Half Yearly Report and Accounts
Released
Released
Announcement PDF
Half-Year Report
31 December 2015
ABN 51 119 678 385
Contents
Contents
Corporate Directory
2
Directors’ Report
3
Lead Auditor’s Independence Declaration
11
Half-Year Financial Report
12
Directors’ Declaration
21
Independent Auditor’s Review Report
22
Venture Minerals Limited | 1
Corporate Directory
Corporate Directory
Non-Executive Chairman
Mel Ashton
Managing Director
Hamish Halliday
Technical Director
Andrew Radonjic
Non-Executive Directors
Bruce McFadzean
John Jetter
Company Secretary
Brett Dunnachie
Share Registry
Security Transfer Registrars Pty Ltd
770 Canning Highway
APPLECROSS WA 6153
Auditors
Stantons International
Level 2, 1 Walker Avenue
WEST PERTH WA 6005
Bankers
National Australia Bank
50 St Georges Terrace
PERTH WA 6000
Principal & Registered Office
288 Churchill Avenue
Subiaco WA 6008
Telephone: (08) 9381 4222
Facsimile: (08) 9381 4211
Stock Exchange Listing
Australian Securities Exchange
(Home Exchange: Perth, Western Australia)
Code: VMS
Website Address
www.ventureminerals.com.au
Venture Minerals Limited | 2
Directors’ Report
Your directors present their report on the consolidated entity consisting of Venture Minerals Limited
and the entities it controlled at the end of, or during, the half-year ended 31 December 2015.
1.
Directors
The following persons were directors of Venture Minerals Limited during the half-year and up to the
date of this report:
Mel Ashton
Hamish Halliday
Andrew Radonjic
Bruce McFadzean
John Jetter
2.
Review of Operations
South East Asia
Venture continues to progress its strategy of targeting South East Asia for exploration opportunities.
Venture has identified an extensive belt of “skarn style” mineralisation throughout the region and
continues to target base and precious metal opportunities.
Venture has established a low cost regional office in Bangkok and will look to continue to build a cost
effective portfolio of exploration projects over the medium term. The Company has had two licenses
granted in recent months and now awaits the granting of several additional licenses.
Exploration throughout the half year period highlighted the potential at the Company’s recently
granted, Thali Project. Several phases of soil sampling, rock chip sampling and geological mapping
have now delivered a sizeable anomaly covering some 45 hectares (Refer Figures One and Two). The new
discovery hosts a high grade high grade copper/lead/silver system, with rock chips assaying up to
1,860g/t silver and 27% lead.
Table One: Thali Project | Summary of Rock Chip Samples Taken from Thali North
Sample No
BJTL 22
BJTL 46
BJTL 47
BJTL 48
SKTL 003
LOBJ 04
SOTL 02A
SOTL 04
SOTL 05
Copper
(Cu)
0.3%
0.1%
0.2%
0.2%
0.2%
0.3%
0.1%
0.1%
0.4%
Lead
(Pb)
11%
1.3%
12%
6.0%
27%
5.6%
0.41%
2.8%
6.6%
Silver
(Ag)
451g/t
283g/t
656g/t
301g/t
1860g/t
157g/t
264g/t
232g/t
296g/t
Pb results rounded to two significant figures, Cu to one significant figure, refer
ASX announcement 22 October 2015 for full results.
Having identified a core zone of mineralization the Company has now extended its soil sampling
program to the north and east focussing on identifying additional mineralized areas.
Venture Minerals Limited | 3
Directors’ Report
2.
Review of Operations (continued)
Figure One: Project Map | Thailand
Following early success at Thali, Venture is planning to accelerate its exploration efforts over the
coming months. Work is likely to include further detailed surface sampling and geological mapping,
detailed geophysical surveys and the delineation of first pass drill targets.
