Quarterly Activities Report
for the period ending 31 March 2026
Critica Limited (ASX: CRI) (Critica or the Company) is pleased to provide its Quarterly Activities Report
for the period ending 31 March 2026.
Highlights from the Quarter
• First commercial-quality MREC produced at ANSTO at 58% TREO, validating a
conventional refinery-aligned product pathway and placing Jupiter at the upper end of
development-stage clay-hosted carbonate products
• MREC step-through recovery of approximately 80% TREO, with a defined pathway to
~89% TREO in a commercial circuit
• Effective impurity control achieved -U₃O₈ at 51 ppm, ThO₂ at 13 ppm - supporting
refinery suitability and product qualification
• Conventional sulphuric acid bake flowsheet validated; confirms Jupiter’s amenability
to standard, scalable hydrometallurgical processing, within a broader suite of potential
processing pathways
• Magnet rare earth dominant product profile - MREC enriched in Nd, Pr, Dy & Tb
representing 24.4% of TREO
• GAVAQ pilot plant 3,000 kg closed-circuit bulk sample progressing toward completion
• Resource upgrade drilling commenced at Jupiter - approximately 140 AC holes for
~7,000–10,000 metres on 125m x 125m spacing
• EIS co-funded regional drilling commenced at Juno (~30 holes) and Aurora (~28 holes)
under the WA Government Exploration Incentive Scheme
• SRK Consulting engaged to update the Jupiter Mineral Resource model as new data is
incorporated
• Scoping Study formally commenced - led by Sedgman, Snowden Optiro and SRK
Consulting
• Offtake and strategic partnership discussions ongoing
2
Critica’s CEO Jacob Deysel commented:
“The March 2026 quarter delivered two landmark milestones for Jupiter. In February, we produced our
first commercial-quality Mixed Rare Earth Carbonate at 58% TREO at ANSTO, confirming a
conventional, refinery-aligned product pathway and positioning Jupiter at the upper end of
development-stage clay-hosted peers.
We also commenced a major Air Core drilling programme at Jupiter, alongside regional drilling at Juno
and Aurora under the Exploration Incentive Scheme (EIS), directly supporting the Scoping Study through
resource upgrades and regional target testing. With SRK Consulting engaged to update the Mineral
Resource model, our Scoping Study team of Sedgman, Snowden Optiro and SRK firmly in place, and
metallurgical optimisation advancing across multiple parallel workstreams at ANSTO, Minutech–
AMML and Phenikaa University, the Company is systematically converting technical validation into a
robust and defensible development pathway.
In parallel, we continue to evaluate processing pathways and optimisation opportunities across the
broader flowsheet, ensuring Jupiter retains flexibility as we advance toward development, while
maintaining a disciplined approach to progressing the broader Critica project pipeline, including Mount
Lindsay.”
Jupiter Rare Earths Project
Project Overview
Jupiter is Australia’s largest clay-hosted rare earth resource, comprising 1.8 billion tonnes at
approximately 1,700 ppm TREO at a 1,000 ppm cut-off, including 640 million tonnes at approximately
490 ppm high-value magnet rare earth oxide (MagREO) at a 400 ppm cut-off. The deposit is located
within the Mt Magnet and Yalgoo mining district in Western Australia, less than 10 kilometres from
the bitumen highway connecting Mt Magnet and Geraldton, providing ready access to the Port of
Geraldton, the mid-west gas pipeline and transmission infrastructure within 40 kilometres of site.
During the March 2026 quarter, Jupiter advanced decisively on two parallel and mutually reinforcing
workstreams: the production of its first commercial-quality MREC at ANSTO, confirming a conventional
refinery-aligned product pathway - and highlighting the potential for multiple processing pathways -
and the commencement of a major resource upgrade drilling programme to support conversion of the
Inferred Mineral Resource to Indicated classification as a direct Scoping Study input.
3
MREC Production Milestone - ANSTO
On 16 February 2026, Critica announced the successful production of its first commercial-quality
Mixed Rare Earth Carbonate (MREC) from the Jupiter Rare Earth Project. The MREC was produced by
the Australian Nuclear Science and Technology Organisation (ANSTO) using Critica’s initial
beneficiation-derived intermediate concentrate and a conventional sulphuric acid bake
hydrometallurgical flowsheet.
