Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
Wednesday, 31 January 2024
December 2023 Quarterly Activities Report
HIGHLIGHTS
Brothers REE Project (including the clay hosted Jupiter Rare Earths prospect), Western Australia
•
Identification of a new large REE target named the “Jupiter Prospect” at the Brothers
Project. The target is defined by a coincident gravity and magnetic anomaly extending over
40 km2 which hosts extensive REE rich clays with results up to 3,969 ppm TREO (ASX
announcement 9 November 2023).
• Venture received outstanding assay results including over 7,000 ppm TREO from the maiden
•
Reverse Circulation (“RC”) drilling program at the new Jupiter REE Target.
Consistent 20-30 metre (m) widths of REE mineralisation grading over 2,000 ppm TREO
within broader zones up to 64 m grading over 1,000 ppm TREO (ASX announcement 29 November
2023).
•
•
•
The Jupiter Stage One Resource definition drill program was completed during the quarter
with 82 holes drilled for 5,052 m on a 1000 m x 500 m spaced pattern across the 40 km2 target.
The final drill program consisted of 30 Aircore (“AC”) drill holes completed for 1,803 m and 52
RC holes completed for 3,249 m designed to supplement the previous high-grade clay hosted
REE drilling results within the Jupiter target.
Maiden Clay Hosted REE estimation for Jupiter to be completed later this quarter (Q1 2024). A
total of 2,070 drill samples from this drill program were submitted for REE analyses in late
December 2023 with assay results expected in the coming weeks.
Riley Iron Ore Mine
•
Announced post quarter end the appointment of Argonaut PCF as advisor on the Riley Iron
Ore Mine to undertake a strategic review of the asset.
Corporate
•
•
•
•
Cash Position of $2.0 million as at 31 December 2023.
Completion of $1.95 million (before costs) capital raising
Appointment of Philippa Leggat as Independent Non-Executive Director and commencement
of process to search for new company Chair.
R&D Claim for 2023 in the process of being finalised with announcement expected ahead of
next quarter, which will provide additional funding.
Venture Minerals Limited | ASX: VMS/VMSO
Level 2, 16 Altona Street, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
ASX: VMS
Brothers REE Project (including the clay hosted Jupiter Rare Earths prospect),
Western Australia
Introduction
Venture currently holds a significant tenement package of 1,103km2 of prospective Rare Earths Elements
(“REE”) tenure (Brother’s Project - 992.4 km2 and Bandy Project - 110.9 km2) in Western Australia
following the company’s strategy to expand its exposure to the Rare Earth Element space, with a
particular focus on the clay hosted REE mineralisation type.
The Company initially acquired (through the tenement application process) a 100% owned 511 km2
tenement package less than 10kms away from the Very High Grade REE target discovered at the Vulcan
prospect within the Golden Grove North project (Refer to Figures 3 & 13, and ASX announcement 18 April 2023). This
new REE project is named “Brothers” and is highlighted by a high grade 7 element (Ce, Eu, La, Sm, Tm,
Y & Yb) REE laterite soil result of 1,864 ppm combined REE (the third highest result from the Laterite
Geochemical Database for the Western Yilgarn Craton of Western Australia1) amongst other higher
values and is located close to a historic government co-funded, through the Western Australian
Exploration Incentive Scheme (“EIS”), RC drill hole that intersected 4 meters @ 2,103 ppm TREO2 within
clays) (Refer to ASX announcement 1 August 2023).
In May 2023, Venture signed a JV agreement to earn into a REE project (known as the Iron Duke Project),
which hosts two shallow historic drillholes, both of which have broad, high grade intersections of TREO 3.
Iron Duke is located immediately south of the recently acquired Brothers REE project and contains
numerous high priority REE targets for immediate drill testing (Refer to ASX announcement 18 May 2023). The
Company pegged an additional 429 km2 tenement package adjacent to Brothers and Iron Duke, bringing
the total combined project area named the Greater Brothers Project (Brothers including Iron Duke) up to
1,091 km2 (Refer to ASX announcement 18 May 2023). The Company then pegged a further 75 km2 tenement
package prospective for clay hosted REE mineralisation adjacent to the Brothers Project, bringing the
total project area up to 1,165 km2 of prospective REE tenure. The total Brothers (simplified back from
Greater Brothers) tenement package was rationalised down to 992.4 km2 during the December 2023
quarter.
