QUARTERLY REPORT – JUNE 2025
The Board of Critica Limited (Critica or the Company) is pleased to provide its Quarterly Activities Report for the three
months ending 30 June 2025.
HIGHLIGHTS
Jupiter Project (part of the broader Brothers Clay-Hosted Rare Earths Project)
Globally significant scale and quality
•
Australia’s largest clay-hosted REE Resource: 1.8 Bt @ 1,700 ppm TREO (Inferred), including 500 Mt @
2,200 ppm TREO.
•
Jupiter resource grade, size and thickness comparable to the world’s top clay-hosted rare earth deposits.
•
Clean metallurgy: Exceptionally low uranium and thorium content across the resource.
•
Strategic location proximate to established infrastructure and Rare Earth processing hubs, including
Lynas (Mt Weld) and Iluka (Eneabba).
Next stage of metallurgical testwork confirms outstanding beneficiated magnet and HREO grades
•
Beneficiation testwork on further Jupiter sample reduces potential leach feed by 95% and delivers 15,000
ppm (1.5%) Total Rare Earth Oxides (TREO) beneficiated material including:
o
3,990 ppm Magnet Rare Earth Oxides (MREO)
o
1,400 ppm Heavy Rare Earth Oxides (HREO)
o
5,200 ppm combined NdPr + HREO
•
Result delivers a strong foundation for more efficient downstream processing and transport economics
and strongly enhances the potential for a low-cost, low-impact REE processing operation at Jupiter.
•
Potential premium 67% Fe iron ore by-product from the REE beneficiation process.
•
Multiple metallurgical testwork streams ongoing, focussed on refining beneficiation processes and
production of beneficiated material suitable for leach testing and Mixed Rare Earth Carbonate (MREC)
production.
•
Jupiter resource model currently being optimised to prioritise key HREO-rich zones.
Approvals received for exploration drilling at satellite deposits
•
All requisite approvals received to commence drilling of key satellite prospects at the Brothers Project.
•
Comprehensive exploration drilling campaign planned to target the two key satellite prospects, Aurora
and Juno, following completion of a heritage survey.
•
EIS grant awarded from DEMIRS, expected to cover up to 50% of the planned drilling costs of this targeted
aircore campaign.
Corporate
•
Appointment of Mr Jacob Deysel as Critica’s Chief Executive Officer.
•
Farm-In Agreement entered with Ausgold Limited (ASX: AUC) having the right to earn up to a 70% interest
in the Kulin Gold Project by expending A$610,000 over a three-year period.
•
Received proceeds of A$1.05M from the ATO under the R&D Tax Incentive Program.
•
Cash of A$4.15million as at 30 June 2025.
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
1
ASX: CRI
Critica’s Chief Executive Officer, Jacob Deysel, commented:
Building on the robust exploration and technical milestones achieved in Q1 2025, Critica has continued to progress the
development of Jupiter as Australia’s next rare earths project of significance.
Our latest metallurgical results delivered a 94.5 % mass reduction, meaning only ~5 % of the original material proceeds to
downstream hydrometallurgy. This reduction does not represent a loss of product; instead, it concentrates the rare ‑earth
value into a much smaller beneficiated stream. The 95 % portion removed, expected, after optimisation, to contain only
immaterial Rare Earth content, is now being assessed for the potential recovery of premium-grade iron ore, offering a
compelling opportunity to transform this stream into a valuable byproduct. Turning this stream into saleable iron ore
underscores that the mass reduction, concentrates value while lowering leach‑feed volumes, shrinking the processing
footprint, cutting costs and tailings, and potentially adding an additional revenue source. Jupiter’s concentrate also contains
exceptionally low levels of uranium and thorium, simplifying approvals, avoiding radiation-related concerns, and opening
access to sensitive downstream markets in Japan, Korea, Europe and the U.S.