This milestone marks Jupiter’s transition from laboratory-scale validation toward a proven, scalable
product, providing a key technical input into the ongoing Scoping Study. The successful production of
MREC at ANSTO, combined with the previously announced MREO products from GAVAQ,
demonstrating multiple potential downstream processing pathways and confirms the geological and
metallurgical optionality of the Jupiter system.
MREC Product Specification
The MREC produced by ANSTO delivered a Total Rare Earth Oxide (TREO) grade of 57.82%, placing
Jupiter at the upper end of grades reported for development-stage mixed rare earth
carbonate products. Key product characteristics are summarised in Table 1 below.
Table 1: | MREC key product characteristics (refer to ASX announcement 16 February 2026)
Component Unit MREC Result
TREO wt% 57.82
MREO (Nd, Pr, Dy, Tb) wt% 14.1
MREO/TREO wt% 24.4%
LREO wt% 55.4
HREO wt% 2.41
Al₂O₃ wt% 0.89
Fe₂O₃ wt% 0.08
Na₂O wt% 1.32
P₂O₅ wt% 0.22
SO₄ wt% 2.25
U₃O₈ ppm 51
ThO₂ ppm 13
Recovery and Process Performance
The ANSTO testwork employed a conventional sulphuric acid bake flowsheet comprising sulphuric acid
bake,water leach, two-stage impurity removal and MREC precipitation using a carbonate-based
reagent. Key recovery outcomes:
• Cumulative step-through recovery to MREC of approximately 80.3% TREO
4
• In a commercial operating circuit, recycling of IR-2 solids would recover rare earths currently
reporting to that stream, increasing projected overall recovery to approximately 89% TREO
• Effective iron and phosphorus rejection achieved through optimised impurity removal
conditions, reducing downstream rare earth co-precipitation losses
These results confirm the technical viability of a conventional sulphuric acid bake flowsheet for Jupiter
as a baseline processing pathway, while broader processing options continue to be evaluated as part
of the Scoping Study. The acid addition range and bake parameters applied are within typical ranges
used for rare earth phosphate concentrates.
Integrated Beneficiation-First Processing Pathway
Critica’s development approach integrates upfront beneficiation with conventional downstream
hydrometallurgical processing. The initial beneficiation-first strategy has demonstrated the ability to
reject approximately 95% of mass and upgrade head grades to an intermediate concentrate grading
approximately 1.9% TREO, significantly reducing downstream processing volume, reagent intensity
and capital requirements, with ongoing optimisation workstreams focused on further refining
performance. Both MREC and MREO product pathways have now been demonstrated, confirming
optionality for the downstream configuration.
Product and Market Positioning
With commercial-quality MREC and MREO now demonstrated, Critica is advancing the preparation of
representative product samples for qualification with downstream separation plants and refining
groups. The Company is progressing early-stage engagement with potential offtake counterparties,
aligning product specifications with refinery requirements as part of the Scoping Study execution
pathway. MREC and MREO are commonly traded intermediate products within the rare earth supply
chain, positioned higher in the value chain than mineral concentrates, reflecting its increased rare
earth content and suitability for downstream refining.
Metallurgical Optimisation - Ongoing Workstreams
Further optimisation work is advancing in parallel across multiple institutions, focused on:
• Reagent consumption optimisation across acid bake, impurity removal and solid–liquid
separation stages
• Recovery enhancement and impurity management to further reduce already-low impurity
levels
• Refinement of operating parameters
• Assessment of alternative process pathways to support capital and operating efficiency
Metallurgical programmes are advancing with ANSTO, Minutech – AMML and Phenikaa University.
Sedgman is providing integrated process engineering and development support, bringing extensive
rare earth project experience across multiple optimisation streams progressed in parallel.
5
GAVAQ Pilot Plant - Beneficiation (Closed Circuit)
The 3,000 kg closed-circuit beneficiation pilot plant at GAVAQ (Hanoi) was close to completion during
the quarter. The pilot is designed to generate decision-grade datasets including recoveries, concentrate
specifications, reagent consumption and operability metrics, and to produce bulk intermediate
concentrate for downstream hydromet optimisation at ANSTO and Minutech – AMML. Data generated
from the pilot programme will directly inform Scoping Study engineering workstreams.
