Investor Webinar Presentation - February 2026
Released
Released
Announcement PDF
Australia’s Largest Clay-Hosted Magnet REE System
From Discovery to Development in 23 Months
Corporate Presentation | February 2026| ASX: CRI
Scale • Simplicity • Speed
Beneficiation-first. Sovereign-aligned. Commercially advancing
2
Disclaimer
Authorised by the Board of Critica Limited
This Presentation (Presentation) has been prepared by Critica Limited (CRI or the Company) and
is authorised by the Board of CRI. The information contained in this Presentation is a professional
opinion only. Certain information in this Presentation has been derived from third parties and
though CRI has no reason to believe that it is not accurate, reliable or complete, it has not been
independently audited or verified by CRI.
This Presentation contains general and background information about CRI’s current activities as
at the date of this Presentation and should not be considered to be comprehensive or to
comprise of all the information that an investor should consider when making an investment
decision. CRI is not responsible for providing updated information and assumes no responsibility
to do so. Recipients should conduct their own investigations and perform their own analysis of
the information, statements and opinions contained and this Presentation should be read in
conjunction with CRI’s other periodic and continuous disclosure announcements lodged with the
ASX.
This Presentation is for information purposes only. Neither this nor the information contained in it
constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale
of CRI shares in any jurisdiction. This Presentation is not investment advice or a recommendation
to acquire CRI securities and has been prepared without taking into account the recipient's
investment objectives, financial circumstances or particular needs. Recipients should seek
professional advice before deciding if an investment is appropriate.
All securities transactions involve risks, which include (among others) the risk of adverse or
unanticipated market, financial or political developments.
To the fullest extent permitted by law, CRI, its officers, employees, related bodies corporate,
agents and advisers expressly disclaim, to the maximum extent permitted by law, all liabilities
(however caused, including negligence) in respect of, make no representations regarding, and
take no responsibility for, any part of this Presentation and make no representation or warranty
as to the currency, accuracy, reliability or completeness of any information, statements, opinions,
conclusions or representations contained in this Presentation. No responsibility for any errors or
omissions from this arising out of negligence or otherwise is accepted.
Any forward-looking statements and forward-looking information included in this Presentation
involve subjective judgment and analysis and are subject to uncertainties, risks and
contingencies, many of which are outside the control of, and may be unknown to, CRI. In
particular, they speak only as of the date of this Presentation, they assume the success of CRI’s
strategies, and they are subject to significant regulatory, business, competitive and economic
uncertainties and risks. Actual future events may vary materially from the forward-looking
statements and forward-looking information and the assumptions on which they are based.
Recipients of this Presentation are cautioned to not place undue reliance on such forward-
looking statements and forward-looking information.
Basis of Preparation
CRI has not completed a Scoping or Feasibility Study. References to development pathways are
aspirational and do not imply economic viability. Inferred Mineral Resources are insufficient to support
Ore Reserves and cannot underpin production targets or forecasts. Metallurgical results are preliminary
testwork on selected samples; applicability across the deposit and at scale remains to be
demonstrated. Future studies, permits and funding (including equity) may be required before any
development decision.
Competent Persons Statement
The information in this report that relates to exploration results including geology interpretation, data
preparation and data quality is based on work compiled by Dr. Stuart Owen who is a Member of the
Australian Institute of Geoscientists. Dr. Owen is a permanent employee of Critica Limited and has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (JORC code). Dr. Owen consents to the inclusion in the report of the matters based on his
information in the form and context in which they appear.
This Presentation refers to Critica's mineral resource estimate at the Jupiter Project. The information in
this Presentation that relates to that mineral resource estimate has been extracted from Critica's
previous ASX announcement entitled Jupiter Maiden Resource – Australia’s Largest Clay Hosted which
Critica announced to the ASX on 11 February 2025 and 13 August 2025 Jupiter Confirmed as Australia’s
Largest MREO Clay Resource. A copy of the announcements are available at www.asx.com.au (ASXCRI)
or at www.critica.limited.