Importantly, Jupiter represents less than 3% of the total Brothers Project footprint yet already contains attractive levels of
high-value MREOs (Nd, Pr, Dy, Tb). We are now planning to test the broader district potential through exploration at Aurora
and Juno, two of the largest satellite targets. These zones have already returned discovery hits of up to 4,256 ppm TREO and
MREO/TREO ratios as high as 34 %. The intended aircore drilling programme will be 50 % co‑funded through an EIS grant
and will test whether these satellite areas host even richer rare‑earth concentrations or complementary metallurgical
profiles.
Critica’s value proposition is anchored in purpose, place, product, and process. We are advancing one of Australia’s most
strategically significant rare earths projects to meet the accelerating demand for critical minerals that underpin
decarbonisation, security, and advanced technologies. Based in Western Australia, a globally trusted, mining-aligned
jurisdiction. Our flagship Jupiter deposit is the country’s largest known clay-hosted REE resource. It combines scale, highgrade zones, and clean metallurgy. Critica is committed to progressing development in a responsible, technically credible,
and socially aligned way.
With a cash balance of A$4.2 million at 30 June 2025, Critica is well positioned to progress the next stage of project
definition at Jupiter and unlock further growth across the district. This is not just a resource—it is a platform for building one
of Australia’s most significant and sustainable sources of magnet rare earths.
OPERATIONAL ACTIVITIES
BROTHERS AND JUPITER
Critica’s flagship Brothers Clay-Hosted Rare Earth Project (Brothers) is a large strategic landholding totalling approximately
1,356 km2 of granted tenure, with an additional 435 km2 of licences under application, all situated on pastoral leases in
Western Australia.
The Jupiter Project (Jupiter) is a high-grade, clay-hosted rare earths deposit located within the broader Brothers landholding.
Jupiter is the first of six clay-hosted REE discoveries that the Critica team has made at Brothers. Discovered in late 2023
through geophysical targeting, Critica rapidly deployed cost-effective aircore drilling to advance Jupiter. The Company
successfully completed circa 40,000 metres of drilling there in less than 18 months.
To date, Jupiter boasts remarkably consistent rare earth mineralisation with broad, flat lying, high-grade zones of 20 to 30
metre widths, under low cover and grades of over 2,000 ppm of Total Rare Earth Oxides (TREO). These high-grade zones
typically occur within circa 80 metre zones of mineralisation that grade over 1,000 ppm TREO. The valuable magnet rare
earths (MREO) make up an average of 23 percent of the material which grades over 1,000 ppm TREO (by averaged assay
data). An additional stand-out feature is the consistently low presence of in-situ thorium and uranium.
Jupiter is strategically located within the Mt Magnet and Yalgoo mining district and enjoys exceptional development potential
being located adjacent to significant surrounding infrastructure. It is less than 10 km from the bitumen highway that runs
between Mt Magnet and Geraldton, providing easy access to local labour centres, the Port of Geraldton and the mid-west
gas pipeline that runs parallel to the highway.
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
2
ASX: CRI
In February 2025, Critica released a maiden Mineral Resource Estimate (MRE) for Jupiter containing a global resource of 1.8Bt
@ 1,700 ppm TREO, including a high-grade core of 500 Mt @ 2,200 ppm, making it Australia’s largest and highest-grade clayhosted rare earth resource.
The Jupiter MRE also includes over 280,000 tonnes of contained Heavy REEs. With this demonstrable potential to host globally
significant HREO zones, Critica is now optimising its resource model to prioritise these HREO-rich zones.
Notably, China’s rare earth export controls announced in early April 2025 in response to the US tariff trade war included new
controls targeting seven REEs, including the Heavy REEs which Jupiter contains (refer Table 1).
Table 1: Heavy Rare Earths in Jupiter Inferred Resource subject to China’s new export control laws.