The Company also acquired a 100% owned 809 km2 tenement package and named this new REE project
“Bandy”, which is highlighted by a high grade 7 element (Ce, Eu, La, Sm, Tm, Y & Yb) REE laterite soil
anomaly of 2,704 ppm (from the Laterite Geochemical Database for the Western Yilgarn Craton of
Western Australia1) amongst other higher values, this high grade combined REE result is the highest
combined REE value returned from that complete surface sampling program (Refer to ASX announcement 18
April 2023). Post the Maiden Drilling Program results (Refer to ASX announcement 1 August 2023) the Bandy
tenement package was reduced to 110.9 km2 during the December 2023 quarter.
Activities during the December Quarter
Venture received results from recently completed gravity and magnetic surveys over the Brothers REE
Project (Refer to Figures 1 & 2). The geophysical surveys delineated a 40 square kilometre REE target (named
the “Jupiter Prospect”) (Refer to Figures 1 & 2) interpreted to represent a deeply weathered alkaline intrusion
beneath the extensive clay hosted REE mineralisation previously encountered in reconnaissance AC
drilling (Refer to ASX announcement 1 August 2023).
1.
2.
3.
Geological Survey of Western Australia Record 2007/9- Laterite Geochemical Database for the Western Yilgarn Craton of Western
Australia by M. Cornelius, I. D. M. Robertson, A. J. Cornelius and P. A. Morris.
https://geodocs.dmirs.wa.gov.au/Web/documentlist/10/Report_Ref/A123326
TREO represents the sum of 14 Rare Earth Elements excluding Promethium plus Yttrium expressed as oxides.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 2
2
Figure 1 | Jupiter 40 sq.km target showing RC Drill Intersection Highlights of clay hosted REE
mineralisation on gravity from drill program as announced 29 November 2023.
The Company has also received the first batch of one metre split samples from the previously announced
reconnaissance AC drilling program, including one metre splits for drill hole BRAC036 from the Jupiter
target as reported here. The splits for BRAC036 confirm the high tenor and thickness of the clay hosted
REE mineralisation at the Jupiter target (Refer to ASX announcement 9 November 2023):
•
BRAC036 28 metres (m) @ 2,246 ppm TREO (23% MREO1) from 37 m to end of hole,
including
11 m @ 3,008 ppm TREO (23% MREO) from 41 m
1.MREO represents the sum of the Neodymium, Praseodymium, Dysprosium and Terbium expressed as oxides.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 3
3
Assaying of split samples from the remaining reconnaissance drilling at Jupiter are pending, intersections
based on initial five metre composite sampling also indicate broad zones of high tenor clay hosted REE
mineralisation including:
•
BRAC037 40 m @ 1,832 ppm TREO (24% MREO) from 25 m to end of hole, including
10 m @ 2,725 ppm TREO (22% MREO) from 30 m.
•
BRAC039 42 m @ 1,619 ppm TREO (25% MREO) from 5 m to end of hole, including
10 m @ 2,595 ppm TREO (26% MREO) from 30 m.
Note: BRAC036 intersection is largely based on one metre split samples as reported here, BRAC037, BRAC038 & BRAC039
intersections remain incompletely split (assays pending) and are as previously announced.
Figure 2 | Brothers Project combined granted tenure on regional geology with total magnetic intensity
image highlighting large interpreted alkaline intrusion & clay hosted REE mineralisation at Jupiter.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 4
4
Figure 3 | Location Map of the Brothers REE Project with the Jupiter Target, in Western Australia.
Brothers is well located in regional Western Australia (Refer to Figure 3) away from any significant population
centres but close to infrastructure with a nearby bitumen highway and gas pipeline on route to the major
port of Geraldton 300km away. Brothers is also only ~250 kms from Iluka’s Eneabba Rare Earths Refinery
to be in production in 2025 (Refer to ASX: ILU announcement “Eneabba Rare Earths Refinery – Final Investment Decision” 3
April 2022) and only ~520 kms from Lynas Rare Earths currently operating Mount Weld Concentrator.
As part of Iluka Resources Limited’s decision to build the Eneabba Rare Earths Refinery it had reached
an agreement of a risk sharing arrangement with the Australian Government, including a non-recourse
loan of $1,050 million plus a $200 million cost overrun facility under the Australian Government’s $2 billion
Critical Minerals Facility, administered by Export Finance Australia. Iluka’s close collaboration with the
Australian Government reflects the alignment of their commercial objectives for its rare earths business
with the Commonwealth’s Critical Minerals Strategy.
