The Board of Critica Minerals Limited (Critica or the Company) is pleased to announce that regional, reconnaissancestyle drilling has identified broad zones of high-grade, rare earth mineralisation, 40 kilometers to the east of the
Company’s flagship Jupiter Project. The results indicate the potential for high ratios of the sought-after, magnet rare
earth oxides (MREO) with drill intersections containing up to 34% MREO.
HIGHLIGHTS
•
Significant values of Dysprosium and Terbium
•
Up to 8m @ 4,256ppm TREO occur within broader zones of rare earth mineralisation
•
Up to 34% MREO suggests potential for high MREO/TREO ratio
•
Low Th & U
•
Multiple high-grade zones of mineralisation intersected over 8km of strike
•
Drilling delivered a high success rate with substantial rare earth mineralisation occurring in multiple air
core holes over very broad drill spacing
•
64 Aircore holes drilled in regional program with assay results still pending for 48 holes
Hole No.
Metres/TREO ppm
Including TREO ppm
MREO/TREO
(Incl Intersections)
BRAC316
46m @ 1,675
6m @ 3,541
34%
BRAC318
22m @ 2,239
4m @ 4,327
32%
BRAC321
34m @ 2,293
8m @ 3,605
33%
BRAC327
16m @ 2,656
8m @ 4,256
22%
Philippa Leggat, Commented:
“These latest drill results clearly demonstrate the potential of the broader Brothers Project which now encompasses over
1,353 square kilometers of highly prospective tenure. The high ‘strike rate’ we are seeing from such broad spaced, firstpass, regional drilling is particularly pleasing.
“Having had such great success from our drilling at Jupiter, the Team is excited to see satellite discoveries starting to
emerge around the Project. We look forward to sharing the regional drilling results as we receive them”
CRITICA LIMITED Level 2, 16 Altona Street, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@critica.limited | www.critica.limited
1
Figure 1 | Priority regional targets location map
2
Figure 2 | Regional rare earth discovery 40km east of Jupiter
3
ABOUT JUPITER
Jupiter is a high-grade, clay-hosted rare earths project that was discovered in late 2023. It’s strategically located
within an existing mining precinct in Yalgoo, Western Australia. Jupiter was originally identified by geophysics and
low exploration costs have enabled Critica to quickly advance the project. Over 22,000 metres have been drilled at
Jupiter in under a year. Critica is well-funded to keep advancing the project. Additional drilling and metallurgy are
underway, and the maiden resource targeted by the end of 2024.
Jupiter boasts remarkably consistent rare earth mineralisation over the entire 40 square kilometre project area.
Broad, high-grade zones of 20 to 30 metre widths, grade over 2,000ppm of Total Rare Earth Oxides (TREO) and these
typically occur within circa 80 metre zones of mineralisation that grade over 1,000ppm TREO. The valuable magnet
rare earths (MREO) make up an average of 23 percent of the material which grades over 1,000ppm TREO. A standout feature of the project is the very, low prevalence of thorium and uranium.
Jupiter enjoys a myriad of benefits on account of the significant, surrounding infrastructure. The project is less than
10 kilometres from the bitumen highway that runs between Mount Magnet and Geraldton, providing easy access to
local labour centres, the Port at Geraldton and the mid-west gas pipeline that runs parallel to the highway. A unique
benefit is that the project is in proximity to Lynas’ Mt Weld project and their rare earths concentrator which is currently
under construction. Iluka are also planning a rare earth refinery at Eneabba which is within easy driving distance of
the site. The driving time from site to Perth is just six hours and a short two-and-a-half hours to Geraldton.
The broader Brothers Project, which includes Jupiter, consists of a total strategic landholding of approximately
1,353km2 of granted tenure. The licences are situated on pastoral leases which are minimally stocked. The terrain
at Jupiter is flat, sparsely vegetated and facilitates year-round access.
Authorised by the Board of Critica Limited.
