One Critical Minerals Platform
Two Scoping Studies delivered
Two strategic Australian projects
Tungsten | Tin | Rare Earths + Yttrium | Gallium
This Presentation (Presentation) has been prepared by Critica Limited (CRI or the Company) and is
authorised by the Board of CRI. The information contained in this Presentation is a professional opinion
only. Certain information in this Presentation has been derived from third parties and though CRI has no
reason to believe that it is not accurate, reliable or complete, it has not been independently audited or
verified by CRI.
This Presentation contains general and background information about CRI’s current activities as at the
date of this Presentation and should not be considered to be comprehensive or to comprise all the
information that an investor should consider when making an investment decision. CRI is not responsible
for providing updated information and assumes no responsibility to do so. Recipients should conduct
their own investigations and perform their own analysis of the information, statements and opinions
contained and this Presentation should be read in conjunction with CRI’s other periodic and continuous
disclosure announcements lodged with the ASX.
This Presentation is for information purposes only. Neither this nor the information contained in it
constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of CRI
shares in any jurisdiction. This Presentation is not investment advice or a recommendation to acquire CRI
securities and has been prepared without taking into account the recipient's investment objectives,
financial circumstances or particular needs. Recipients should seek professional advice before deciding
if an investment is appropriate.
All securities transactions involve risks, which include (among others) the risk of adverse or
unanticipated market, financial or political developments.
To the fullest extent permitted by law, CRI, its officers, employees, related bodies corporate, agents and
advisers expressly disclaim, to the maximum extent permitted by law, all liabilities (however caused,
including negligence) in respect of, make no representations regarding, and take no responsibility for,
any part of this Presentation and make no representation or warranty as to the currency, accuracy,
reliability or completeness of any information, statements, opinions, conclusions or representations
contained in this Presentation. No responsibility for any errors or omissions from this arising out of
negligence or otherwise is accepted.
Any forward-looking statements and forward-looking information included in this Presentation involve
subjective judgment and analysis and are subject to uncertainties, risks and contingencies, many of
which are outside the control of, and may be unknown to, CRI. In particular, they speak only as of the
date of this Presentation, they assume the success of CRI’s strategies, and they are subject to
significant regulatory, business, competitive and economic uncertainties and risks. Actual future events
may vary materially from the forward-looking statements and forward-looking information and the
assumptions on which they are based. Recipients of this Presentation are cautioned to not place undue
reliance on such forward-looking statements and forward-looking information.
BASIS OF PREPARATION
The Mt Lindsay Scoping Study is a preliminary technical and economic study that is not sufficient to
support the estimation of Ore Reserves or to provide assurance of an economic development case. No
Ore Reserve has been declared. The Scoping Study cautionary statement, production target basis and
funding disclosure are set out in full on the following page and in the Company’s ASX announcement
dated 29 September 2026.
COMPETENT PERSONS STATEMENTS
The information in this Presentation that relates to exploration results including geology interpretation, data
preparation and data quality is based on work compiled by Dr. Stuart Owen who is a Member of the Australian
Institute of Geoscientists. Dr. Owen is a permanent employee of Critica Limited and has sufficient experience that
is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Dr. Owen consents to the inclusion in
the Presentation of the matters based on his information in the form and context in which they appear.
The information in this Presentation that relates to the Mineral Resource estimates for Mt Lindsay is based on,
and fairly represents, information and supporting documentation prepared by Dr. Stuart Owen who is a member
of the Australian Institute of Geoscientists. The information includes the mining and metallurgical assumptions
used in reporting the Mineral Resource. Dr. Owen has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a
Competent Person as defined in the 2012 Edition of the JORC Code. Dr Owen consents to the inclusion in the
Presentation of the matters based on his information in the form and context in which they appear.
The information in this Presentation that relates to previously reported Exploration Results and metallurgical test
work has been extracted from the Venture Minerals Limited ASX announcements “Record Breaking Drill
Intersection at Mount Lindsay - 147 metres @ 1.0% Tin” dated 16 December 2021 and “Pilot Scale Metallurgy
Confirms Excellent Recoveries at Mt Lindsay” dated 31 August 2012. Critica confirms that it is not aware of any
new information or data that materially affects the information included in those announcements and that the
form and context in which the Competent Person's findings are presented have not been materially modified from
those announcements.