Thali Project - Geology
Exposure in the Thali Project area is sparse and largely restricted to saprolite and saprock after
porphyritic felsic volcanic rocks, tuffaceous sedimentary rocks and sericite-altered diorite with
stockworks of oxidised sulphide and quartz veinlets. Mapping and prospecting at Thali North has
identified a north trending zone at least 300m long of gossanous quartz veins and breccias with
secondary minerals after iron and base metal sulphides (Refer Figure Two). Thali South is more deeply
weathered and preliminary work suggests the presence of a NW trending base metal stockwork vein
zone within a porphyritic igneous host. Regional scale geological mapping suggests the host volcanic
rocks are of Permian-Triassic age, and the granitic intrusions of Triassic age; the Triassic granitoid
suite is widely associated with base and precious metal deposits within the Loei Belt.
Throughout 2015 the Thai Government has been amending aspects of the mining act. Included in
these amendments are changes to the gold regulations surrounding exploration and mining.
Significant progress has been made on finalising the new gold regulations, which we hope will be
approved and implemented in the coming months. Following the implementation of the new gold
regulations Venture will conduct an assessment of the potential for its current prospects to host
economically significant gold mineralization and if appropriate apply for gold exploration rights.
Venture Minerals Limited | 4
Directors’ Report
2.
Review of Operations (continued)
Figure Two: Thali Prospect contoured soils and rock chip results
Venture Minerals Limited | 5
Directors’ Report
2.
Review of Operations (continued)
Mt Lindsay Project, North West Tasmania
Introduction
The Mt Lindsay Project (148km2) is located in north-western Tasmania (Refer Figure Three) within the
contact metamorphic aureole of the highly perspective Meredith Granite. The project sits between the
world class Renison Bell Tin Mine (Metals X Ltd/Yunnan Tin Group>231kt of tin metal produced since
1968) and the Savage River Magnetite Mine (operating for > 45 years, currently producing
approximately 2.5 Mtpa of iron pellets). Mt Lindsay has excellent access to existing infrastructure
including hydro-power, water, sealed roads, rail and port facilities.
Venture owns 100% of the tenure that hosts both the Mt Lindsay Tin-Tungsten Deposit and all of the
surrounding prospects.
Figure Three | Location Map for Mt Lindsay
Deposit/Livingstone DSO Deposit
Tin-Tungsten Deposit/Riley DSO
Since commencing exploration on the project in 2007, Venture has completed approximately 83,000m
of diamond core drilling at Mt Lindsay and defined JORC compliant Measured, Indicated and Inferred
Resources
Venture Minerals Limited | 6
Directors’ Report
2.
Review of Operations (continued)
Tin-Tungsten Resources
Table Two | Mt Lindsay Tin-Tungsten Project Tasmania Resources – October 2012
Lower
Cut
(Tin
equiv)
0.20%
0.45%
Tin
Grade
Tungsten
Grade
(WO3)
Mass
Recovery
of
Magnetic
Iron (Fe)
Grade
Copper
Grade
Contained
Tin Metal
(tonnes)
Contained
Tin/
Tungsten
Metal
(tonnes)
Category
Tonnes
Tin
Equiv.
Grade
Measured
8.1Mt
0.6%
0.2%
0.1%
17%
0.1%
18,000
29,000
Indicated
17Mt
0.4%
0.2%
0.1%
15%
0.1%
32,000
43,000
Inferred
20Mt
0.4%
0.2%
0.1%
17%
0.1%
32,000
41,000
TOTAL
45Mt
0.4%
0.2%
0.1%
17%
0.1%
81,000
113,000
Measured
4.3Mt
0.8%
0.3%
0.2%
18%
0.1%
12,000
22,000
Indicated
5.2Mt
0.7%
0.3%
0.2%
15%
0.1%
14,000
22,000
Inferred
3.9Mt
0.6%
0.3%
0.1%
9%
0.1%
12,000
17,000
TOTAL
13Mt
0.7%
0.3%
0.2%
14%
0.1%
38,000
61,000
Note: Reporting to two significant figures. Figures have been rounded and hence may not add up exactly to the given
totals. Full details of the estimate are in the ASX announcement for the Quarterly Report on 17 October 2012.