Critica confirms that it is not aware of any new information or data that materially affects the
information included in that announcement and, in relation to the estimate of the mineral resource,
confirms that all material assumptions and technical parameters underpinning the estimate in that
announcement continue to apply and have not materially changed. The Competent Person in relation to
the mineral resource estimate in that announcement was Rodney Brown. Critica confirms that the form
and context in which the Competent Person's findings are presented have not been materially modified
from that announcement.
The Information in this presentation relates to previous exploration results extracted from the following
ASX announcements:
• 16 February 2026 – Critica Produces First MREC from Jupiter at ANSTO
• 2 December 2025 – Second High-Grade MREP Shows Strong Magnet REE & Y Grades
• 17 November 2025 – Critica’s MREP Flowsheet Achieves 63% Gallium Leach Recovery
• 28 October 2025 – Jupiter Delivers First High Grade 84% TREO MREP
• 29 September 2025 – Consistent Bulk Sample Results Strengthen Jupiter Pathway
• 1 September 2025 - Critica to produce high-grade REE concentrate at pilot plant
• 26 August 2025 - ANSTO & Minutech engaged to produce first MREC from Jupiter
• 13 August 2025 – Jupiter Confirmed as Australia’s Largest MREO Clay Resource
• 16 July 2025 – Critica Advances Jupiter – Outstanding Magnet and HREO Grades
• 28 May 2025 – Critica Commences Bulk Metallurgical Testwork
• 5 May 2025 – Drilling Targets Restricted Heavy REE at Satellite Prospects
• 11 February 2025 – Jupiter Maiden Resource – Australia’ Largest Clay Hosted
• 23 January 2025 – Frist Pass Metallurgical Testwork Delivers 830% REE Upgrade
Critica.limited
ASX:
CRI
February
2026
The West Has a Magnet REE Supply Problem
Highly Concentrated Supply
• China dominates magnet REE mining, processing and separation
Structural Demand Growth
• EVs, AI infrastructure and defence accelerating magnet demand
Development Time Constraint
• 6–18 years from discovery to production
EVs
Defense
Platforms
Robotics
Wind
Turbines
AI
Processors
The issue is not access - It is custody of supply
3
Critica.limited
ASX:
CRI
February
2026
4
Why It Matters - Rare Earths Power Advanced Economies
Critica.limited
ASX:
CRI
February
2026
Sources: PwC Sizing the Prize: What’s the Real Value of AI for Your Business? (2017, reaffirmed in PwC AI outlook updates 2023–2024); International Energy Agency (IEA) Critical Minerals Market Review (2023,
2024) and Energy & AI (2024); U.S. Geological Survey (USGS) Mineral Commodity Summaries – Rare Earths (2024, 2025); U.S. Department of Defense critical materials and industrial base disclosures (2021–2024);
Adamas Intelligence rare-earth magnet demand analysis (2023–2024); Visual Capitalist (DoD/USGS compiled data, 2023–2024).