Philippa Leggat
Managing Director
CONTACT US
Critica Limited
Level 2, 16 Altona Street, West Perth, Western Australia
T: + 61 8 6279 9428 | admin@critica.limited | www.critica.limited
4
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled
by Dr. Stuart Owen who is a Member of the Australian Institute of Geoscientists. Dr. Owen is a permanent employee of Critica
Limited and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr. Owen consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
The Information in this announcement that relates to previous exploration results for the Projects is extracted from the
following ASX announcement:
•
“Another Record Drilling Result – 57m @ 3,430ppm TREO” 17 July 2024
•
“Best Drill Intersection to date – 58m @ 2,723ppm TREO” 17 June 2024
•
“8m @ 5,716ppm TREO- Jupiter Drilling Continues to Outperform” 5 June 2024
•
Drilling Delivers More Record REE Intersections at Jupiter” 23 May 2024
•
“Jupiter-more outstanding REE hits up to 60 m over 2000 ppm” 16 April 2024
•
“Strategic Acquisition Adjacent to Jupiter REE Discovery” 22 March 2024
•
“300 Drillhole Program Commences at Jupiter” 15 March 2024
•
“Jupiter Continues to Deliver with Record NdPr over 5,000 ppm”, 8 March 2024
•
“Jupiter delivers record drill hit of 48 m @ 3,025 ppm TREO” 9 February 2024
•
“Jupiter Delivers over 7,000 ppm TREO from Maiden RC Drilling” 29 November 2023
•
“Massive new REE Target at Brothers with up to 3,969 ppm TREO” 9 November 2023
•
“VMS makes High Grade clay hosted REE discover at Brothers” 1 August 2023
•
“Venture set to drill at the Iron Duke High Grade REE Project”18 May 2023
•
Notes”
•
•
“JV into Neighbouring REE project with 49m @ 1313ppm TREO” 9 May 2023
1.TREO represents the sum of 14 Rare Earth Elements excluding Promethium plus Yttrium expressed as oxides.
2.MREO represents the sum of the Neodymium, Praseodymium, Dysprosium and Terbium expressed as oxides
5
Table One: Jupiter Drill hole locations and significant intersections
Hole No.
East
MGA
Zone 50
GDA94
m
North
MGA
Zone 50
GDA94
m
EOH
m
From
m
To
m
Interval
m
TREO
ppm
MREO
ppm
MREO/
TREO
Pr6O1
ppm
Nd2O3
ppm
Tb4O7
ppm
Dy2O3
ppm
BRAC314
BRAC315
BRAC316
including
BRAC317
including
BRAC318
including
including
BRAC319
BRAC320
BRAC321
including
BRAC322
BRAC323
BRAC324
BRAC325
BRAC326
BRAC327
including
BRAC328
BRAC329
BRAC330
BRAC331
BRAC332
BRAC314
560066
559907
559689
6825242
6826391
6827868
8
9
90
559455
6829517
65
562669
6834023
58
561486
560490
558974
6833554
6832599
6833004
42
16
74
4
4
44
84
32
40
36
36
36
32
8
40
44
8
8
90
90
65
48
58
48
40
40
16
74
52
780
855
1675
3541
1453
2158
2239
2860
4327
1105
855
2292
3605
173
196
352
1215
317
469
596
820
1393
214
174
620
1175
129
146
262
914
237
352
444
612
1032
157
130
468
892
1
2
3
11
2
3
4
5
6
2
1
4
7
5
7
14
57
11
14
18
22
25
8
6
19
32
6834001
6836003
6838007
6840000
6839980
6845658
36
16
63
19
43
36
561684
563298
562230
562241
562232
560066
6845662
6845742
6846018
6847026
6847950
6825242
5
62
14
42
66
8
52
8
24
20
28
0
24
4
32
32
4
63
19
36
36
36
5
62
8
42
64
8
1413
1115
1065
2656
4256
1012
1128
570
2026
953
780
288
176
279
604
931
244
244
132
325
215
173
22%
23%
21%
34%
22%
22%
27%
29%
32%
19%
20%
27%
33%
NSI
NSI
20%
16%
26%
23%
22%
24%
22%
23%
16%
23%
22%
38
42
73
234
67
100
131
183
331
47
38
129
245
558956
558898
558840
558871
557406
560592
4
4
46
6
33
8
22
12
4
8
8
34
8
NSI
NSI
11
11
12
16
8
5
38
4
10
32
4
65
42
62
132
198
52
56
28
90
43
38
212
128
207
447
693
184
179
98
280
160
129
2
1
2
4
7
2
2
1
2
2
1
10
6
9
21
34
7
8
6
10
10
5
TREO represents the sum of 14 Rare Earth Elements excluding Promethium plus Yttrium expressed as oxides. MREO represents the sum of the
Neodymium, Praseodymium, Dysprosium and Terbium expressed as oxides See Table Three for complete REE assay listing. NSI = no significant
intersection Intersections are made up of 4 m composite sample results with the bottom of the hole sample results a miixture of 2 m, 3 m, 5 m
and 6 m composite sample results.