Notes:
The Sn equivalent formula used to calculate the Sn equivalent values for the Main and No.2 Skarns is as follows: Sn
Equivalent (%) = Sn% + (WO3% x 1.90459) + (mass recovery % of magnetic Fe x 0.006510) + (Cu% x 0.28019). Whereas
for the Sn equivalent formula used to calculate the Sn equivalent values for the Stanley River South and Reward Skarns is
as follows: Sn Equivalent (%) = Sn% + (WO3% x 1.65217) + (Cu% x 0.34783).
The mass recovery of the magnetic iron is determined mostly by Davis Tube Results (“DTR”).
The Sn equivalent formulae uses a tin metal price of US$23,000/t, an APT (Ammonium Para Tungstate) price of
US$380/mtu (1mtu =10kgs of WO3), a magnetite concentrate price of US$110/t and a copper metal price of US$8,000/t.
Pilot scale metallurgical testwork has been completed on the Main and No.2 Skarns with results indicating the
metallurgical recovery for tin is 72%, for WO3 is 83%, for iron in the form of magnetite is 98% and for copper is 58%. The
results of this testwork are stated in the ASX announcement of August 31 2012.
It is the Company’s opinion that the tin, WO3 and copper as included in the metal equivalent calculations for the Stanley
River South and Reward Skarns have a reasonable potential to be recovered for when the Mt Lindsay Project goes into
production.
The resource base at Mt Lindsay is hosted within two magnetite rich skarns (Main Skarn and the
No.2 Skarn) which extend over a total strike of 2.8kms and remain open at depth. Additional
indicated and inferred resources have been defined at the Reward and Stanley River South
Prospects, which extend over an additional 1.1km of strike.
In 2012 the resource base at Mt Lindsay was the subject of a Bankable Feasibility Study (“BFS”)
which entertained a 1.75 million tonne per annum operation, producing concentrates of tin,
tungsten, copper and magnetite. The study delivered an NPV8 of A$143m from a 9 year mine life
with a capital cost estimate of A$198m. Full details of the reserve statement and BFS outputs and a
list of assumptions are in the ASX announcement of 7 November 2012.
Recently, Venture has focussed efforts at Mt Lindsay on identifying additional high grade
tin/tungsten targets in close proximity to the Mt Lindsay Deposit. The low cost exploration work is
part of a broader strategy focussed on identifying high grade mineralization within trucking distance
of the existing deposit that has the potential to further strengthen the economics of the Mt Lindsay
Project.
Venture Minerals Limited | 7
Directors’ Report
2.
Review of Operations (continued)
During the past 18 months, Venture has successfully defined eight new targets considered prospective
for high grade tin/tungsten mineralization as well as targets prospective for copper and nickel
mineralization (Refer Figure Four). These targets are hosted within the broader skarn units identified
throughout the Mt Lindsay area of which to date only 10% have been drill tested.
Figure Four | Mt Lindsay - recently identified exploration targets
Riley DSO Hematite Project, North West Tasmania
The 100% owned Riley DSO Project is located 10km from the Mt Lindsay Project (Refer Figure Three)
and occurs as a hematite rich pisolitic and cemented laterite. The deposit is all at surface, located less
than two kilometres from a sealed road that accesses existing rail and port facilities.
A maiden resource statement of 2mt @ 57% Fe was defined in 2012 which resulted in the Company
doubling its overall DSO resource base, including the Livingstone Deposit, to 4.4mt @ 57% Fe.
Venture Minerals Limited | 8
Directors’ Report
2.
Review of Operations (continued)
Table Three | Resource Statement - Riley DSO Project
Resource
Tonnes
Indicated
2.0mt
Fe
(%)
57
Fe (%)
Calcined
61
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
Cr (%)
3.7
2.6
0.03
0.08
2.8
LOI
(%)
7.7
*Refer to ASX announcement on 26 July 2012.
Following completion of the resource Venture engaged independent mining engineers, Rock Team to
complete mining studies on the deposit and produce a reserve statement. With all the hematite
resources at Riley located at or near surface, the study delivered a 90% conversion rate of resource to
reserve
Table Four | Reserve Statement - Riley DSO Project
Reserve
Tonnes
Fe (%)
Fe (%)
Calcined
SiO2 (%)
Al2O3 (%)
P (%)
S (%)
Cr (%)
LOI
(%)
Probable
1.8mt
57
61
3.7
2.6
0.03
0.07
2.8
7.8
*Refer to ASX announcement on 26 July 2012.