JUPITER GLOBAL
INFERRED RESOURCE
JUPITER HIGH GRADE
RESOURCE (included)
1.782 BT @ 1651 ppm TREO (1,000
520 MT @ 2169 ppm TREO
ppm cutoff)
(1,800 ppm cutoff)
Samarium (Sm2O3)
Tonnes
73,062
Tonnes
27,560
Gadolinium (Gd2O3)
44,550
16,120
Terbium (Tb4O7)
5,346
2,080
Dysprosium (Dy2O3)
24,948
9,360
Lutetium (Lu2O3)
1,782
520
Yttrium (Y2O3)
131,868
46,800
RESTRICTED
RARE EARTHS
Included in Jupiter Resource
The recent successful beneficiation of the strategic, geopolitically important and high-value HREOs within Jupiter marks an
important step forward for the project. These results confirm Jupiter’s capacity to deliver a valuable mix of strategic rare earth
elements, including both light (Nd, Pr) and heavy (Dy, Tb) oxides, supporting its development as a significant contributor to the
magnet REE supply chain.
Figure 1: Jupiter Deposit and Brothers REE Project location map
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
3
ASX: CRI
Figure 2: Jupiter Deposit and satellite clay-hosted REE targets within the Brothers Project
Bulk Metallurgical Testwork Delivers Outstanding Magnet and Strategic HREO Grades
In May 2025, Critica commenced the next stage of metallurgical test work for Jupiter and dispatched a 400 kg bulk sample of
Jupiter material to the Centre of Science and Technology of Minerals and Environment (CSTME), Vietnam. The aim of this bulk
metallurgical testwork was to refine the beneficiation process and produce material for initial leach test work.
This beneficiation work follows on from the successful initial beneficiation work that achieved a greater than 9x Rare Earth
Element (REE) in-situ grade uplift (refer CRI ASX release dated 23 January 2025). This latest phase incorporated the full suite
of rare earth elements – including the first focused analysis of HREOs – and confirms the project’s ability to generate highquality, upgraded material using conventional, low-cost beneficiation.
Critica received additional support from Curtin University’s Resources Technology and Critical Minerals Trailblazer program.
Under this scheme, the Company submitted a second bulk sample to the WA School of Mines (Curtin University) to produce
additional beneficiated material for future leach test work.
Critica announced the results of this metallurgical testwork subsequent to end of the June quarter (refer CRI ASX release dated
16 July 2025). The results of this next stage of test work demonstrated the successful beneficiation of Jupiter’s clay-hosted
mineralisation through Wet Low Intensity Magnetic Separation (WLIMS) and froth flotation, producing a beneficiated grade
of 15,000 ppm (1.5%) TREO, including 1,400 ppm HREO and 5,200 ppm combined NdPr + HREO (refer Table 2) with a 95%
mass reduction.
This 95% mass reduction potentially results in only 5% or less of the original mass proceeding to leaching to extract REE
metals. This provides Critica with a significant competitive advantage potentially translating to lower operating costs and
capital expenditure, reduced environmental impact, faster permitting, and strong alignment with the Company’s ESG focus.
Ongoing metallurgical testwork continues to progress and will focus on refining beneficiation processes to maximise grade
and recoveries and producing beneficiated material suitable for leach testing and rare earth carbonate production. Additional
work is also assessing the potential production of premium iron ore from the REE processing stream.
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
4
ASX: CRI
Details of the Latest Metallurgical Results
Initial testwork demonstrated strong beneficiation potential using a simple, two-stage flowsheet. An early-stage, unoptimised
recovery of 45% was achieved using conventional Wet Low Intensity Magnetic Separation (WLIMS) followed by rougher froth
flotation - providing a solid baseline for further optimisation. The process delivered a significantly upgraded product grading:
•
15,000 ppm (1.5%) TREO
•
3,990 ppm MREO
•
1,400 ppm HREO
•
5,200 ppm combined NdPr + HREO
The 95% mass reduction strongly supports efficient downstream processing and transport economics. The WLIMS stage also
generated an iron-rich fraction grading 67% Fe, indicating potential for a premium iron ore by-product from the same
beneficiation stream. Critica will continue to assess and refine these opportunities as part of the REE bulk sample test
programs.
Exploration Drilling Targeting Key Satellite Prospects
In May 2025, Critica announced that it had received all requisite drilling approvals to commence testing of the key satellite
prospects at the Brothers Project.