Defence
F-35 Fighter Jet
Arleigh Burke DDG-51 Destroyer
Virginia Class Submarine
418 KG
Rare Earths Used
Nd Pr Sm Dy
Tb Eu Y
2,600 KG
Rare Earths Used
Nd Pr Sm Dy
Tb La Gd Y
4,600 KG
Rare Earths Used
Nd Pr Sm Dy
Tb La Gd Y
Electric Vehicles
Robotics & Automation
AI & Data Centres
Typical EV
Premium EV & Performance Motors
1-2 KG
Rare Earths Used
2-4 KG
Rare Earths Used
Industrial Robots
Advanced Humanoid Precision Robots
1-3 KG
Rare Earths Used
2-6 KG
Rare Earths Used
Nd Pr Sm
Dy Tb Y
Nd Pr Sm
Dy Tb Y
Multiple Uses
100s KGs
Rare Earths Used
Nd Pr Ga
Dy Tb Y
Cooling fans & pumps
Power management systems
Precision motors
Power electronics & grid interface
Backup power systems
Nd Pr Sm
Dy Tb Y
Nd Pr Sm
Dy Tb Y
Jupiter & Brothers REE Project
1.8 Bt @ 1,700 ppm TREO (1,000 ppm cut off)
Including 520 mt @ 2,200 ppm TREO (1,800 ppm cut off)
Perth
Geraldton
5
Critica’s Answer: Jupiter
Scale - Australia's largest clay-hosted magnet REE resource
Simplicity - Beneficiation-first flowsheet validated
1. Refer to Jupiter resource announcements dated 11 Feb, 13 Aug, 10&28 Oct and 2 Dec 2025
Critica.limited
ASX:
CRI
February
2026
1
2
Speed - Scoping Study underway
3
Scale - Australia’s largest clay-hosted magnet REE resource1
6
What Makes Jupiter Different
1.8Bt
Global Resource
TREO 1700ppm
~95%
Mass Reduction
Beneficiation testwork
>800%
Grade Uplift
Beneficiation testwork
MREPs
Both MREO & MREC
Products
MREC up to 58% TREO
MREO up to 86% TREO
U&Th
Exceptionally
Low ppm
63% Ga
Integrated
Flowsheet
63% Recovery
39ppm Ga
70kt
Contained Ga2O3
640Mt
Magnet REO
Resource
REO 487ppm
Critica.limited
ASX:
CRI
February
2026
Resource Scale ~1.8Bt TREO – Australia’s largest clay-
hosted magnet rare earth deposit
Beneficiate first Advantage, ~95% mass rejection, 6–
10x upgrade before leaching, reduce capital footprint
Product Validation High-grade MREC/MREO. Scoping
Study underway
Location Tier-1 Western Australia, strong
infrastructure
Policy Alignment Western critical minerals
frameworks, OEM demand
By product potential— Integrated flowsheet including
iron concentrate, 63% Gallium extraction
TIER 1 WA LOCATION
Proven Mining Jurisdiction
TREO = Total Rare Earth Oxides | MREO = Mixed Rare Earth Oxides | MREC = Mixed Rare Earth
Carbonate | Ga = Gallium (Ga₂O₃ eq.) | U/Th = Uranium & Thorium | ppm = parts per million | Bt/Mt/kt
= billion/million/thousand tonnes
7
Clay-Hosted Advantage: Designed for
Beneficiation Jupiter Project Lease Area - flat
terrain, pastoral lease, native title
extinguished (Feb 2026 drilling
campaign)
• Flat, low-relief terrain
• Native title extinguished — clear tenure pathway
Low Strip. Simple Mining Profile
1
Upfront Beneficiation. Reduced Footprint
2
• ~95% mass rejection, 6–10× upgrade
• Lower waste, water and reagent intensity
Demonstrated Metallurgical Responsiveness
3
• Clay properties support REE upgrading and co-recovery
within the same circuit
These are aspirational statements and are not intended to be forecasts, as the Company does not yet have reasonable grounds to expect that the matters on this slide will be achieved
Critica.limited
ASX:
CRI
February
2026
Jupiter T1 Location - located within
trucking distance of services, power
and port infrastructure
Tier-1 Western Australia
4
• Infrastructure rich
• Proven, stable mining jurisdiction
8
Integrated Flowsheet with By-Product Leverage
~95% mass rejection and 6–10× upgrade at bulk scale
High-grade commercial quality MREO and MREC produced
Strong yttrium (Y) enrichment and gallium (Ga) co-recovery
Preliminary large-scale testwork (400 kg bulk sample) indicates ~95% mass rejection and 6–10× upgrade prior to leach across multiple Jupiter ore types. Applicability across the broader deposit and at commercial scale remains to be demonstrated. These
are aspirational statements and not intended to be forecasts - Applicability across the broader deposit and at commercial scale remains to be demonstrated.