Lynas is currently commissioning its new Rare Earths Processing Facility in Kalgoorlie, on 22 July 2021,
it announced that it was awarded a $14.8 million grant as part of the Australian government’s Modern
Manufacturing Initiative’s Manufacturing Translation Stream for Resources Technology and Critical
Minerals Processing. The grant was given to enable Lynas to commercialise an industry-first Rare Earth
carbonate refining process. In addition, Lynas announced on the 3 August 2022 an ~$500m project to
expand capacity at the Mount Weld mine and concentration plant to meet accelerating market demand
for rare earth materials. The combined project clearly supports the Australian Government’s Critical
Minerals Strategy and the Western Australian Government’s Battery and Critical Minerals Strategy.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 5
5
The substantial co-investment by two of Australia’s major mining companies with the Australian
Government into the Rare Earths industry within the same region of Western Australia that Venture’s
Brothers Project sits put it in an enviable position and provides the Company with significant commercial
advantages should the project move towards development.
This recent exploration work at Brothers has seen Venture meet its expenditure requirements of the first
stage of the Iron Duke JV into the tenements covering the Jupiter Prospect. Venture has already earned
51% interest in the prospect and is now moving to the second stage of the earn-in by spending a further
$500,000 within the next 24 months to earn 70% of the two tenements.
Later in the quarter, the Company received outstanding assay results including over 7,000 ppm TREO
from the maiden RC drilling program at the new Jupiter REE Target at the Brothers Project.
The RC drill program consisted of two traverses across the large, 40 square kilometre, clay hosted REE
and alkaline intrusion target, with assay results consistently delivering broad, high-grade zones of REE
mineralisation (Refer to Figure 1, Tables 1 & 2, and ASX announcement 29 November 2023).
Clay hosted REE mineralisation was intersected in all 25 drill holes (for 1,794 m) within the Jupiter target
confirming the target has significant grade and scale potential. The Company has committed to an ~5,000
m slimline RC drilling program on a grid suitable for resource definition, that commenced in late November
2023.
The previous Air Core reconnaissance drilling (Refer to ASX announcement 1 August 2023) and this RC drilling
demonstrate the presence of an extensive +2,000 ppm TREO core zone 20-30 m thick within the broader
+1,000 ppm TREO mineralised clay blanket of currently up to 64 m thickness (Refer to Tables 1 & 2, and ASX
announcement 29 November 2023). Diminished clay hosted REE intersections were only experienced where
fresh basement rock comes close to surface and clay thickness is minimal in the BRRC003-BRRC004BRRC005 area. The RC drilling also shows broad zones of REE mineralisation within the fresh basement,
such as BRAC024 20 m @ 1,125 ppm TREO from 52 m to end of hole (Refer to ASX announcement 29 November
2023), confirming potential for primary REE mineralisation within the 40 km2 geophysical target that is the
Jupiter prospect (Refer to Figures 1 & 2).
Table 1: Jupiter Drill Intersection Highlights (See Figure 1)
Hole No.
BBRC001
including
BBRC002
BBRC007
BBRC008
BBRC009
BBRC011
BBRC017
BBRC018
BBRC019
including
BBRC020
BBRC021
including
including
BBRC023
BBRC024
including
Intersection(m)
32
6
22
26
18
20
12
26
30
16
2
16
22
8
4
18
18
6
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
TREO (ppm)
2,120
4,017
2,214
2,117
2,110
2,152
2,059
2,019
2,284
2,394
7,367
2,051
1,928
3,168
4,427
2,075
1,647
2,659
Page |
Page 6
6
Table 2: Jupiter RC Drilling Intersections over 1,000 ppm TREO (See Figure 4. All results are
for 2 m composites, refer to ASX announcement 29 November 2023 for full details):
Hole No.