Preparation and dispatch of an additional approximately 20,000 kg bulk sample for pilot-scale
treatment is planned as a near-term next step to support further optimisation and performance
improvement across the processing flowsheet, as well as the generation of intermediate concentrate
for MREC and MREO sample generation and downstream partner qualification.
Resource Upgrade & Regional Drilling
On 25 February 2026, Critica announced the commencement of a significant Air Core (AC) drilling
programme at the Jupiter Rare Earth Project, forming a key component of the ongoing Scoping Study.
The programme comprises resource upgrade drilling at Jupiter and EIS co-funded regional exploration
at Juno and Aurora across the broader Brothers Project area.
Jupiter Resource Upgrade Drilling
The Jupiter resource upgrade drilling programme comprises approximately 140 Air Core holes for
approximately 7,000–10,000 metres on a 125m x 125m drill spacing across the approximately 3km x
1km optimised resource footprint. The programme targets priority zones defined through optimisation
studies, with the aim of increasing drill density to support conversion of parts of the existing Inferred
Mineral Resource to Indicated classification, strengthening the basis for mine planning and Scoping
Study inputs.
SRK Consulting has been engaged to update the Jupiter Mineral Resource model as new drilling data
becomes available, supporting integration into the ongoing Scoping Study.
EIS Co-Funded Regional Drilling - Juno & Aurora
In parallel with Jupiter resource upgrade drilling, Critica has commenced regional Air Core drilling
across the broader Brothers Project area under the Western Australian Government’s Exploration
Incentive Scheme (EIS) Co-funded Drilling Programme. Up to 50% of eligible drilling and mobilisation
costs are reimbursed under this programme, reducing capital intensity while advancing broader
project upside.
Juno
Juno is a high-priority regional target located south of the Jupiter deposit within the Brothers Project.
The programme comprises approximately 30 AC holes testing priority targets within an approximate
2km x 500m corridor. Mineralisation at Juno is characterised by a higher proportion of magnet rare
earth oxides (MagREO), and the programme is evaluating potential for higher-value REE product
streams within the Brothers system.
6
Aurora
Aurora is a regional prospect located northwest of Jupiter, where prior drilling identified clay-hosted
REE mineralisation associated with a discrete aeromagnetic anomaly. The programme comprises
approximately 28 AC holes following up 2024 regional drilling results, testing mineralisation continuity
across an approximate 2km x 500m corridor targeting mineralisation analogous to Jupiter.
Scoping Study Progress
The Jupiter Scoping Study formally commenced during the March 2026 quarter. The Scoping Study is
led by the following specialist consultants:
• Sedgman - Lead study management and process integration
• Snowden Optiro - Mining and scheduling
• SRK Consulting - Resource update and optimisation
The Scoping Study integrates beneficiation, downstream processing, infrastructure and development
assumptions to define a base-case development pathway. The resource upgrade drilling programme,
MREC and MREO production results, GAVAQ pilot plant data and ongoing metallurgical optimisation
workstreams all feed directly into the Scoping Study.
Sustainability Profile
Critica continued to advance sustainability-related workstreams during the quarter through the
progression of pilot-scale beneficiation, downstream hydromet programmes and Scoping Study inputs.
The beneficiation-first development pathway supports a more compact and efficient processing
footprint with potential for lower reagent, energy and water intensity.
Jupiter’s clay-hosted mineralisation continues to exhibit consistently low in-situ uranium and thorium,
favourable for permitting and logistics. The confirmed ability to recover multiple critical minerals - rare
earths and gallium (figure 1) - through a single integrated flowsheet enhances resource efficiency and
alignment with Western critical-materials supply chain objectives.
7
Figure 1: | Resource Model – showing Ga₂O₃ grade distribution across the resource model
Brothers Project
Exploration and Field Work
During the quarter, field activities advanced with the commencement of resource upgrade and
regional drilling across the Brothers Project area. The drilling programmes at Jupiter, Juno and Aurora
represent the primary exploration and resource advancement activities for the period, as detailed in
the Resource Upgrade & Regional Drilling section above.
The broader Brothers Project area continues to demonstrate potential for additional resource growth.
Regional drilling at Juno and Aurora is assessing mineralisation continuity and scale beyond the current
Jupiter footprint, with the Juno target characterised by elevated magnet rare earth oxide proportions
and the Aurora target testing mineralisation analogous to Jupiter.