Mixed Rare Earth Product (MREP) - An intermediate product in rare earth processing, typically containing 40s–80s% TREO. MREP can be produced as a carbonate (MREC) or oxide (MREO) and is the preferred feedstock for downstream separation
facilities..
Critica.limited
ASX:
CRI
February
2026
Mixed Rare Earth Oxide
(MREO)
Mixed Rare Earth Carbonate
(MREC)
MREO/MREC
Execution Momentum
* All indicative start dates remain subject to future study outcomes, market conditions, permitting, financing and Board approval.
Critica.limited
ASX:
CRI
February
2026
9
Discovery
Nov 2023
Greenfields discovery to world class Rare Earths Project in Tier 1 Mining Jurisdiction
First High Grade Mixed
Rare Earth Oxide 84%
TREO
Scoping Study
First pass
metallurgy
830% upgrade
Jan 2025
Maiden 1.8Bt
resource
Feb 2025
Initial bulk
sampling –
95% mass
upgrade 6-10x
upgrade
Sept 2025
First High
Grade MREO
(84% TREO,
gallium co-
extraction)
Oct 2025
Second High
Grade Mixed
Rare Earth
Oxide 86%
TREO, 24.7%
Magnet REO’s
Dec 2025
Scoping Study
H1 2026*
Pre-feasibility Study
H2 2026*
Definitive Feasibility Study
Potential FID
2029*
Construction and
Commissioning
2029*
First High
Grade MREC
58% TREO
Feb 2026
By-product development
Offtake & Strategic Partnerships discussion (Ongoing)
2023 2025 2027
2026 2028 2029
H2 2027*
23 months
Beneficiation optimisation
Pilot plant
Resource uplift
Drilling
10
Scoping Study: Engineering the Base Case
Sedgman Appointed as Lead Engineer
• Define a robust, executable base-case development pathway
• Integrate the beneficiation-first flowsheet with mining, processing and
infrastructure concepts
• Establish baseline project economics
• Provide a disciplined platform for funding, partnering and downstream engagement
• Create a clear pathway
Critica.limited
ASX:
CRI
February
2026
Purpose of the Scoping Study
Experienced, Independent Team
Lead Engineer Mining Resource update
Active Workstreams
• Metallurgical optimisation underway at ANSTO, Minutech-AMML, refining MREO/MREC pathways and product specifications
• Pilot-scale beneficiation with GAVAQ, validating closed-circuit operation and optimising the “beneficiate-first” flowsheet
• Targeted drilling planning underway to support resource optimisation and development inputs
Jupiter Project 2026 drilling campaign –
QA/QC Sample Verification
11
Experienced Operators, Not Just Developers
Proven Track Record in Critical Minerals Project Delivery
Jacob Deysel BSc Mining, MBA
CEO – Mining engineer with 25+ years in global critical mineral leadership—from Rio Tinto to Rare Earths
and UEC—expert at scaling projects into production.
Jamie Byrde BComm, CA, AGIA
CFO – Finance professional with 20+ years in ASX-capable CFO and company secretary roles, specialising
in governance, compliance and capital discipline.
Dr. Stuart Owen BSc (Geology), PhD (Geology)
Exploration Manager – PhD geologist with 25+ years of exploration success across four continents; led
discovery of Paulsens gold and the Jupiter REE deposit.
Dr. Natalee Bonnici BSc Hon (Geology), PhD (Geometallurgy)
Senior Exploration Geologist – 15+ years as a Geologist and PhD geometallurgist experienced in linking
mineralogy to metallurgical behaviours; part of the discovery of the Triumph VHMS deposit, Leonora WA;
developed and delivered resources at Northern Star Kalgoorlie.
Dr. Thi Thu Hien Dinh BSc (Mineral Processing), PhD (Metallurgy)
Senior Metallurgist – PhD metallurgist with 23+ years in rare earths and battery metals; led processing
teams across REE, lithium, and nickel projects.