6
Table Two: Jupiter Drilling REE, Th and U assays.
Hole
BRAC314
BRAC315
BRAC315
BRAC316
BRAC316
BRAC316
BRAC316
BRAC316
BRAC316
BRAC316
BRAC316
BRAC316
BRAC316
BRAC316
BRAC316
BRAC317
BRAC317
BRAC317
BRAC317
BRAC317
BRAC317
BRAC317
BRAC317
BRAC317
BRAC317
BRAC318
BRAC318
BRAC318
BRAC318
BRAC318
BRAC318
BRAC318
BRAC319
BRAC319
BRAC319
BRAC320
BRAC320
From
m
4
4
8
44
48
52
56
60
64
68
72
76
80
84
88
4
32
36
40
44
48
52
56
60
64
32
36
40
44
48
52
56
28
32
36
8
12
To
m
8
8
9
48
52
56
60
64
68
72
76
80
84
88
90
8
36
40
44
48
52
56
60
64
65
36
40
44
48
52
56
58
32
36
40
12
16
Interval
m
4
4
1
4
4
4
4
4
4
4
4
4
4
4
2
4
4
4
4
4
4
4
4
4
1
4
4
4
4
4
4
2
4
4
4
4
4
TREO
ppm
780
855
526
1152
1471
1550
1091
1021
1034
1346
1712
1986
1588
3326
3972
822
566
1209
2001
2315
1790
1554
1647
604
1212
291
4327
1984
2270
1618
1438
1357
87
1465
744
830
879
La2O3
ppm
180
177
104
259
297
406
204
170
150
175
260
307
305
853
1004
201
152
307
443
583
435
367
378
130
273
111
1331
547
491
366
355
306
17
396
184
170
182
CeO2
ppm
367
399
253
554
739
694
605
630
706
984
1181
1283
873
761
807
193
263
620
1054
950
723
715
731
216
505
84
1277
801
874
683
626
607
28
686
361
461
411
Pr6O11
ppm
38
42
25
56
64
65
41
33
29
32
46
59
61
217
266
50
25
47
78
123
90
72
77
28
57
14
331
102
115
74
66
59
3
63
32
34
42
Nd2O3
ppm
129
146
87
192
230
215
137
111
93
103
149
203
212
838
1066
202
77
147
266
438
333
250
282
110
206
45
1032
357
448
269
231
208
11
208
107
108
152
Sm2O3
ppm
17
20
13
27
35
30
19
15
12
13
20
29
30
126
158
31
10
19
35
57
46
33
39
16
29
6
131
48
66
38
31
28
2
28
16
14
22
Eu2O3
ppm
3.8
4
2.5
5.1
7
6.6
3.8
3
2.5
2.5
3.7
6.1
6
27.2
33.1
6.6
2
3.8
7.2
11.3
9.3
6.6
8.1
3.5
6
1.4
21.8
9
13.6
7.7
6.3
5.8
0.6
5.7
3.4
2.6
4.2
Gd2O3
ppm
9
12
7
12
20
22
12
9
7
7
10
18
17
86
106
21
6
11
20
31
27
20
24
12
20
4
51
25
42
26
20
18
2
18
10
7
13
Tb4O7
ppm
1.1
1.5
0.9
1.5
2.5
2.7
1.4
1.1
0.9
0.8
1.2
2.2
2.2
10.6
13.1
2.7
0.8
1.5