Discovery drilling of these prospects last year identified particularly high levels of the heavy rare earths and returned assay
results of up to 34% Magnet Rare Earth Oxides (MREO/TREO) and overall grades of up to 8m @ 4,256ppm TREO, within
broader zones of clay hosted rare earth mineralisation (refer CRI ASX release dated 17 October 2024).
The two key satellite prospects, Aurora and Juno (refer Figure 2), were also noteworthy in hosting particularly elevated levels
of key heavy rare earths, including Dysprosium, Terbium and Yttrium, within several of the discovery holes. Critica is currently
planning a comprehensive exploration drilling campaign targeting these two large satellite prospects following the successful
completion of a heritage survey.
The Company has been awarded an Exploration Inventive Scheme (EIS) grant from the Department of Energy, Mines, Industry
Regulation and Safety (DEMIRS) in Western Australia, which is expected to cover up to 50% of the planned drilling costs of
this AC campaign.
CORPORATE
Board and Management Changes
On 22 May 2025, Critica advised that Managing Director Philippa Leggat had resigned as Managing Director.
Dr Stuart Owen, Critica’s Chief Geologist & Exploration Manager, assumed the role of interim Chief Executive Officer.
Additionally, Jamie Byrde, Critica’s Chief Financial Officer and Company Secretary, was appointed as an Executive Director to
support the transition.
Subsequent to the end of the June quarter, Critica appointed Mr Jacob Deysel as Chief Executive Officer (CEO). Mr Deysel
brings over 25 years of global mining leadership, having held senior executive positions at some of the world’s most recognised
mining companies. He was formerly CEO and Managing Director of ASX-listed Mineral Commodities Ltd (ASX: MRC). Jacob
has also held leadership roles at Newmont Corporation (NYSE: NEM) and was Vice President for South America at Uranium
Energy Corp (NYSE: UEC).
Dr Stuart Owen ceased in his capacity as Interim CEO following Jacob’s appointment.
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
5
ASX: CRI
Farm-In Secured with Ausgold for Kulin Gold Project
In June 2025, Critica entered into a Farm-In Agreement (Agreement) with Ausgold Limited (ASX: AUC) (Ausgold) with respect
to its Kulin Gold Project (Kulin Project).
The Kulin Project, comprising of exploration licence E70/5077, is located approximately 75km northeast of Ausgold’s 100%owned Katanning Gold Project.
The Agreement forms part of Critica’s strategy to focus its capital on the Company’s flagship Jupiter REE Project, whilst
reducing cash expenditure on non-core assets. The Agreement allows Critica shareholders to retain exposure to potential
upside in the Kulin Project up to a 30% joint venture interest (refer Agreement terms below).
Key Agreement Terms
Under the Agreement, Ausgold has the right to earn up to a 70% interest in the Kulin Project over three years by expending:
•
Stage 1: A$250,000 within 18 months to earn 51%; and
•
Stage 2: A further A$360,000 over the following 24 months to earn an additional 19%.
Upon completion of the earn-in, Critica will retain a 30% contributing interest in the Kulin Project, with the right to convert to a
1.5% net smelter royalty (NSR) at a decision to mine.
Mt Lindsay Tin-Tungsten Project
Critica offers exposure to one of the world’s largest undeveloped Tin and Tungsten Projects.
Mount Lindsay has a granted mining lease and in excess of 80,000 tones of tin metal and within the same mineralised body a
globally significant tungsten resource containing 3,200,000 metric tonne units of WO3 (Mount Lindsay) (refer to Table 5).
In 2022 The Australian Government recognized Tungsten as a critical minerals and Mount Lindsay was included in the Critical
Minerals Prospectus. Tungsten a highly durable and dense metal with a wide range of industrial and technological applications
including defence and aerospace industries.
Tin is a versatile metal with a wide range of applications due to its corrosion resistance, low toxicity and useful alloys. A critical
mineral for clean energy and battery technology uses.
No activities occurred during the quarter other than ongoing rehabilitation. A strategic review of the asset is ongoing.
Expiry of Listed Options
Critica advises that 346,851,760 quoted options exercisable at A$0.036 (ASX: CRIO) expired on 25 July 2025.