Tim Lindley MCom, BA, GAICD, FGIA
Non-Executive Chairman – Seasoned ASX Chair and NED with 25 years in global investment banking
(Morgan Stanley, Barclays, Deutsche and UBS), adept in equity raising, project finance and growth M&A.
Nick Cernotta B.Eng (Mining)
Non-Executive Director – Mining engineer with 40 years of global multi-commodity, corporate and
operational leadership experience (Fortescue, Barrick, MacMahon). Independent NED and Chair roles across
ASX-listed companies.
• Proven track record in critical
minerals project delivery
• Experience from exploration
through to production
• Board and management aligned
on disciplined execution
• Deep WA industry, OEM and
investor relationships
Board
Management
Critica is not just a resource story —
delivered by people who’ve done it before
Critica.limited
ASX:
CRI
February
2026
12
Critica Limited (ASX:CRI)
Owner of Australia's Largest Clay REE Resource1
Company Snapshot
ASX-listed Since 2006, critical minerals focused
Ticker CRI.ASX
Primary Project Jupiter Rare Earths Project (WA)
Other Assets Mt Lindsay Tin-Tungsten (Tasmania)
Jurisdiction 100% owned Australian portfolio
Shareholder Summary
1. Refer MRE announced dated 11 February 2025 and MRE Update dated 13 August 2025.
2. Share price, market cap and EV as at 25 February 2026
3. Cash as at 31 December 2025 of $7.2m plus Tranche 2 Placement of $2.7m (before costs)
% Holding
Top 20 Shareholders 22.41%
WGS 2.3%
Elphinstone Group 2.0%
Board and Management 2.0%
Lion Selection Group 2.0%
NorthStar Impact Fund 1.5%
Financial Snapshot
3.01Bn
Shares on issue
$84.3M
~$10M
Cash3
Nil
Debt
$74.3M
Enterprise Value2
Market Capitalisation2
$0.028
Last Price2
Share Price Performance (12 months)
Critica.limited
ASX:
CRI
February
2026
13
Diversified Critical Minerals Optionality
Critica’s original asset under review
with new Tin and Tungsten prices
• Mt Lindsay is one of the largest
undeveloped tin-tungsten
deposits globally
• Contained metal:
• 81,000t of Tin &
• 3,200,000 mtu Tungsten
Trioxide (WO3) ~32,000t
• Tin and tungsten prices are
accelerating, driven by
tightening global supply,
renewed demand from
electronics, semiconductors and
defence sectors
• Previously completed Bankable
Feasibility Study now under
review
1. Combined resource – Measured, Indicated & Inferred - Refer to ASX release 17 October 2012.
Mt Lindsay Tin Tungsten Project1
Critica.limited
ASX:
CRI
February
2026
14
A Rare Earth Project Built on Scale,
Simplicity and Speed
• Australia’s largest clay-hosted magnet REE resource
• ~680,000 t contained MREO (including Nd, Pr, Dy, Tb)
• District-scale growth across 1,353 km²
Scale
01
Simplicity
02
Speed
03
• Beneficiate-first flowsheet
• ~95% mass rejection, >800% grade uplift
• Low U/Th basket — lower permitting complexity, smaller footprint
• Scoping Study underway
• Metallurgical optimisation (ANSTO, GAVAQ, Minutech-AMML)
• Milestone-driver development pathway
Product → Proof → Economics → Partners → PFS
Scale, metallurgy and execution —
aligned
Near-term value catalysts
These are aspirational statements and are not intended to be forecasts, as the Company does not yet have reasonable grounds to
expect that the matters on this slide will be achieved
Critica.limited
ASX:
CRI
February
2026
Contact
ASX: CRI
Address: Level 2, 16 Altona Street, West Perth WA 6005
Website: critica.limited
Follow Us
linkedin.com/company/criticaltd
@Critica_CRI
Investor Relations
Dannika Warburton
Investability
investors@investability.com.au
Critica CEO
Jacob Deysel
Phone: +61 8 6279 9428
Email: info@critica.limited
16
Jupiter - Scale
A large-scale, high-grade clay-hosted resource - now validated through beneficiation
and commercial-quality MREO and MREC
1.8Bt
Global Resource
TREO 1700ppm
Illustrative only. Jupiter resource is Inferred (ASX: 11 Feb & 13 Aug 2025) and not directly comparable to peers with
Indicated/Measured resources or advanced studies. Refer to Appendix C for source data for peer comparisons.