2.6
3.5
3.2
2.3
2.8
1.6
2.4
0.6
5.9
2.9
5.1
3.1
2.4
2.3
0.4
2.2
1.2
0.9
1.4
Dy2O3
ppm
4.6
7.1
4.6
6.6
11.1
13.1
7.4
5.5
4.3
4
5.7
10.9
10.6
52.2
65.6
14.2
3.8
6.8
12.1
16
15.4
10.8
13.3
8.6
12.2
3.3
25.1
13.6
26.2
16.3
11.8
11.9
2.8
9.9
5.8
4.5
7.3
Ho2O3
ppm
0.8
1.3
0.8
1.1
1.9
2.4
1.4
1.1
0.8
0.7
1
1.9
2
9.8
12.1
2.7
0.7
1.2
2.3
2.8
2.9
2
2.5
1.8
2.5
0.6
3.9
2.3
5
3.3
2.2
2.4
0.6
1.7
1
0.8
1.3
Er2O3
ppm
2.3
3.4
2.3
2.9
4.9
6.3
4.2
3.2
2.1
1.8
2.6
4.8
5.3
25.5
31.5
7.3
1.9
3
5.7
7.3
7.2
5.4
6.4
5.4
6.9
1.6
8.6
5.5
13
8.8
6
7.1
1.8
3.9
2.2
2.1
3.2
Tm2O3
ppm
0.3
0.5
0.3
0.4
0.7
0.9
0.6
0.5
0.3
0.3
0.4
0.7
0.8
3.8
4.8
1.1
0.3
0.4
0.8
1
1.1
0.8
0.9
0.8
1
0.2
1.1
0.8
2
1.2
0.8
1
0.3
0.5
0.3
0.3
0.5
Yb2O3
ppm
2
3
2
3
5
6
4
3
2
2
3
5
5
25
31
7
2
3
5
7
7
5
6
6
7
1
6
4
12
8
5
6
2
3
2
2
3
Lu2O3
ppm
0.3
0.4
0.3
0.4
0.7
0.9
0.6
0.5
0.4
0.4
0.4
0.7
0.8
3.6
4.7
1.1
0.3
0.4
0.8
1.1
1.1
0.9
0.9
1
1.1
0.2
0.8
0.6
1.8
1.2
0.9
1
0.4
0.5
0.3
0.3
0.4
Y2O3
ppm
26
39
25
32
53
81
49
36
23
20
28
55
58
287
370
82
22
37
69
84
88
65
75
64
84
18
101
67
154
114
73
94
14
38
20
25
37
Th
ppm
38
41
27
67
66
68
67
69
67
70
84
64
56
49
40
26
63
72
70
65
55
51
48
25
41
59
43
48
50
45
43
46
32
54
32
33
43
U
ppm
4
5
4
10
14
13
12
11
14
19
22
21
19
18
16
5
7
12
15
16
14
16
23
10
19
6
8
7
9
7
7
7
6
7
4
4
6
7
Hole
BRAC321
BRAC321
BRAC321
BRAC321
BRAC321
BRAC321
BRAC321
BRAC321
BRAC321
BRAC321
BRAC324
BRAC324
BRAC324
BRAC325
BRAC325
BRAC325
BRAC326
BRAC326
BRAC326
BRAC326
BRAC327
BRAC327
BRAC327
BRAC327
BRAC328
BRAC329
BRAC329
BRAC329
BRAC329
BRAC329
BRAC329
BRAC329
BRAC329
BRAC329
BRAC329
BRAC330
BRAC331
BRAC331
BRAC331
BRAC332
From
m
36
40
44
48
52
56
60
64
68
72
52
56
60
8
12
16
20
24
28
32
20
24
28
32
0
24
28
32
36
40
44
48
52
56
60
4
32
36
40
32
To
m
40
44
48
52
56
60
64
68
72
74
56
60
63
12
16
19
24
28
32
36
24
28
32
36
5
28
32
36
40
44
48
52
56
60
62
8
36
40
42
36
Interval
m
4
4
4
4
4
4
4
4
4
2
4
4
3
4
4
3
4
4
4
4
4
4