The information in this Presentation that relates to the Mt Lindsay Mineral Resource estimate has been extracted
from the Company’s ASX announcement “Critica Updates Mt Lindsay Tin-Tungsten Mineral Resource to JORC
2012” dated 14 September 2026 (for which the Competent Person was Dr. Stuart Owen), and the information
relating to the Mt Lindsay Scoping Study has been extracted from the Company’s ASX announcement dated 29
September 2026. Critica confirms that it is not aware of any new information or data that materially affects the
information included in those announcements and that all material assumptions and technical parameters
underpinning the mineral resource estimates, financial forecasts and the production target continue to apply and
have not materially changed. Critica confirms that the form and context in which the Competent Person’s findings
have not been materially modified from the relevant announcement.
Copies of the announcements are available at www.asx.com.au (ASX: CRI) or www.critica.limited. The Scoping
Study technical work, including the underground mine design, mine schedule, processing flowsheet,
infrastructure concept and capital and operating cost estimates, was prepared by DRA Global.
Disclaimer Authorised by the Board of Critica Limited
critica.limited | ASX: CRI | October 2026 2
BASIS OF PREPARATION: JUPITER PROJECT
The Jupiter Scoping Study is a preliminary technical and economic study that is not sufficient to support
the estimation of Ore Reserves or to provide assurance of an economic development case. No Ore
Reserve has been declared. The Scoping Study cautionary statement, production target basis and
funding disclosure are set out in full in the Jupiter Scoping Study Cautionary Statement in this
Presentation and in the Company’s Jupiter Scoping Study ASX announcement dated 20 October 2026.
Competent Persons Statements: Jupiter Project
The information in this Presentation that relates to Exploration Results, geological interpretation, data
compilation and data quality for the Jupiter Project is based on information compiled by Dr Stuart Owen,
with Dr Natalee Bonnici contributing to the data compilation and data quality aspects of the Mineral
Resource work. Dr Owen and Dr Bonnici are employees of Critica Limited and act as joint Competent
Persons for their respective areas of responsibility. Dr Owen is a Member of the Australian Institute of
Geoscientists. Dr Bonnici is a Member of the Australian Institute of Geoscientists (Membership No.
11904). Both have sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to their respective activities, to qualify as Competent Persons as defined in the 2012
Edition of the JORC Code.
The information in this Presentation that relates to the Jupiter Mineral Resource Estimate is based on
information and supporting documentation prepared by Mr Rodney Brown of SRK Consulting
(Australasia) Pty Ltd. Mr Brown is a Member of the Australasian Institute of Mining and Metallurgy and
has sufficient relevant experience to qualify as a Competent Person under the JORC Code. Mr Brown is
responsible for the preparation of the resource models and Mineral Resource estimates. Dr Owen, Dr
Bonnici and Mr Brown consent to the inclusion of the matters based on their respective information in the
form and context in which they appear.
The information in this Presentation that relates to the Jupiter Mineral Resource Estimate and Jupiter
Scoping Study has been extracted from the Company’s ASX announcements “Jupiter Delivers First 160
Mt Indicated Mineral Resource” dated 12 October 2026 and the Jupiter Scoping Study announcement
dated 20 October 2026. Critica confirms that it is not aware of any new information or data that
materially affects the information included in those announcements and that all material assumptions
and technical parameters underpinning the Mineral Resource Estimate, production target and forecast
financial information continue to apply and have not materially changed. Critica confirms that the form
and context in which the Competent Persons’ findings are presented have not been materially modified
from the relevant announcements. The Jupiter Scoping Study technical work was prepared by Sedgman
Pty Limited, including specialist technical work undertaken by its subcontractors. Snowden Optiro
completed the mining Scoping Study, including the open-pit mine design and mine schedule.
Technical Statement: Sedgman
The information in this Presentation that relates to the Jupiter Scoping Study processing flowsheet,
infrastructure concept, capital and operating cost estimates and associated modifying factors is based
on technical work prepared by Sedgman Pty Limited, including specialist technical work undertaken by
its subcontractors. The relevant technical information has been reviewed and approved by Robert
Simmons, Manager, Project Development of Sedgman. Robert Simmons has sufficient experience
relevant to the assessment, development and study of mineral projects of this type and scale, including
the consideration of processing, infrastructure, capital and operating cost inputs and other modifying
factors at Scoping Study level, and consents to the inclusion in this Presentation of the matters based on
Sedgman’s work in the form and context in which they appear.
