-out agreements acquired or disposed of during the Quarter:
Project
Location
Tenement
Interest at beginning of
Quarter
Interest at end of
Quarter
Nil
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
8
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Critica Limited
ABN
Quarter ended (“current quarter”)
51 119 678 385
31 March 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
-
-
(613)
(4,406)
(b) development
-
-
(c) production
-
-
(d) staff costs
(233)
(642)
(e) administration and corporate costs
(292)
(1,344)
-
-
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
30
169
1.5
Interest and other costs of finance paid
(9)
(20)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other – receipt of mining bond
-
585
1.9
Net cash from / (used in) operating
activities
(1,117)
(5,658)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(6)
(14)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
(a) entities
(b) tenements
(c) property, plant and equipment
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets (Riley)
-
2,950
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other – sale costs of non-current assets
-
(250)
2.6
Net cash from / (used in) investing
activities
(6)
2,686
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
-
6,898
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(23)
(887)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(23)
6,011
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
5,828
1,643
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,117)
(5,658)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(6)
2,686
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(23)
6,011
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
-
4,682
4,682
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
4,682
5,828
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
4,682
5,828
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
104
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
6.1 Directors’ fees, salaries and superannuation.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,117)
8.4
Cash and cash equivalents at quarter end (item 4.6)
4,682
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
4,682
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
4.19
-
$A’000
(1,117)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
.........29 April 2025……........................................
Authorised by:
The Board of Directors
................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been f
Share your feedback
Discover