4
4
5
4
4
4
4
4
4
4
4
4
2
4
4
4
2
4
TREO
ppm
481
1491
4401
2808
2088
1785
2707
1691
1697
1633
1391
1909
782
685
1505
1168
643
1478
805
912
1085
1029
5304
3207
1012
722
956
1362
1363
1072
1078
1058
1233
1270
1203
570
2848
1876
681
898
La2O3
ppm
173
528
1279
594
430
358
461
327
312
357
301
406
173
145
263
233
201
442
185
155
423
345
833
531
214
205
230
429
346
256
252
242
280
234
204
119
581
330
104
157
CeO2
ppm
152
386
1095
1132
1019
853
1461
740
775
524
720
939
377
376
968
648
204
494
349
411
319
290
2837
1627
468
292
431
572
645
499
519
496
580
634
556
257
1664
1050
305
486
Pr6O11
ppm
24
88
333
156
98
88
118
87
83
92
62
88
37
26
51
50
42
96
43
46
68
65
265
132
52
37
45
70
68
57
55
56
60
55
54
28
133
78
28
40
Nd2O3
ppm
78
308
1165
619
360
307
427
325
303
333
199
292
123
82
155
153
133
305
145
170
192
209
897
489
184
123
150
196
209
180
175
180
196
191
196
98
386
262
105
142
Sm2O3
ppm
12
39
154
90
52
44
60
47
46
48
26
40
16
11
19
20
16
40
19
25
21
27
125
69
26
14
19
21
24
22
21
22
25
28
31
14
43
39
19
22
Eu2O3
ppm
2.6
8.6
29.8
17.1
10.3
8.9
12.4
9.5
9.6
10.2
5.1
7.1
3.2
2.2
3.4
3.3
3.5
8.3
4.1
5.5
3.8
4.9
22.3
13.7
5.5
2.9
4.2
4
5
4.1
4.1
4.3
5.1
6
7
2.8
6.7
8
4.7
4.7
Gd2O3
ppm
8
28
81
49
28
25
33
28
29
31
14
24
10
7
10
11
9
20
11
16
12
15
63
48
14
9
13
11
13
11
10
12
15
18
22
9
13
23
16
11
Tb4O7
ppm
0.9
3
8.8
5.5
3.2
3.1
3.9
3.3
3.6
3.8
1.8
3
1.2
1
1.3
1.4
1
2.5
1.4
2
1.5
1.9
7.9
6.2
1.6
1.1
1.6
1.3
1.5
1.3
1.3
1.4
1.9
2.4
2.9
1.2
1.4
2.8
2.3
1.4
Dy2O3
ppm
4.4
13.8
39.4
24.5
14.3
14
17.2
15.1
16.5
18.8
8.7
14.2
5.6
4.9
6
6.9
5.2
11.4
6.3
10
7
9.3
36.6
31.5
6.7
5.2
8
6.4
7.7
6.5
5.9
6.5
9.3
11.9
14.7
5.7
5.4
13.3
12.6
6.6
Ho2O3
ppm
0.8
2.5
6.6
4.1
2.3
2.5
3
2.8
3.2
4
1.6
2.7
1.1
0.9
1.1
1.2
1
1.9
1.3
2.1
1.2
1.8
6.6
6.7
1.2
1
1.6
1.2
1.3
1.1
1.1
1.2
1.7
2.3
2.9
1.1
0.7
2.3
2.5
1
Er2O3
ppm
2
5.7
15.8
9.2
5.7
6.1
7.9
7.2
8.3
13
4
6.7
2.7
2.3
2.5
3.3
2.5
5.1
3.2
5.3
3
4.7
17.4
18.9
3