The Information in this presentation relates to previous exploration results and metallurgical results
extracted from the following ASX announcements:
• 20 October 2026 – Jupiter Scoping Study Defines Pathway to Development
• 12 October 2026 – Jupiter Delivers First 160Mt Indicated Mineral Resource
• July 2026 - Critica Confirms High-Grade Rare Earth Zones at Jupiter
• 27 May 2026 - Jupiter Pilot Plant Delivers 14x Rare Earth Upgrade
• 20 May 2026 - Critica Secures $300,000 MRIWA and RTCM Trailblazer Funding
• 18 May 2026 - Critica Produces 97% TREO Third MREO from Jupiter
• 5 May 2026 - Critica Appoints DRA Global for Mt Lindsay Underground Scoping Study
• 14 April 2026- Jupiter Pilot Plant Recovery Improves to 81% MagREO
• 16 February 2026 – Critica Produces First MREC from Jupiter at ANSTO
• 2 December 2025 – Second High-Grade MREP Shows Strong Magnet REE & Y Grades
• 17 November 2025 – Critica’s MREP Flowsheet Achieves 63% Gallium Leach Recovery
• 28 October 2025 – Jupiter Delivers First High Grade 84% TREO MREP
• 29 September 2025 – Consistent Bulk Sample Results Strengthen Jupiter Pathway
• 1 September 2025 - Critica to produce high-grade REE concentrate at pilot plant
• 26 August 2025 - ANSTO & Minutech engaged to produce first MREC from Jupiter
• 13 August 2025 – Jupiter Confirmed as Australia’s Largest MREO Clay Resource
• 16 July 2025 – Critica Advances Jupiter – Outstanding Magnet and HREO Grades
• 28 May 2025 – Critica Commences Bulk Metallurgical Testwork
• 5 May 2025 – Drilling Targets Restricted Heavy REE at Satellite Prospects
• 11 February 2025 – Jupiter Maiden Resource – Australia’s Largest Clay Hosted
• 23 January 2025 – First Pass Metallurgical Testwork Delivers 830% REE Upgrade
Critica confirms that it is not aware of any new information or data that materially affects the exploration
results and metallurgical results information included in those announcements and that the form and
context in which the Competent Person’s findings are presented have not been materially modified from
those announcements. The Competent Person for relevant exploration results and metallurgical results
in those announcements was Dr Stuart Owen. Copies of the announcements are available at
www.asx.com.au (ASX: CRI) or www.critica.limited.
Disclaimer (continued) Authorised by the Board of Critica Limited
critica.limited | ASX: CRI | October 2026 3
MT LINDSAY
TUNGSTEN + TIN
SCOPING STUDY
DELIVERED
A$1.0bn2
After-tax NPV₈
55.6%
After-tax IRR
STRONG ECONOMICS DEMONSTRATED
• Production Target ~92% Indicated Resources
• Strong NPV, IRR and rapid payback
• Advancing feasibility, offtake and partners
JUPITER
RARE EARTHS + Y + Ga
SCOPING STUDY
DELIVERED
A$2.0bn1
After-tax NPV₈
48.4%
After-tax IRR
STRONG ECONOMICS DEMONSTRATED
• Production Target ~97% Indicated Resources
• Strong NPV, IRR and rapid payback
• Advancing PFS, offtake and strategic partners
100% OWNED AUSTRALIAN ASSETS • STRATEGIC CRITICAL MINERALS • MULTIPLE NEAR-TERM CATALYSTS
¹ Jupiter Scoping Study: all Jupiter economic and development metrics are Scoping Study estimates. Refer Critica Limited ASX announcement “Jupiter Scoping Study Defines Pathway to Development” dated 20 October 2026; Mineral Resource
of 160Mt Indicated and 1.5Bt Inferred, for a total 1.7Bt at 1,700ppm TREO (1,000ppm TREO cut-off), refer ASX announcement “Jupiter Delivers First 160 Mt Indicated Mineral Resource” dated 12 October 2026. ² Mt Lindsay Scoping Study: all Mt
Lindsay economic and development metrics are Scoping Study estimates. Refer Critica Limited ASX announcement “Mt Lindsay Study Delivers Strong Tungsten and Tin Economics” dated 29 September 2026. Read with the Scoping Study
Cautionary Statements in this Presentation.