A$1.05 Million R&D Refund
On 28 April 2025, Critica advised it had received a refund payment of A$1.05 million from the Australian Taxation Office (ATO)
under the Research and Development (R&D) Tax Incentive Program for the financial year ended 30 June 2024. The company
is currently progressing the 30 June 2025 R&D tax incentive claim for the previous 12 months with the company’s tax advisors
to assist with future funding requirements.
Additional information required by ASX Listing Rule 5.3
Critica notes the following aggregate payments during the quarter:
•
A$0.6 million on exploration activities (refer to Item 1.2(a) of Appendix 5B), relating to drilling and activities,
tenement fees and rates, and geological staff costs (ASX Listing Rule 5.3.1); and
•
there were no mining or development activities during the quarter (ASX Listing Rule 5.3.2); and
•
A$0.3 million in aggregate of payments made to related parties or their associates (refer to Item 6.1 of Appendix 5B)
including (ASX Listing Rule 5.3.5): Directors’ fees, salaries and superannuation.
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
6
ASX: CRI
Authorised by the Board of Critica Limited.
Jacob Deysel
Chief Executive Officer
JOIN CRITICA’S INTERACTIVE INVESTOR HUB
Visit Critica Limited’s InvestorHub to sign up and engage with the Team
CONTACT US
Critica Limited
Level 2, 16 Altona Street, West Perth, Western Australia
T: + 61 8 6279 9428 | admin@critica.limited | www.critica.limited
ABOUT CRITICA LIMITED
Critica Limited (ASX: CRI) is a critical minerals company focused on developing the Jupiter Rare Earths Project in Western
Australia—Australia’s largest clay-hosted REE deposit, rich in high-value magnet elements (Nd, Pr, Dy, Tb) and supported by
clean metallurgy and low-impact development potential. With a clear path from resource to revenue, Critica is advancing Jupiter
through targeted drilling, beneficiation, and strategic alignment. The Company also holds the Mt Lindsay Project in Tasmania, a
long-life tin–tungsten asset.
COMPETENT PERSONS STATEMENTS
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by
Dr. Stuart Owen who is a Member of the Australian Institute of Geoscientists. Dr. Owen is a permanent employee of Critica
Limited and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr. Owen consents to the inclusion in the
report of the matters based on his information in the form and context in which they appear.
ESTIMATION AND REPORTING OF MINERAL RESOURCES – JUPITER PROJECT
No new Mineral Resource information is contained in this report. Information in this report which refers to Mineral Resources
for the Jupiter Project in Western Australia is taken from the company’s initial ASX disclosure dated 11 February 2025
“Jupiter Maiden Resource: Australia’s Largest and Highest Grade Clay Hosted Rare Earth Resource”, found at
www.critica.limited. The disclosure fairly represents information compiled by Mr Rodney Brown a Member of Australian
Institute of Mining and Metallurgy and is an employee of SRK Consulting (Australia) Pty Ltd, independent of Critica Limited
and has no conflict of interest.
The Company confirms that all material assumptions and technical parameters underpinning the Mineral Resources
Estimates referred to within previous ASX announcements remain current and have not materially changed since last
reported. The Company is not aware of any new information or data that materially affects the information included in this
announcement.
The Company confirms that the form and context in which the Competent Person's findings are or were presented have not
been materially modified.
ESTIMATION AND REPORTING OF MINERAL RESOURCES – MOUNT LINDSAY PROJECT
The information in this report that relates to Mineral Resources for the Mount Lindsay Projects is based on information
compiled by Dr. Stuart Owen who is a Member of the Australian Institute of Geoscientists. Dr. Owen is a permanent
employee of Critica Limited. Dr Owen has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2004 and 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Dr Stuart Owen consents to the inclusion in the report of the matters based on his information in the form and context in
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
7
ASX: CRI
which it appears. This information was prepared and first disclosed under the JORC Code 2004. It has not been updated
since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last
reported.