BBRC001
including
BBRC002
including
BBRC007
including
BBRC008
including
BBRC009
including
BBRC011
including
BBRC012
including
BBRC013
including
BBRC017
including
BBRC018
including
BBRC019
including
including
BBRC020
including
BBRC021
including
including
BBRC023
including
BBRC024
including
Intersection(m)
32
6
38
22
36
26
18
10
36
20
28
12
42
10
42
6
64
26
60
30
32
16
2
42
16
22
8
4
48
18
18
6
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
TREO (ppm)
2,120
4,017
1,820
2,214
1,917
2,117
2,110
2.603
1,596
2,152
1,635
2,059
1,249
1,733
1,293
2,071
1,613
2,019
1,695
2,284
1,629
2,397
7,367
1,281
2,051
1,928
3,168
4,427
1,522
2,075
1,647
2,659
From (m)
30
30
24
38
24
28
36
36
8
24
14
18
24
30
30
48
18
30
24
48
22
26
36
24
38
30
42
42
38
42
36
42
Page |
Page 7
7
Figure 4 | Jupiter RC Drilling Intersections over 1,000 ppm TREO of clay hosted REE mineralisation on
total magnetic intensity (reduced to pole, NE sun) anomaly as defined by recent high resolution drone
magnetic surveying.
Post quarter end Venture announced that it has successfully completed the Stage One Resource
definition drill program at the large-scale, clay hosted Jupiter REE prospect at the Brothers Project
located in the Mid-West region of Western Australia. The completion of the program sees Venture
reaching the 70% expenditure milestone for the JV covering the 40 km2 target, with the Company now
forging ahead to 90% ownership (Refer to ASX announcement 9 May 2023 for JV details).
The Jupiter Stage One Resource definition drill program was completed late last year with 82 holes
drilled for 5,052 m on a 1000 m x 500 m spaced pattern across the 40 km 2 target. The final drill program
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 8
8
consisted of 30 AC drill holes completed for 1,803 m and 52 RC holes completed for 3,249 m. The drill
program was designed to supplement the previous high-grade clay hosted REE drilling results within the
Jupiter target (Refer to ASX announcements 1 August 2023, 9 November 2023 and 29 November 2023) and to increase the
level of confidence in the grade and scale of the mineralisation which will allow the Maiden Clay Hosted
REE estimation for Jupiter to be completed later this quarter. A total of 2,070 drill samples from this drill
program were submitted for REE analyses in late December 2023 with assay results expected shortly.
As standard Company practise, all sample intervals are checked in the field using a Portable XRF
machine for indications of REE mineralisation to determine which samples are submitted for analyses.
This methodology has been in place since drilling began at the Brothers Project (including the Jupiter
prospect), to minimise assaying costs and has proven to be successful guide to date to determine zones
of REE mineralisation.
For this Stage One Resource definition drill program at the Jupiter prospect, the Portable XRF field checks
indicated a vast majority of drill holes intersected broad consistent zones of clay hosted REE
mineralisation, which is consistent with the observations from the previous drilling programs at Jupiter.
Depending on assay results from the Stage One Resource definition drill program and mineralogical and
metallurgical testwork, a follow-up Stage Two Resource definition drill program is planned at Jupiter with
slimline RC drilling and possible AC drilling depending on drilling conditions and rig availability.
Riley Iron Ore Mine, North West Tasmania
The 100% owned Riley Iron Ore Mine (Riley DSO Hematite Project) is located 10 km from the Mount
Lindsay Deposit (Refer Figure 5) and occurs as a hematite rich pisolitic and cemented laterite. The deposit
is all at surface, located less than 2 km from a sealed road that accesses existing port facilities.
Activities during the December Quarter
Subsequent to quarter’s end, Venture engaged Argonaut PCF as advisor on the Riley Iron Ore Mine to
undertake a strategic review of the asset.
Argonaut PCF is a specialist natural resources advisor with leading expertise and a proven track record
of assisting metals and mining companies critically assess and optimise the value of assets.
The review follows the recent lapse of the offtake agreement with Prosperity Steel, which allows the
Company to now consider all options in relation to the future of the Riley Iron Ore Mine.
The strategic review will include an initial assessment of the project including a potential restart, joint
venture or an asset sale, focussing on delivering near term value for the Company and our shareholders.
Interest in the project from third parties including potential offtake and joint venture partners has increased
in recent months and whilst the iron ore price remains strong, the Company will consider the full range of
pathways to unlock the commercial value of the project for Venture shareholders.