A$245m
Pre-production
capital
~1.9 YEAR PAYBACK ~2.0 YEAR PAYBACK
I N V E S T M E N T C A S E
The Critica Investment Case
Two 100%-owned Australian projects | ~A$3.0bn combined after-tax NPV₈
critica.limited | ASX: CRI | October 2026
A$556m
Pre-production
capital
4
THE SUPPLY PROBLEM
China dominates processing and
refining across the minerals
Critica is targeting.
~99% Gallium supply1
~90% Rare earth processing2
~80% Tungsten &
downstream1
~45% Refined tin supply3
DEMAND + DIVERSIFICATION
Strategic demand is broadening
across four major end markets.
DEFENCE Tungsten + magnet REEs
AI + DATA
CENTRES
Tin + rare earths
ADVANCED
MANUFACTURING
Tungsten + tin
ELECTRIFICATION Magnet rare earths
Rare earth supply needs to grow
materially by 2040, with new projects
required to diversify supply.2
CRITICA'S RESPONSE
Two Australian projects exposed
to the exact supply chains the
West is trying to secure.
JUPITER | WA
Rare earths • Yttrium • Gallium
1.7Bt Resource • 160Mt Indicated
Beneficiation + high-grade MREC/MREO
MT LINDSAY | TAS
Tungsten • Tin
Scoping Study • ~92% Indicated A$1.01bn
after-tax NPV₈ • 55.6% IRR
THE INVESTMENT THESIS: CONCENTRATED SUPPLY + STRATEGIC DEMAND + TWO AUSTRALIAN PROJECTS WITH
DISTINCT VALUE DRIVERS
Sources: ¹ USGS, Mineral Commodity Summaries 2026 / China Mineral Industry data. ² IEA, Global Critical Minerals Outlook 2026. ³ International Tin Association / Project Blue market estimates. ⁴ Reuters, “How obscure
yttrium became a global flashpoint”, 13 September 2026. Project data: Critica ASX announcements.
~93% Yttrium supply4
I N V E S T M E N T C A S E
Why Critica Matters Now
Critical mineral supply is concentrated. Demand is strategic. New Western supply is required.
critica.limited | ASX: CRI | October 2026 5
COMMODITY MARKETS ARE RESPONDING
Three price signals reinforce the strategic-demand
story.
RARE EARTHS (NdPr) ~1.8× since January 20264
Policy support + tightening supply
TUNGSTEN (WO₃) ~6.5× year on year5
Export controls + defence / industrial demand
TIN (Sn) ~3× from 2022 lows6
Supply disruption + AI / data-centre demand
Not a single-commodity thesis.
Critica has exposure across multiple minerals and multiple end markets.
POLICY SUPPORT + TIGHTER SUPPLY + STRONGER PRICING = A MORE SUPPORTIVE BACKDROP FOR CRITICA
Sources: ¹ US–Australia Framework for Securing Supply in Critical Minerals and Rare Earths, Oct 2025; ² Australian Government, Critical Minerals Strategic Reserve, Jan 2026; ³ Chinese critical-mineral export control announcements, 2023–25;
⁴ SMM NdPr oxide market data, Sep 2026; ⁵ Argus/Fastmarkets European APT market data, Sep 2025–Sep 2026; ⁶ LME tin cash settlement data, Oct 2022–Sep 2026.
POLICY IS MOVING FROM WORDS TO ACTION
Governments are increasingly acting to secure
critical-mineral supply chains.
US +
AUSTRALIA
Critical minerals supply framework1
Financing • offtake • permitting • potential price-
support mechanisms
AUSTRALIA A$1.2bn Strategic Reserve2
Rare earths and gallium among the initial priority
minerals
CHINA
Export controls have changed the
market3
Rare earths, gallium and tungsten increasingly
subject to strategic trade controls
Governments are no longer just identifying critical minerals;
they are actively intervening to secure supply.