2.3
4.1
3.6
3.4
3
2.8
3.1
4.6
6.4
8
2.8
1.5
5.7
6.3
2.7
Tm2O3
ppm
0.3
0.7
2.2
1.2
0.7
0.9
1
1
1.3
2.1
0.5
0.9
0.4
0.3
0.3
0.4
0.3
0.7
0.5
0.8
0.4
0.6
2.4
2.8
0.4
0.3
0.5
0.5
0.5
0.4
0.4
0.4
0.7
0.9
1.2
0.4
0.2
0.8
0.9
0.4
Yb2O3
ppm
1
4
12
7
4
5
6
6
8
15
3
5
2
2
2
3
2
4
3
5
2
4
15
17
2
2
3
3
3
3
3
3
4
6
7
2
1
5
5
2
Lu2O3
ppm
0.2
0.5
1.7
0.8
0.6
0.7
0.9
1
1.2
2.9
0.4
0.8
0.4
0.3
0.3
0.4
0.3
0.6
0.4
0.8
0.3
0.6
2
2.6
0.3
0.2
0.4
0.4
0.5
0.4
0.4
0.4
0.6
0.9
1.2
0.3
0.2
0.7
0.8
0.4
Y2O3
ppm
23
77
179
100
60
70
96
91
99
179
44
80
30
24
23
34
23
47
35
58
30
51
175
213
34
26
46
43
36
30
27
31
50
74
95
30
12
57
70
20
Th
ppm
69
69
70
70
69
99
78
78
63
53
45
48
21
24
33
29
26
41
25
23
61
44
41
44
39
22
48
46
44
46
42
43
41
43
39
34
43
51
17
55
U
ppm
5
7
10
14
15
16
14
9
10
8
6
9
5
2
4
6
3
6
5
6
6
6
11
7
4
2
5
5
6
6
5
6
5
8
8
2
8
11
3
9
8
Hole
BRAC332
BRAC332
BRAC332
BRAC332
BRAC332
BRAC332
BRAC332
From
m
36
40
44
48
52
56
60
To
m
40
44
48
52
56
60
64
Interval
m
4
4
4
4
4
4
4
TREO
ppm
390
611
1290
1143
1169
1095
1025
La2O3
ppm
62
124
256
248
228
208
195
CeO2
ppm
214
318
636
530
518
464
410
Pr6O11
ppm
15
24
57
57
56
50
47
Nd2O3
ppm
56
82
205
202
215
196
181
Sm2O3
ppm
9
13
33
31
37
35
32
Eu2O3
ppm
2.1
2.8
6.9
6.5
8.1
8
7.3
Gd2O3
ppm
6
9
21
19
25
27
24
Tb4O7
ppm
0.9
1.2
2.6
2.1
3
3.4
3.2
Dy2O3
ppm
4.1
5.3
11.1
9
13.1
15
14.8
Ho2O3
ppm
0.8
1
1.9
1.4
2.1
2.6
2.8
Er2O3
ppm
2
2.5
4.2
2.8
5.1
6.5
7.2
Tm2O3
ppm
0.3
0.3
0.5
0.4
0.7
0.9
1
Yb2O3
ppm
2
2
3
3
5
6
7
Lu2O3
ppm
0.3
0.3
0.4
0.4
0.8
0.9
1
Y2O3
ppm
15
26
52
33
53
73
93
Th
ppm
75
59
74
88
86
69
55
U
ppm
10
7
8
11
10
8
11
9
Appendix One: JORC Code, 2012 Edition | ‘Table 1’ Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Table
Sampling
techniques
•
Nature and quality of sampling (e.g.: cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the
broad meaning of sampling.
Measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools
or systems used.
Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would be
relatively simple (e.g.: ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g.: submarine nodules) may
warrant disclosure of detailed information.
Drill type (e.g.: core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc..)
and details (e.g.: core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what
method, etc..).
•
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter, half
or all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
•
•
•
Drilling techniques
Drill sample
recovery
•
•
•
•
Logging
•
•
•
Sub-sampling
techniques and
sample
preparation
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Assay results for some 19 reconnaissance Air Core
(AC) drill holes for 764 m are being reported. The
holes were drilled to test clay-hosted REE targets
within the Brothers REE Project.
The AC drill cuttings were collected from the drill rig
cyclone in 1 m intervals and arranged in rows on site
for assay sampling. Composite samples typically
representing 4 m intervals (range 2 to 6 m) were
collected as appropriate by sampling spear from the
bulk 1 m samples.
Drilling and sampling was supervised by a suitably
qualified Critica geologist.
Samples were submitted to commercial assay
laboratory ALS Geochemistry (“ALS”) for assay.
This report is based on 19 holes drilled with a KL 150
AC rig operated by KTE Mining Services Pty Ltd.
The AC drilling was conducted with a 90mm blade
and holes were drilled to blade refusal in near fresh
rock.
The bulk AC samples were visually assessed and
considered representative with good recovery.
Most of the holes encountered water which only
locally impacted sample recovery.
All holes were qualitatively geologically logged by
suitably qualified Critica geologists.
Mineral Resources have not been estimated.
The detail of geological logging is considered
sufficient for exploration and resource definition
drilling.
Drill composites of 2 to 6 m length were collected by
sampling spear from the bulk 1 m samples.
Assay sample weights ranged between 0.8 to 3.6 kg
with an average of averaged 2.4 kg. Sample sizes is
considered appropriate for the material sampled.
Commercial assay standards were included in the
laboratory submittals at a rate of c. 1 per 25
samples.
Field duplicate samples were collected at a rate of
c. 1 per 20 samples.
The average 4 m sample lengths are considered
appropriate for the observed mineralisation.
10
Criteria
JORC Code explanation
Commentary
Quality of assay
data and
laboratory tests
•
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have been established.
•
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay data.
•
•
•
Verification of
sampling and
assaying
•
•
•
•
•
•
•
•
•
•
Location of data
points
•
•
•
Data spacing and
distribution
•
•
•
Orientation of data
in relation to
geological
structure
•
•
Sample security
•
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
•
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the deposit
type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
The measures taken to ensure sample security.
•
•
•
•
•
•
•
•
Audits or reviews
•
The results of any audits or reviews of sampling
techniques and data.
•
•
All samples were submitted to ALS Geochemistry,
Perth (“ALS”) where they were oven dried then
pulverized to P80 -75 microns (method PUL-23).
Assaying of drill samples was conducted by ALS
using a lithium borate fusion at 1025 deg C followed
by nitric + hydrochloric + hydrofluoric acid digestion
of the resultant glass bead and ICP-MS finish for 32
elements including full REE suite (ALS method MEMS81).
95% of the client assay standards reported within
10% of the REE+Y certified reference values for the
range of interest (>1 ppm).
The use of twinned holes is not applicable at this
stage.
The assay results are compatible with observed
mineralogy.
Primary data is stored and documented in industry
standard ways.
Critica assay data is as reported by ALS and has not
been adjusted in any way.
Remnant assay pulps are currently held in storage
by ALS.
Drill hole locations were determined by handheld
GPS with a nominal accuracy of +/- 5 metres.
All coordinates and maps presented here are in the
MGA Zone 50 GDA94 system.
Topographic control is provided by Worldwide 3 arc
second SRTM spot height data.
The reported drilling is part of a reconnaissance
nature drilled along existing pastoral station tracks
on c. 1 to 6 km spacings.
The assay results reported here are for 2 to 6 m
intervals composited from the bulk 1 m AC sample
intervals.
The AC holes were drilled vertically along existing
pastoral tracks.