The Company looks forward to providing an update on the review process as it progresses.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 9
9
Mount Lindsay Project, Tin-Tungsten, North West Tasmania
Introduction
The Mount Lindsay Project (178 km2) is located in north-western Tasmania (Refer Figure 5) within the contact
metamorphic aureole of the highly perspective Meredith Granite. The project sits between the world class
Renison Bell Tin Mine (Metals X Ltd/Yunnan Tin Group >230kt of tin metal produced since 1968) and the
Savage River Magnetite Mine (operating for >50 years, currently producing approximately 2.5 Mtpa of
iron pellets). Mount Lindsay has excellent access to existing infrastructure including hydropower, wind
power, water, sealed roads, rail and port facilities.
Venture owns 100% of the tenure that hosts both the Mount Lindsay Tin-Tungsten Deposit and all of the
surrounding prospects. Since 2007, Venture has completed circa 100 kilometres of diamond core drilling
at Mount Lindsay and defined JORC compliant Measured, Indicated and Inferred Resources (Refer to ASX
announcement 17 October 2012). The resource base at Mount Lindsay is hosted within two magnetite rich skarns
(Main Skarn and the No.2 Skarn) which extend over a total strike of 2.8 km and remain open at depth.
Additional indicated and inferred resources have been defined at the Reward and Stanley River South
Prospects, which extend over an additional 1.1 km of strike.
The Mount Lindsay Project (Refer Figures 5 & 6) is already classified by the Australian Government as a
Critical Minerals Project2 with an advanced Tin-Tungsten asset, which is significantly enhanced by the
recent discovery of two new skarn zones, one within the Renison Mine Sequence in the Mount Lindsay
area and the other along strike from Mount Lindsay’s main tin deposits (Refer to ASX announcement 27 September
2021). Mount Lindsay is one of the largest undeveloped tin projects in the world, containing in excess of
80,000 tonnes of tin metal (Refer ASX announcement 17 October 2012) and within the same mineralised body a
globally significant tungsten resource containing 3,200,000 mtu (metric tonne unit) 1 of WO3. The
Australian Government is supporting the Critical Minerals Sector through several initiatives including the
establishment of a A$2 billion finance facility announced in September 2021 to be administered by Export
Finance Australia which Venture is working to access for the project.
In October 2023, the Government announced a A$2 billion expansion of the Critical Minerals Facility,
bringing the total financing available under the Facility to A$4 billion. Further, in December 2023, the
Australian Government updated its Critical Minerals List and introduced a new Strategic Materials List,
(including Tin) recognising the importance of certain materials in the global transition to net zero and in
broader strategic applications2.
Tin is now recognised as a fundamental metal to the battery revolution and new technology. The
International Tin Association recently stated “As the awareness of tin’s importance grows, so too will the
need to secure supply. The organisation highlighted the scale of new investment required to meet the
expected surge in demand. It estimates that $1.4 billion is needed to deliver 50,000 tpa more tin by 2030”
(world tin consumption was 380,600t in 20223).
1. Generally quoted as US dollars per mtu of tungsten trioxide (WO3).
2. Refer to ‘Australian Critical Minerals Prospectus’ report prepared by the Australian Government represented by the Australian
Trade and Investment Commission (Austrade) and Geoscience Australia, January 2024.
3. DATA: International Tin Association
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 10
10
Figure 5 | Location Map for Mount Lindsay Tin-Tungsten Deposit, Riley Iron Ore Mine &
Livingstone DSO Deposit
Activities during the December Quarter
Studies – Tin and Boron
In the September 2023 Quarter, Venture engaged Curtin University to commence the next stage of
metallurgical test work on the Mount Lindsay tin-rich borates. This program will follow on from the stage
1 work successfully completed by CSIRO.
The program will investigate the extraction of tin, boron, and iron from tin-iron borates, potentially
significantly increasing the tin recovery and producing a high value boron by-product resulting in another
revenue stream to the Mount Lindsay project.
Venture believes the inclusion of tin-rich borates into the current underground feasibility studies could
deliver a major economic benefit to the study through the recovery of boron and additional tin and iron
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 11
11
from the tailings circuit of the current processing flowsheet, which has the economic advantage of already
been mined and processed.
During the quarter, the work program commenced with testwork activities scheduled to ramp up in the
next quarter. The Company looks forward to delivering results from this testwork within the coming
months.
Curtin University has been named the first of Australia’s Trailblazer universities to receive a share of more
than $242 million in federal government funding, to develop a research commercialisation hub to turn
research outputs into breakthrough services, products and businesses. Curtin is leading the Resources
Technology and Critical Minerals Trailblazer hub which is part of the recently announced Federal
Government’s Trailblazer Universities Program.