I N V E S T M E N T C A S E
Policy and Prices Are Re-Rating Critical Minerals
Government intervention is accelerating as strategic supply constraints support stronger commodity pricing
critica.limited | ASX: CRI | October 2026 6
ONE PLATFORM • TWO PROJECTS • COMPLEMENTARY VALUE DRIVERS • MULTIPLE CATALYSTS
Mt Lindsay: figures are Scoping Study estimates (ASX, 29 September 2026). Jupiter: figures are Scoping Study estimates (ASX, 20 October 2026); Mineral Resource of 160Mt Indicated and 1.5Bt Inferred, for a total 1.7Bt
at 1,700ppm TREO (1,000ppm TREO cut-off), refer ASX announcement “Jupiter Delivers First 160 Mt Indicated Mineral Resource” dated 12 October 2026. Scoping Study estimates are preliminary and subject to
uncertainty; development of each project remains subject to further studies, approvals, financing and a future Board decision.
WHAT EACH PROJECT CONTRIBUTES
MT LINDSAY
FIRST TO DEVELOP
Tungsten + tin • Tasmania
Scoping Study delivered → DFS / offtake / strategic partners
JUPITER
SCALE + ECONOMICS
Rare earths + Y + Ga • Western Australia
Scoping Study delivered → PFS / offtake / partners
THE CRITICA PLATFORM
100% OWNED • AUSTRALIAN JURISDICTIONS • COMPLEMENTARY
CRITICAL MINERALS • ONE PLATFORM
I N V E S T M E N T C A S E
One Platform, Two Strategic Australian Projects
Two complementary Australian projects. One critical minerals platform
critica.limited | ASX: CRI | October 2026 7
S E C T I O N 0 1
Mt Lindsay Project
“One of Australia’s largest undeveloped tungsten & tin resources”
Tungsten | Tin | North-west Tasmania
critica.limited | ASX: CRI | October 2026 8
Base Case Scoping Study figures prepared by DRA Global; refer ASX announcement 29 September 2026 and read with the cautionary statement and material assumptions in that announcement. NPV at an 8% discount rate; corporate tax rate
30%. Concentrate payabilities assumed at 94% tin, 80% tungsten and 100% magnetite. Capital and operating cost estimates carry a Scoping Study accuracy range of approximately −25% to +50%. No Ore Reserve has been declared and there
is no certainty the production target or forecast financial information will be realised.
KEY SCOPING STUDY METRICS
A$1.4bn
Pre-tax NPV (8%)
A$1.0bn
After-tax NPV (8%)
55.6%
After-tax IRR
~1.9 yrs
Payback
A$3.11bn
LOM EBITDA
A$5.20bn
LOM sales revenue
KEY FINANCIAL ASSUMPTIONS: BASE CASE
Production target basis
1Mt average LOM run-rate
~92% Indicated and ~8% Inferred Mineral
Resources, after mining modifying factors.
Study author
A$245m
Pre-production capital
4.1x
After-tax NPV /
pre-prod capital
Assumption Base Case
Tin price US$45,000/t
Tungsten APT price US$2,500/mtu
Magnetite concentrate (65% Fe) US$115/dmt
Exchange rate (AUD:USD) 0.65
Discount rate 8%
Corporate tax rate 30%
A$2.67bn
Pre-tax LOM free cash flow
A$1.92bn
After-tax LOM free cash flow
US$314/mtu
Indicative tungsten operating cost*
*After tin and magnetite by-product credits; derived non-
IFRS measure, not C1 or AISC.
M T L I N D S A Y P R O J E C T
The Economics Speak for Themselves
Mt Lindsay is one of the largest undeveloped tungsten–tin assets in a Tier 1 jurisdiction
critica.limited | ASX: CRI | October 2026 9
TUNGSTEN APT
US$2,500/mtu
SEPTEMBER BENCHMARK
US$3,000/mtu
~17% BELOW REFERENCED BENCHMARK
Concentrated mining and refining; strategic interest in
secure, non-Chinese supply.
Argus/Fastmarkets European APT market data, 1 Sep 2026
TIN
SCOPING STUDY BASE CASE
US$45,000/t
SEPTEMBER BENCHMARK
US$54,725/t
~18% BELOW REFERENCED BENCHMARK
Electronics and electrification demand alongside
constrained, exposed supply.