The intersected clay and saprolite zones blanket
weathered granitoid basement such that downhole
thickness approximate true thickness.
The chain of custody for all Critca samples from
collection to dispatch to assay laboratory was
managed by Critica personnel.
Sample numbers are unique and do not include any
locational or interval information useful to nonCritica personnel.
The level of security is considered appropriate for
such exploration drilling.
Duplicate sampling at a rate of c. 1 per c. 20
samples was used to evaluate sampling error and is
considered acceptable for such exploration and
resource drilling.
The new drilling results are compatible with Critica’
previously reported RC and AC drilling results.
11
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
•
•
The Brothers REE Project consists of granted Exploration
Licences E59/2421, E59/2463, E59/2710, E59/2711, E59/2819,
E59/2820, E59/2821, E59/2827, E59/2889, E59/2890 and
E59/2907. All are 100% held by Tasmanian Rare Earth Pty Ltd a
wholly owned subsidiary of Critica Limited.
•
Documented previous explorers within the area now covered by
the Brothers Project include North Flinders Mines Ltd, CRA
Exploration Pty Ltd, Spark Energy Pty Ltd, Arcadia Minerals Ltd,
Babalya Gold Pty Ltd, Burmine Ltd, Equigold NL, Equinox
Resources NL, Jervois Mining Ltd, Minjar Gold Pty Ltd, Mount
Magnet South NL, Sons of Gwalia Ltd and David Ross.
Refer to previous Critica announcements to the ASX and also
available from https://critica.limited/
The Brothers REE exploration area is situated within the
Western Australian Archean Yilgarn Craton and mostly
comprises Cenozoic cover sequence overlying an extensive
Archaean monzogranite complex (the Big Bell suite).
Location and orientation details are given in Table 1.
Collar location was determined by handheld Garmin GPS64sx
and is considered accurate to ±5m.
All coordinates and maps presented here are in the MGA Zone
50 GDA94 system.
Topographic control is provided by Worldwide 3 arc second
SRTM spot height data.
Refer to ASX Announcements 9 May 2023, 1 August 2023, 16
April 2024, 23 May 2024 and 5 June 2024 for historic RC drill
results and initial Brothers Project AC drill results respectively.
•
Exploration done
by other parties
•
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the time of
reporting along with any known
impediments to obtaining a licence to
operate in the area.
Acknowledgment and appraisal of
exploration by other parties.
•
Geology
•
Deposit type, geological setting and style of
mineralisation.
•
Drill hole
Information
•
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
easting and northing of the drill hole
collar
elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
dip and azimuth of the hole
down hole length and interception
depth
hole length.
If the exclusion of this information is
justified on the basis that the information is
not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
•
•
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation should
be stated and some typical examples of
such aggregations should be shown in
detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
•
•
Data aggregation
methods
•
•
•
•
•
•
•
•
•
Full sample assay interval results without aggregation methods
are given in Table 2.
Metal equivalents have not been applied.
Refer to ASX Announcement 9 May 2023 for historic drilling.
Standard element to oxide conversion factors have been used.
Individual REE values in Table 1 and 2 are rounded to
appropriately reflect reporting precision and the TREO field was
calculated on an unrounded basis.
La2O3
CeO2
Pr6O11
Nd2O3
Sm2O3
Eu2O3
Gd2O3
1.173
1.228
1.208
1.166
1.16
1.158
1.153
Tb4O7
Dy2O3
Ho2O3
Er2O3
Tm2O3
Yb2O3
Lu2O3
Y2O3
1.176
1.148
1.146
1.143
1.142
1.139
1.137
1.27
12
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept lengths
•
•
The intersected clay and saprolite zones blanket weathered
granitoid basement such that downhole thickness approximate
true thickness.
•
Appropriate exploration maps are included in this release.
•
Complete assay results for the announced intersections are
included in Table 2.
•
The results are considered indicative only of the mineralisation
in the area.
Refer to ASX Announcements 9 May 2023, 9 November 2023
and 16 April 2
Share your feedback
Discover