Following last year’s Federal Court dismissal of the appeal against the environmental approvals for the
Riley DSO Project, the Company now has unencumbered approvals for any future development of the
Riley iron ore mine. The Federal Court decision in both the original case and the recent appeal
awarded costs in favour of Venture. The Company will continue to actively seek the recovery of all
legal costs associated with both cases.
During the half year period the Riley DSO Project remained on hold due to the sharp fall in iron ore
prices over the past 18 months. Although the Company made the decision to suspend operations in
August 2014, Venture had already completed extensive pre-production work at the Riley Project
putting in place all the necessary requirements to commence mining. This work has placed Venture in
a strong position should the iron ore price improve and afford the Company the opportunity to
commence production with relatively short notice.
Livingstone DSO Hematite Project, North West Tasmania
Located only 3.5km from the Company’s flagship Mt Lindsay Tin-Tungsten Deposit is the 100% owned
Livingstone DSO Hematite Deposit (Refer Figure Three). Livingstone consists of an outcropping hematite
cap overlaying a magnetite rich skarn. The hematite occurs from surface, is consistent in grade and
located only 2km from a sealed road which accesses existing rail and port facilities.
A maiden resource statement of 2.2mt @ 58% Fe was defined at Livingstone in 2011, which was
followed by a positive and robust scoping study. Additional work later in 2011 included blending and
sizing testwork and preliminary mining studies, all of which delivered positive results.
During the second half of 2012 the Company completed a resource upgrade, which resulted in 100%
of the inferred resources being converted to the indicated category.
Table Five | Resource Statement Livingstone DSO Project
Resource
Tonnes
Fe (%)
Indicated
2.4mt
57
Fe (%)
Calcined
61
SiO2
(%)
5.4
Al2O3
(%)
1.9
P (%)
S (%)
0.07
0.05
LOI
(%)
7.0
*Refer to ASX announcement on 26 July 2012.
Venture Minerals Limited | 9
Directors’ Report
2.
Review of Operations (continued)
Immediately following the resource upgrade Venture engaged independent mining engineers, Rock
Team to complete mining studies on the deposit and produce a reserve statement. With the hematite
resources at Livingstone consistent in nature and outcropping at surface the study delivered a 90%
conversion rate of resource to reserve.
Table Six | Reserve Statement - Livingstone DSO Project
Reserve
Tonnes
Fe (%)
Fe (%)
Calcined
SiO2
(%)
Al2O3 (%)
P (%)
S (%)
LOI (%)
Probable
2.2mt
57
62
5.3
1.9
0.08
0.03
7.1
*Refer to ASX announcement on 26 July 2012.
There was no field activity during the half year period.
Corporate
The net operating loss after tax for the half year ended 31 December 2015 was $2,294,294 (2014:
$1,342,654). The loss for the period includes $734,780 (2014: $943,508) in exploration and evaluation
expenditure, share based payment expenses of $427,627 (2014: $Nil) and a property, plant and equipment
impairment of $709,618 (2014: $Nil) were also recognised during the half year.
During the period the Company completed an oversubscribed one for ten rights issue. The rights issue
consisted of 28.7 million new shares at a price of 2.3 cents per share raising a total funds of $0.66 million.
As at 31 December 2015, the Company held $3,460,080 in cash.
3.
Lead Auditor’s Independence Declaration
A copy of the lead auditor’s independence declaration as required under section 307C of the
Corporations Act 2001 is set out on page 11.
This report is made in accordance with a resolution of directors made pursuant to section 306(3) of
the Corporations Act 2001.
Hamish Halliday
Managing Director
Perth, Western Australia, 14 March 2016
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by
Mr Andrew Radonjic, a full time employee of the company and who is a Member of The Australasian Institute of Mining and
Metallurgy. Mr Andrew Radonjic has sufficient experience which is relevant to the style of mineralisation and type of deposits
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Andrew
Radonjic consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not
materially changed since it was last reported.