The Information in this announcement that relates to previous exploration results for the Projects is extracted from
the following ASX announcements:
•
•
•
•
•
Critica Advances Jupiter’s Beneficiation Work Delivering Outstanding Magnet and Strategic Heavy Rare Earth
Grades – 16 July 2025
Critica Commences Bulk Metallurgical Testwork – 28 May 2025
Drill Targets Restricted Heavy REE at Satellite Prospects – 5 May 2025
Jupiter Maiden Resource: Australia’s Largest and Highest-Grade Clay Hosted Rare Earth Resource – 11 February
2025
First Pass Metallurgical Testwork Delivers 830% REE Upgrade – 23 January 2025
Notes:
1.TREO represents the sum of 14 Rare Earth Elements excluding Promethium plus Yttrium expressed as oxides.
2.MREO represents the sum of the Neodymium, Praseodymium, Dysprosium and Terbium expressed as oxide
Glossary
RE – Rare earth(s)
REE – Rare earth elements
TREO – Total rare earth oxides
MREO – Magnet rare earth oxides
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
8
ASX: CRI
APPENDIX A: TENEMENT REGISTER
Mining tenements held at the end of June 2025 Quarter
Project
Location
Tenement
Interest at end of
June 2025
Brothers
Western Australia
E59/2710
100%
Western Australia
E59/2711
100%
Western Australia
E59/2819
100%
Western Australia
E59/2821
100%
Western Australia
E59/2827
100%
Western Australia
E59/2889
100%
Western Australia
E59/2890
100%
Western Australia
E59/2907
100%
Western Australia
E59/2927
100%
Western Australia
E59/2928
100%
Western Australia
E59/2930
100%
Western Australia
E59/2421
100%
Western Australia
E59/2463
100%
Tasmania
3M/2012
100%4
Tasmania
7M/2012
100%
Tasmania
EL21/2005
100%
Tasmania
EL12/2022
100%
Western Australia
P59/2116
100%
Western Australia
E59/2243
100%
Western Australia
E59/2244
100%
Western Australia
E59/2285
95%1
Western Australia
E59/2288
100%
Western Australia
E59/2506
51%2
Western Australia
E59/1989
51%2
Western Australia
E70/5077
100%3
Jupiter
Mount Lindsay
Golden Grove North
Kulin
Notes
1
A 5% interest is held by Galahad Resources Pty Ltd with Critica potentially earning up to 100%.
Critica is earning up to 90% interest from Bright Point Gold Pty Ltd on E59/1989 with a 10% interest held by Bright Point Gold. Once Critica has earned a 90% interest, Bright Point must elect to
either contribute or dilute to a royalty of 1% NSR.
3
Farm-in Agreement with Ausgold Limited.
4
Livingstone Mining Licence in the process of being converted to a Retention Licence (RL1/2024) with Minerals Resources Tasmania.
2
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
9
ASX: CRI
Mining tenements acquired and disposed during the June 2025 Quarter:
Project
Interest at beginning
of Quarter
Interest at end
of Quarter
Location
Tenement
Kulin
Western Australia
E70/5084
51%
-
Kulin
Western Australia
E70/5801
100%
-
Brothers
Western Australia
E59/2820
100%
-
Disposed
Acquired
Nil
Beneficial percentage interests in joint venture agreements at the end of the Quarter:
Project
Location
Tenement
Interest at beginning
of Quarter
Interest at end
of Quarter
-