Venture’s recent study work identified the potential for additional, large-scale quantities of tin and boron
throughout the greater Mount Lindsay skarn system (Refer Figures 6). The tin-boron zones are in the form of
borate minerals and have not previously been assessed in any mining studies at Mount Lindsay. The
borate minerals containing a large amount of Boron, a critical mineral in the solar panel industry, not only
occur within the current Mount Lindsay resource base (Refer Figure 6), but also occur extensively throughout
the numerous skarns surrounding the Company’s current tin-tungsten deposits. The quantum of Boron
within the Mount Lindsay deposits, and surrounding exploration Targets areas can be highlighted by the
drill intersections released in Venture’s ASX Announcement dated 13 April 2023.
The Mount Lindsay deposits, and the surrounding exploration target areas are all defined as skarn style
mineralisation and are closely analogous to well-known large skarn deposits in Russia and China, which
contain the same borates that exist at Mount Lindsay. The CSIRO study confirmed that both China and
Russia commercially extract large volumes of boron and iron from these deposits, initial testwork by
CSIRO returned results suggesting the recovery of tin from the borates was commercially possible.
Boron is now included in the European Commission’s Critical Raw Materials Act and is considered vital
to the green energy transition. In addition to boron’s use in solar panels, up to 50kg of boron material is
required in the construction of Electric Vehicles. Currently Australia does not produce boron, but instead
relies on supply from large producers such as Turkey, which comes with potential disruption and the risk
of political instability.
Boron (Borates) is on the European Commission’s list of minerals to feed the green energy transition in
the recently released Critical Raw Materials Act (CRMA) and is also on Japan’s Critical Minerals list1, and
importantly is not produced in Australia. Over 80% of the World’s Boron is produced by two companies
Rio Tinto (Boron Mining Operations in California, USA since 1927) and Eti Maden AS (State owned
Enterprise of Turkey) which produce over 50%.Ioneer (ASX: INR, Market Cap of A$590 million as at 15
August 2023) is looking to develop Rhyolite Ridge Project in Nevada (INR released a JORC Total Mineral
Resource of 459.5 Million Tonnes @ 0.46%2 Boron on 31 October 2017), whilst 5E Advanced Materials
(ASX: 5EA, Market Cap of A$150 million as at 15 August 2023) is commissioning the plant for the Boron
Americas (Fort Cady) Complex in California (5EA released a JORC Total Mineral Resource of 120.4
Million Tonnes @ 2.02% Boron2 on 3 December 2018), both are being touted as a replacement for the
Rio Tinto USA based mine supply as the reserves diminish.
1.
2.
https://www.csis.org/analysis/geopolitics-critical-minerals-supply-chains
To covert B to B2O3 multiply by 3.218. To convert B2O3 to H3BO3 multiply by 1.776.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 12
12
Exploration
During the quarter a soil sampling program was completed over tin targets to the west of Mount Lindsay
with assays and field checks pending.
Final Assays from additional analyses are pending from SR001 which tested a Nickel Target defined by
a three kilometre long EM conductor supported by nickel in soil anomalism and interpreted to be within
the Wilson River Ultramafics (Refer to ASX announcement 15 February 2023).
Figure 6 | Mount Lindsay Project: Geology Map showing High Grade Tin-Tungsten Targets and Tin-Boron Skarns
*See Metals X Announcement “2023 Renison Mineral Resource Update”, 28 September 2023.
Venture Minerals Limited | ASX : VMS/ VMSO
Level 2,16 Altona St, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
Page |
Page 13
13
South West Project, Nickel-Copper-PGE, Western Australia (Chalice Earn-in at 51%)
Introduction
The South West Project contains the Thor and Odin Prospects within its tenement package (256 km²)
and is located ~240 km south of Perth, hosted within the Balingup Gneiss Complex. A joint venture
between Teck Cominco and BHP Billiton, first identified this area as being prospective for base and
precious metals hosted within the complex. The joint venture completed surface sampling and airborne
EM surveys which culminated in the discovery of a base and precious metals deposit (Kingsley Prospect)
which Teck identified as a meta-Volcanic Massive Sulfide (“VMS”) system in high grade metamorphic
rocks. Venture’s nearby Thor prospect hosts a strong an
Share your feedback
Discover