Australian Clay Hosted REE Deposits
U&Th
Exceptionally
Low ppm
39ppm Ga
70kt
Contained Ga2O3
640Mt
MREO Resource
MREO 487ppm
Critica.limited
ASX:
CRI
February
2026
17
Jupiter: Sustainability Advantage
Built-In, Not Bolted-On
Critica’s Jupiter project is being
advanced with a focus on
sustainability principles, leveraging
geological and processing
characteristics that have the
potential to reduce environmental
impact and align with global
decarbonization objectives
Mass rejection
before leaching
95%
Preliminary testwork indicates exceptionally low uranium and thorium
content, significantly below regulatory thresholds — a favourable
characteristic for handling and export
Pilot-scale beneficiation results from a 400 kg bulk sample show ~95%
mass rejection across multiple ore types, meaning substantially less
material requires downstream processing and storage compared to
untreated feed
Flowsheet design under evaluation suggests lower water and energy
intensity than direct-leach approaches, reflecting potential processing
efficiencies
Standard heritage assessment undertaken – low risk area
Clean Geology
Smaller Footprint
Resource Efficiency
Heritage Assessment
Critica.limited
ASX:
CRI
February
2026
18
Appendix A: Glossary
Key Terms and Definitions
1
TREO/Magnet REO
Total Rare Earth Oxides / Magnet Rare Earth Oxides – Magnet REO refers
specifically to those rare earth elements used in permanent magnets (primarily Nd,
Pr, Dy, Tb)
2
NdPr
Neodymium and Praseodymium - The two most common rare earth elements used in
permanent magnets, typically accounting for ~90% of magnet composition
4
MREP
Mixed Rare Earth Product (MREP) - An intermediate product in rare earth
processing, typically containing 40s–80s% TREO. MREP can be produced as a
carbonate (MREC) or oxide (MREO) and is the preferred feedstock for downstream
separation facilities.
3
Dy, Tb
Dysprosium and Terbium - Heavy rare earth elements added to magnets to improve
performance at high temperatures, critical for EV traction motors and wind turbines
Critica.limited
ASX:
CRI
February
2026
19
Appendix B: Jupiter Inferred Mineral Resource Estimate
Mineral Resource Estimate prepared by globally recognised, tier one consultants, SRK Consulting.
For full Jupiter MRE detail including all component REO grades and gangue material content refer to ASX Announcement 11 February 2025.