The information in this report that relates to Ore Reserves is based on information compiled by Mr Denis Grubic, who is a
Member of the Australasian Institute of Mining and Metallurgy. Mr Grubic is an independent consultant employed by Rock
Team Pty Ltd. Mr Grubic qualifies as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Grubic consents to the inclusion in the report of
the matters based on his information in the form and context in which it appears. . It has not been updated since to comply
with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.
Venture Minerals Limited | 10
Half-Year Financial Report | 31 December 2015
Contents
Consolidated Statement of Profit or Loss and Other Comprehensive Income
13
Consolidated Statement of Financial Position
14
Consolidated Statement of Changes in Equity
15
Consolidated Statement of Cash Flows
16
Condensed Notes to the Consolidated Financial Statements
17
Directors’ Declaration
21
Independent Auditor’s Review Report
22
This interim financial report does not include all the notes of the type normally included in an annual
financial report. Accordingly, this report is to be read in conjunction with the annual report for the
year ended 30 June 2015 and any public announcements made by Venture Minerals Limited during
the interim reporting period in accordance with the continuous disclosure requirements of the
Corporations Act 2001.
This interim financial report covers the consolidated entity consisting of Venture Minerals Limited and
its subsidiaries. The financial report is presented in the Australian currency.
Venture Minerals Limited is a company limited by shares, incorporated and domiciled in Australia. Its
registered office and principal place of business is:
Venture Minerals Limited
288 Churchill Avenue
Subiaco WA 6008
A description of the nature of the group’s operations is included in the directors’ report on pages 3 10, which is not part of this financial report.
The interim financial report was authorised for issue by the directors on 14 March 2016. The
Company has the power to amend and reissue the financial report.
Through the use of the internet, we have ensured that our corporate reporting is timely, complete, and
available globally at minimum cost to the company. All press releases, financial reports and other
information are available on our website: www.ventureminerals.com.au.
Venture Minerals Limited | 12
Consolidated Statement of Profit or Loss and Other Comprehensive Income
For the Half-Year Ended 31 December 2015
Notes
Revenue
Revenue from continuing operations
Other income
Expenditure
Administration costs
Consultancy expenses
Employee benefits expense
Share based payment expenses
Occupancy expenses
Compliance and regulatory expenses
Insurance expenses
Depreciation
Exploration expensed
Impairment of plant and equipment
Loss before income tax
Income tax benefit
Loss for the half-year attributable to owners
Other comprehensive income
Items that may be reclassified to profit or loss
Exchange differences on translation of foreign operations
Items that will not be classified to profit or loss
Total comprehensive loss for the half-year attributable to
owners
Basic loss per share (cents per share)
Diluted loss per share (cents per share)
4
Consolidated
31 December
31 December
2015
2014
$
$
48,053
11,611
59,664
105,512
793,922
899,434
(153,979)
(57,432)
(129,157)
(427,627)
(58,950)
(44,606)
(16,918)
(20,891)
(734,780)
(709,618)
(241,111)
(285,248)
(563,610)
(81,540)
(65,109)
(27,455)
(24,899)
(943,508)
(9,608)
(2,294,294)
(1,342,654)
-
-
(2,294,294)
(1,342,654)
(2,302)
(2,296,596)
17,530
(1,325,124)
(0.8)
(0.8)
(0.5)
(0.5)
The above consolidated statement of profit or loss and other comprehensive income should
be read in conjunction with the accompanying notes.
Venture Minerals Limited | 13
Consolidated Statement of Financial Position
As at 31 December 2015
Notes
Consolidated
31 December
2015
$
30 June
2015
$
Current Assets
Cash and cash equivalents
Trade and other receivables
Total Current Assets
5
6
3,460,080
71,184
3,531,264
3,260,962
65,435
3,326,397
Non-Current Assets
Trade and other receivables
Property, plant and equipment
Exploration and evaluation expenditure
Total Non-Current Assets
6
7
8
523,600
1,153,623
1,677,223
1,079,600
2,016,136
3,095,736
5,208,487
6,422,133
Current Liabilities
Trade and other payables
Financial liabilities
Provisions
Total Current Liabilities
194,711
6,360
235,190
436,261
160,391
10,674
232,108
403,173
Non-Current Liabilities
Financial liabilities
Provisions
Total Non-Current Liabilities
106,026
106,026
925
99,828
100,753
Total Liabilities
542,287
503,926
4,666,200
5,918,207
73,000,699
588,695
(68,923,194)
4,666,200
72,383,737
163,370
(66,628,900)
5,918,207
Total Assets
Net Assets
Equity
Issued capital
Reserves
Accumulated losses
Total Equity
The above consolidated statement of financial position should be read in conjunction with the
accompanying notes.