Beneficial percentage interests in farm-in or farm-out agreements acquired or disposed of during the Quarter:
Project
Location
Tenement
Interest at beginning of
Quarter
Interest at end of
Quarter
Kulin
Western Australia
E70/5077
100%
100%
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
10
ASX: CRI
APPENDIX B:
TABLE 2: JUPITER BENEFICIATION TEST WORK RESULTS
APPENDIX A – JORC CODE (2012 EDITION) TABLE
Table 1 | Jupiter beneficiation test work results
Sample
Feed
Mass %
TREO ppm
MREO ppm
HREO ppm
NdPr+HREO
ppm
La2O3 ppm
CeO2 ppm
Pr6O11 ppm
Nd2O3 ppm
Sm2O3 ppm
Eu2O3 ppm
Gd2O3 ppm
Tb4O7 ppm
Dy2O3 ppm
Ho2O3 ppm
Er2O3 ppm
Tm2O3 ppm
Yb2O3 ppm
Lu2O3 ppm
Y2O3 ppm
P2O5 %
Concentrate1 Concentrate2 Concentrates1&2
100
1,903
463
168
609
3.3
20,261
5,200
1,831
6,773
2.1
8,422
2,106
726
2,731
5.5
15,629
3,990
1,399
5,192
376
850
95
346
56.9
11.5
35.6
4.0
18.3
3.2
7.8
0.9
5.4
0.7
92
1.3
4234
8501
1116
3826
620.4
133.2
411.5
45.8
212.3
33.0
76.5
9.0
42.4
4.8
996
18.9
1806
3575
442
1563
255.1
55.0
164.8
18.1
82.4
12.9
30.6
3.5
17.0
1.9
395
6.0
3284
6573
853
2941
477.5
102.6
315.0
34.9
161.5
25.1
58.6
6.9
32.4
3.7
761
13.8
1.TREO represents the sum of 14 Rare Earth Elements excluding promethium plus yttrium expressed as oxides
2.MREO represents the sum of neodymium, praseodymium, dysprosium and terbium expressed as oxides
2.HREO represents the sum of the gadolinium, terbium, dysprosium, holmium, erbium, thulium, ytterbium, lutetium and yttrium as oxides
TABLE 3: 800 GAUSS MAGNETIC CONCENTRATE BY-PRODUCT OF CTSME REE BENEFICIATION
TEST WORK
Fe
%
SiO2
%
Al2O3
%
MgO
%
CaO
%
Na2O
%
K2O
%
MnO
%
P%
S%
67
2.6
0.93
0.2
0.34
0.05
0.13
0.13
0.05
<0.01
Mass
%
MREO
ppm
HREO
ppm
8
40
20
TABLE 4: JUPITER INFERRED MINERAL RESOURCE ESTIMATE – ASX ANNOUNCEMENT 11
FEBRUARY 2025
Cut-off
Tonnage
TREO
MREO
La2O3
CeO2 Pr6O11 Nd2O3 Sm2O3
Eu2O3
Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3
Tm2O3
Yb2O3 Lu2O3
Y2O3
TREO (ppm)
(Bt)
(ppm)
(ppm)
(ppm)
(ppm)
(ppm)
(ppm)
(ppm)
(ppm)
(ppm) (ppm)
(ppm)
(ppm)
(ppm)
(ppm)
(ppm)
1,000
1.78
1,651
383
342
762
81
284
41
9
6
1
5
1
74
25
3
(ppm) (ppm)
14
2
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
ABN 51 119 678 385 | T: +61 8 6279 9428 | F: +61 8 6500 9986 | admin@critica.limited | www.critica.limited
11
ASX: CRI
Cut-off
Tonnage
TREO
MREO
La2O3
CeO2 Pr6O11 Nd2O3 Sm2O3
1,800
0.52
2,169
499
444
1,023
106
371
53
Eu2O3
11
Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3
31
4
18
3
8
Tm2O3
1
Yb2O3 Lu2O3
6
Y2O3
1
90
Based on 1,000 ppm and 1,800 ppm TREO lower cut-off grades
TABLE 5: MOUNT LINDSAY TIN-TUNGSTENT PROJECT - RESOURCE
Notes:
•
The Sn equivalent formula used to calculate the Sn equivalent values for the Main and No.2 Skarns is as follows: Sn Equivalent (%) = Sn% +
(WO3% x 1.90459) + (mass recovery % of magnetic Fe x 0.006510) + (Cu% x 0.28019). Whereas for the Sn equivalent formula used to calculate
the Sn equivalent values for the Stanley River South and Reward Skarns is as follows: Sn Equivalent (%) = Sn% + (WO3% x 1.65217) + (Cu% x
0.34783).
•
The mass recovery of the magnetic iron is determined mostly by Davis Tub