Jupiter Inferred Grade-Tonnage Summaries
Cut-off Tonnage TREO MREO La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 Ga2O3
TREO (ppm) (Bt) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
1,000 1.78 1,651 383 342 762 81 284 41 9 25 3 14 2 6 1 5 1 74 39
1,800 0.52 2,169 499 444 1,023 106 371 53 11 31 4 18 3 8 1 6 1 90 42
Cut-off Tonnage TREO MREO La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3
TREO (ppm) (Bt) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
200 3.28 1,156 266 249 526 57 197 28 6 17 2 10 2 5 1 4 1 52
300 3.04 1,230 283 264 560 61 210 30 6 19 2 11 2 5 1 4 1 56
400 2.91 1,267 292 271 578 63 216 31 7 19 2 11 2 5 1 4 1 57
500 2.69 1,335 308 283 610 66 228 33 7 20 2 12 2 5 1 4 1 61
600 2.44 1,417 328 298 649 70 243 35 7 22 3 12 2 6 1 4 1 65
700 2.22 1,492 346 311 685 74 256 37 8 23 3 13 2 6 1 5 1 68
800 2.06 1,550 359 322 713 76 267 39 8 24 3 14 2 6 1 5 1 71
900 1.91 1,603 372 332 739 79 276 40 8 24 3 14 2 6 1 5 1 73
1,000 1.78 1,651 383 342 762 81 284 41 9 25 3 14 2 6 1 5 1 74
1,100 1.70 1,679 389 348 775 83 289 42 9 25 3 15 2 6 1 5 1 75
1,200 1.60 1,711 397 354 791 84 294 43 9 26 3 15 3 7 1 5 1 77
1,400 1.24 1,828 423 377 849 90 315 45 9 27 3 16 3 7 1 5 1 80
1,600 0.84 1,987 459 408 930 98 341 49 10 29 3 17 3 7 1 6 1 85
1,800 0.52 2,169 499 444 1,023 106 371 53 11 31 4 18 3 8 1 6 1 90
2,000 0.30 2,372 542 483 1,127 116 404 57 12 33 4 19 3 8 1 7 1 97
2,200 0.17 2,578 587 523 1,232 125 437 61 13 36 4 20 3 9 1 7 1 105
Critica.limited
ASX:
CRI
February
2026
20
Appendix C: Source Data for Peer Comparisons
The peer comparison is illustrative only and not intended to imply economic viability or equivalence.
Critica.limited
ASX:
CRI
February
2026
Project Company Resource Mt TREO (ppm) Stage Source
Barkly Transition Minerals
Inferred 40 2,100
Pre-Scoping
ASX Announcement. Barkly Rare Earths Completes Successful IPO. 30 January 2026.
ASX:BAK - Barkly Rare Earths Completes Successful IPO
Total 40 2,100
Cowalinya Heavy Rare Earths Limited
Inferred 159 870
Pre-Scoping
ASX Announcement. Five-Fold Increase in mineral resources to 159 Mt @ 870 ppm Total
Rare Earth Oxides at Cowalinya Project in Western Australia. 3 October 2023.
02720133.pdf
Total 159 870
Koppamurra Australian Rare Earths
Measured 0.7 813
Scoping Study
ASX Announcement. ASX Release. Significant Resource Expansion at Koppamurra. 30
September 2024. ASX:AR3 - Significant Resource Expansion at Koppamurra
Indicated 112 750
Inferred 123 747
Total 236 748
Mt. Ridley Mt. Ridley Mines
Inferred 168 1,201
Pre-Scoping
ASX Announcement. Significant Resource Expansion at Koppamurra. 30 September 2024.
ASX:AR3 - Significant Resource Expansion at Koppamurra
Total 168 1,201
North Stanmore Victory Metals
Indicated 55.0 1,029
Scoping Study
ASX Announcement. Updated MRE identifies HREO/TREO ratios up to 83%.
02976976.pdf
Inferred 265.6 374
Total 320.6 486
Salazar-Newmont-West Cobar West Cobar Metals
Indicated 44 1,229
Pre-Scoping
ASX Announcement. Major Resource Expansions at Salazar for REEs, TiO2 and Scandium.
8 October 2024. ea9172ff-a94.pdf
Inferred 186 1,166
Total 230 1,178
Splinter Rock OD6
Inferred 682 1,338
Scoping Study
ASX Announcement. Mineral Resource Estimate Doubles at Splinter Rock Rare Earth
Project. 29 May 2024. Mineral Resource Estimate Doubles at Splinter Rock - OD6 Metals Limited
(ASX:OD6) - Listcorp.
Total 682 1,338
Tower Krakatoa Resources
Indicated 40 824
Pre-Scoping
ASX Announcement. Krakatoa Delivers maiden mineral resource at tower rare earth
deposit. 21 November 2022. 02600437.pdf
Inferred 60 852
Total 101 840