Venture Minerals Limited | 14
Consolidated Statement of Changes in Equity
For the Half-Year ended 31 December 2015
Consolidated
Option
Reserve
Total
$
Foreign
Currency
Translation
Reserve
$
$
$
72,383,737
(65,372,395)
12,357
1,460,610
8,484,309
-
(1,342,654)
(1,342,654)
17,530
17,530
-
(1,342,654)
17,530
(1,325,124)
-
-
-
-
-
-
-
-
-
-
Balance at 31 December 2014
72,383,737
(66,715,049)
29,887
1,460,610
7,159,185
Balance at 1 July 2015
Total comprehensive loss for the halfyear:
Loss for the half-year
Foreign exchange differences
Total comprehensive loss for the halfyear:
72,383,737
(66,628,900)
(26,692)
190,062
5,918,207
-
(2,294,294)
(2,294,294)
(2,302)
(2,302)
-
(2,294,294)
(2,302)
(2,296,596)
616,962
-
-
-
616,962
616,962
-
-
427,627
427,627
427,627
1,044,589
73,000,699
(68,923,194)
(28,994)
617,689
4,666,200
Balance at 1 July 2014
Total comprehensive loss for the halfyear:
Loss for the half-year
Foreign exchange differences
Total comprehensive loss for the half year
Transactions with owners in their capacity as
owners:
Contributions of equity (net of transaction
costs)
Share based payment transactions
Transactions with owners in their capacity as
owners:
Contributions of equity (net of transaction
costs)
Share based payment transactions
Balance at 31 December 2015
Contributed
Equity
Accumulated
Losses
$
The above consolidated statement of changes in equity should be read in conjunction with the
accompanying notes.
Venture Minerals Limited | 15
Consolidated Statement of Cash Flows
For the Half-Year ended 31 December 2015
Notes
Consolidated
31 December
31 December
2015
2014
$
$
Cash flows from operating activities
Payments to suppliers and employees
Payments for exploration and evaluation
Interest and other finance costs paid
Interest received
(478,989)
(685,405)
46,985
(1,036,321)
(1,553,840)
(1,363)
120,470
Net cash (used in) operating activities
(1,117,409)
(2,471,054)
Cash flows from investing activities
Purchase of property, plant and equipment
Proceeds from sale of fixed assets
Refund of project bonds
(1,435)
145,000
556,000
(527,129)
19,091
128,260
Net cash received from/(used in) investing activities
699,565
(379,778)
Cash flows from financing activities
Proceeds from issue of shares
Share issue transaction costs
660,837
(43,875)
-
Net cash provided by financing activities
616,962
-
Net increase/(decrease) in cash and cash equivalents
199,118
(2,850,832)
Cash and cash equivalents at the beginning of the period
3,260,962
6,674,595
3,460,080
3,823,763
Cash and cash equivalents at the end of the period
5
Amounts shown above relating to payments to suppliers and employees include goods and
services tax. The above consolidated statement of cash flows should be read in conjunction
with the accompanying notes.
Venture Minerals Limited | 16
Condensed Notes to the Financial Statements | Half-Year ended 31 December 2015
1.
Basis of preparation of half-year report
This consolidated interim financial report for the half-year reporting period ended 31 December 2015
has been prepared in accordance with Accounting Standard AASB 134 Interim Financial Reporting and
the Corporations Act 2001.
This interim financial report does not include all the notes of the type normally included in an annual
financial report. Accordingly, this report is to be read in conjunction with the annual report for the
year ended 30 June 2015 and any public announcements made by Venture Minerals Limited during
the interim reporting period in accordance with the continuous disclosure requirements of the
Corporations Act 2001.