LME cash settlement, 1 Sep 2026
The assumptions are long-term assessment prices - not an extrapolation of current spot prices.
They reflect Critica’s view that structural supply constraints and strategic demand support longer-term pricing.
Source: Mt Lindsay Scoping Study, Commodity Price Assumptions. Mt Lindsay produces scheelite and tin concentrates; modelled revenue applies 80% tungsten and 94% tin payabilities, plus transport and selling costs. Benchmarks are dated
market references, not forecasts.
SCOPING STUDY BASE CASE
M T L I N D S A Y P R O J E C T
Concentrated Supply Is Driving a Structural Repricing
Scoping Study economics underpinned by Base Case prices below September 2026 benchmarks
critica.limited | ASX: CRI | October 2026 10
Distance to the Port of Burnie per the Mt Lindsay Scoping Study (ASX announcement 29 September 2026). Tasmania’s electricity generation is predominantly hydroelectric; the Scoping Study assumes grid power as the primary electricity
supply, with connection capacity and commercial terms subject to confirmation. Named nearby operations are third-party mines cited for regional context only.
100% ownership and granted Mining
Lease
Established project ownership and mining tenure
Established Mineral Resource
More than 88,000m of diamond drilling and
extensive technical work
Established mining district
Located near operating mines and established
mining services
Existing infrastructure and access
Road access, nearby power infrastructure and
regional rail
Established export infrastructure
Port of Burnie approximately 120 km by road
100%
Ownership and granted Mining
Lease
88,000m
Diamond drilling completed
Hydro
Predominantly renewable
Tasmanian grid
120km
By road to Port of Burnie
~ 120km
M T L I N D S A Y P R O J E C T
Strong Foundations for Development
Key foundations already in place to advance Mt Lindsay towards a DFS
critica.limited | ASX: CRI | October 2026 11
PLAN VIEW OF THE MAIN AND NO.2 MINERALISED SYSTEMS
14.3 Mt ~32 kt
~23 kt ~92%
Main and No. 2
Mineral Resource
Production target
from Indicated
Mineral Resources
Contained WO₃
Contained tin
Supported by more than 88,000 m of
diamond drilling
Additional Mineral Resources lie
outside the current Scoping Study
focus, providing opportunities for
further evaluation
M T L I N D S A Y P R O J E C T
An Established Resource Underpins Development
The Main and No. 2 deposits represent 75% of Mt Lindsay’s total Mineral Resource
critica.limited | ASX: CRI | October 2026 12
*Conceptual arrangement of the Mt Lindsay underground development showing the Main Skarn and No. 2 Skarn mineralised systems beneath surface, underground access from the existing HEC Quarry area, and the relationship to the
proposed conveyor, processing plant, tailings storage and existing infrastructure. The concept illustrates how underground mine access and surface infrastructure are being considered together to maximise the use of existing disturbed areas
and minimise new surface disturbance. Final locations and configurations remain subject to further engineering, environmental assessment and regulatory approvals. Refer ASX announcement 29 September 2026.
Defined underground access
Proposed decline from a portal within the
existing HEC quarry
Integrated site layout
Underground conveyor connecting the mine
to the proposed processing plant,
approximately 600 m from the portal
Designed Around Existing
Disturbance
Proposed infrastructure designed around
existing disturbed areas, with potential
underground tailings backfill.
1.0 Mtpa
Proposed mining rate
13.5 years
Mining schedule
11.6 years
Processing life
10.9 Mt
Material processed
M T L I N D S A Y P R O J E C T
A Defined Underground Mining Concept
A 1.0 Mtpa underground operation leveraging existing infrastructure
critica.limited | ASX: CRI | October 2026 13
A$244.5m
Pre-production capital
A$197.3m
Sustaining capital + closure
A$441.8m
Total LOM capital
4.1x
After-tax NPV / pre-prod
capital
Capital estimates from the Mt Lindsay Scoping Study (DRA Global), at Scoping Study accuracy of approximately −25% to +50%. Excludes working capital and financing costs. Refer ASX announcement 29 September 2026.