The accounting policies adopted are consistent with those of the previous financial year and
corresponding interim reporting period.
The interim report has been prepared on a historical cost basis. Cost is based on the fair value of the
consideration given in exchange for assets. The company is domiciled in Australia and all amounts are
presented in Australian dollars, unless otherwise noted.
a.
Refundable R&D Incentives
Change in accounting policy
The group previously accounted for refundable R&D tax incentives as an income tax benefit. The
entity has determined that these incentives are more akin to government grants because they are
not conditional upon earning taxable income. The group has therefore made a voluntary change
in accounting policy during the reporting period. Refundable tax incentives are now accounted
for as a government grant under AASB 120 Accounting for Government Grants and Disclosure of
Government Assistance because the directors consider this policy to provide more relevant
information to meet the economic decision-making needs of users, and to make the financial
statements more relevant.
b.
New and amended standards and interpretations applicable to the current half-year reporting
period
There are no new standards and amendments to standards that are mandatory for the first time
for the half-year beginning 1 July 2015 that affected any of the amounts recognised in the current
period or any prior period, although it may have caused minor changes to the Group’s disclosures.
AASB 9 Financial Instruments addresses the classification, measurement and derecognition of
financial assets and financial liability. The standard is not applicable until 1 January 2017 but is
available for early adoption. The group has not yet decided when to adopt AASB 9. The directors
anticipate that the adoption of AASB 9 will not have a material impact on the Group’s financial
instruments.
Venture Minerals Limited | 17
Condensed Notes to the Financial Statements | Half-Year ended 31 December 2015
2.
Segment information
Management has determined the operating segments based on the reports reviewed by the chief
operating decision maker that are used to make strategic decisions. For the purposes of segment
reporting the chief operating decision maker has been determined as the board of directors. The board
monitors the entity primarily from a geographical perspective, and has identified three operating
segments, being exploration for mineral reserves within South East Asia, Australia and the
corporate/head office function.
The segment information provided to the board of directors for the reportable segments for the halfyear ended 31 December 2015 is as follows:
South East
Asia
$
Half-year ended 2015
Total segment revenue
Interest revenue
Total segment profit/(loss) before income
tax
Half-year ended 2014
Total segment revenue
Interest revenue
Total segment profit/(loss) before income
tax
Exploration
Corporate
Australia
$
Total
$
$
-
-
48,053
48,053
48,053
48,053
(359,857)
(1,085,320)
(849,117)
(2,294,294)
-
-
105,512
105,512
105,512
105,512
(156,903)
(786,605)
(399,146)
(1,342,654)
Total segment assets
31 December 2015
30 June 2015
33,337
36,065
1,043,299
1,905,975
4,131,851
4,480,093
5,208,487
6,422,133
Total segment liabilities
31 December 2015
30 June 2015
12,765
19,383
-
529,522
484,543
542,287
503,926
3.
Dividends
No dividends have been paid or recommended during the current or prior interim reporting period or
subsequent to reporting date.
Venture Minerals Limited | 18
Condensed Notes to the Financial Statements | Half-Year ended 31 December 2015
Consolidated
31 December 2015
31 December 2014
$
$
4.
Other Income
R&D grant
Net gain on disposal of property, plant and equipment
11,611
11,611
793,922
793,922
(a) R&D grant
The R&D grant of $793,922 in the 31 December 2014 half-year represents the rebate under the
research and development (R&D) incentive scheme for the financial year ended 30 June 2014. An
R&D grant for the financial year ended 30 June 2015 has not been assessed as at 31 December
2015.
Consolidated
31 December 2015
30 June 2015
$
$
5.
Cash & Cash Equivalents
(a) Cash & cash equivalents
Cash at bank and in hand
Deposits at call
Total cash and cash equivalents
1,210,080
2,250,000
3,460,080
360,962
2,900,000
3,260,962
(b) Cash at bank and on hand
Cash on hand is non-interest bearing. Cash at bank bears interest rates between 0.00% and
2.00% (3