PRE-PRODUCTION CAPITAL TOTAL LIFE-OF-MINE CAPITAL
A$244.5m A$441.8m
Mine
development
A$122.0m
Processing &
infrastructure
A$94.0m
Contingency A$28.5m
Pre-production A$244.5m
Sustaining capital A$177.3m
Mine closure A$20.0m
M T L I N D S A Y P R O J E C T
A$244.5m to Production | Strong Capital Efficiency
After-tax NPV of 4.1 times pre-production capital
critica.limited | ASX: CRI | October 2026 14
2026
H1 H2
2027
H1 H2
2028
H1 H2
2029
H1 H2
Scoping Study Definitive Feasibility Study (18 months)
Environmental Assessment and Permitting (parallel)
Construction, Commissioning and Ramp-up
Final Investment
Decision (FID)
mid-2028
First Production
end 2029
1 Definitive Feasibility Study
H2 2026 – H1 2028
• Optimise design, costs and
schedule
• Advance offtake and financing
discussions
• Refine environmental and social
studies
2 Progress permitting
2026 – 2028 (parallel)
• Environmental impact
assessment
• Progress key approvals
• Stakeholder and community
engagement
3 Final Investment Decision
Mid-2028
• Subject to DFS outcomes,
approvals and funding
4 Construction and ramp-up
H2 2028 – 2029
• Indicative construction period
• Commissioning and
operational readiness
• First production targeted end
2029
Indicative development pathway only. Timing is subject to further studies, engineering, environmental and regulatory approvals, product qualification, commercial outcomes, funding and a future Board decision to proceed. Refer to Mt Lindsay
Scoping Study announcement, 29 September 2026.
M T L I N D S A Y P R O J E C T
From Scoping Study to First Production
Indicative development pathway targeting first production end-2029
critica.limited | ASX: CRI | October 2026 15
S E C T I O N 0 2
Jupiter Project
“Australia’s largest clay-hosted rare earth deposit”
Rare Earths | Yttrium | Gallium | Western Australia
critica.limited | ASX: CRI | October 2026 16
KEY SCOPING STUDY METRICS
A$2.7bn
Pre-tax NPV (8%)
A$2.0bn
After-tax NPV (8%)
48.4%
After-tax IRR
A$556m
Pre-production capital
~2.0 yrs
Payback
A$6.25bn
LOM EBITDA
A$12.27bn
LOM sales revenue
3.6x
After-tax NPV / pre-
prod capex
A$5.64bn
Pre-tax LOM free cash flow
A$4.20bn
After-tax LOM free cash flow
A$30,150/t
AISC per tonne MREC
KEY FINANCIAL ASSUMPTIONS (BASE CASE)
Assumption Base Case
Gross MREC basket price US$52.80/kg MREC
MREC payability 75%
Exchange rate (AUD:USD) 0.65
Discount rate 8%
Corporate tax rate 30%
Total royalties (% of revenue) 3.5%
Critical Minerals Production
Tax Incentive (CMPTI)
10%
Production target basis
Study author
8 Mtpa nominal throughput
107.3 Mt Production Target
97% Indicated | 3% Inferred
Base Case Scoping Study figures led by Sedgman; refer to the Jupiter Scoping Study ASX announcement and read with the cautionary statement and material assumptions. NPV at an 8% discount rate; corporate tax rate 30%; MREC payability
75%; AUD:USD 0.65; royalties 3.5% of revenue; Critical Minerals Production Tax Incentive 10%. Capital and operating cost estimates are Scoping Study estimates with accuracy of approximately ±35%. No Ore Reserve has been declared.
J U P I T E R P R O J E C T
The Economics Speak for Themselves
Compelling economics from one of the world’s largest clay-hosted rare earth resources
critica.limited | ASX: CRI | October 2026 17
Base Case pricing is independently forecast, product-specific and discounted for commercial payability
Source: Argus Rare Earths Analysis Data, May 2026; Critica Jupiter Scoping Study. Actual realised pricing and payability will depend on final product composition and specification, customer qualification, prevailing market conditions and
negotiated commercial terms.
J U P I T E R P R O J E C T
Long-Term Pricing Underpins the Base Case
Independent Argus forecasts | Product-specific basket | 75% payability | Se