Mount Lindsay - Tin & Tungsten Project, Tasmania
Mount Lindsay is one of the world’s largest undeveloped tin and tungsten projects. The project benefits
from a granted mining lease and hosts over 80,000 tonnes of contained tin metal, alongside a globally
significant tungsten resource of 3.2 million metric tonne units of WO₃ within the same mineralised
system. The Australian Government recognised tungsten as a critical mineral in 2022 and included
Mount Lindsay in its Critical Minerals Prospectus.
Tin and tungsten prices continue to be supported by tightening global supply and renewed demand
from electronics, semiconductor and defence sectors. Critica continues to assess the underground,
low-impact development opportunity at Mount Lindsay and is undergoing a strategic review of
8
previous study work. We look forward to updating the market on the next phase of the project in the
coming quarter.
Corporate
Capital Position
As at 31 March 2026, the Group held cash and cash equivalents of $7.75m and ~$350k of (ASX:PLC)
shares.
The Company entered the March 2026 quarter with a strengthened balance sheet following the
completion of the A$8 million two-tranche placement. Tranche 2 was completed on 22 January 2026
through the issue of 92,321,731 fully paid ordinary shares at $0.026 per share, with 1:1 free-attaching
options exercisable at $0.043 per share with a two-year expiry. Directors participated in Tranche 2 on
the same terms, subscribing for 12,307,692 shares and receiving 12,307,692 attaching options, as
approved by shareholders on 15 January 2026.
Golden Grove North - Project Tenement Transaction
On 29 January 2026, Critica and Premier1 (ASX: PLC) executed an Agreement to acquire the remaining
30% (Earn-in interest increased 51% to 70% prior to sale) interest in the Golden Grove North Project
tenements for consideration of 32.4 million shares in Premier1 ~$350k. Under the agreement, Critica
retains rights to Rare Earths across the relevant tenements (E59/2243, E59/2244, E59/2288 and
E59/2506).
Investor Engagement
The Company continued its active investor engagement programme during the quarter. Investor
relations activities are coordinated through Investability Partners (Dannika Warburton,
investors@investability.com.au). Investors are encouraged to register at Critica’s Interactive Investor
Hub to receive updates and engage directly with the investor relations team.
Planned Work Programs - June 2026 Quarter
During the June 2026 quarter, Critica expects to advance the following key workstreams:
Resource & Drilling
• Continue and complete resource upgrade drilling at Jupiter (~140-hole programme) and
receive assay results
• Progress SRK Consulting’s updated Mineral Resource model incorporating new drilling data
into the Scoping Study
• Complete regional drilling at Juno (~30 holes) and Aurora (~28 holes) and receive results
9
Metallurgy & Processing
• Advance further optimisation of the MREC and MREO product specifications across ANSTO,
Minutech – AMML and Phenikaa University
• Progress beneficiation pilot operations at GAVAQ toward completion and receipt of decision-
grade datasets
• Continue development and preparation of representative carbonate and oxide product
samples for qualification with downstream separation and refining partners
• Prepare and dispatch additional ~20,000 kg bulk sample for pilot-scale treatment to support
ongoing optimisation, performance improvement and intermediate concentrate generation
• Refine reagent consumption, recovery and impurity management across the processing
flowsheet
Scoping Study
• Progress Scoping Study
• Integrate drilling, resource, beneficiation and hydromet data into study engineering
workstreams
• Evaluate processing pathways and optimisation opportunities as part of study development
• Advance offtake and strategic partnership discussions
Additional Information Required by ASX Listing Rule 5.3
Critica notes the following aggregate payments during the quarter:
• A$1,253k on exploration activities (refer to Item 1.2(a) of Appendix 5B), relating to drilling
activities, Jupiter metallurgical test work, studies, tenement fees and rates, and geological staff
costs (ASX Listing Rule 5.3.1)
• There were no mining or development activities during the quarter (ASX Listing Rule 5.3.2)
• A$74k in aggregate of payments made to related parties or their associates (refer to Item 6.1
of Appendix 5B) including Directors’ fees, salaries and superannuation (ASX Listing Rule 5.3.5)
Glossary of Terms
• TREO (Total Rare Earth Oxides): Sum of all rare earth oxide content in a sample, representing
the sum of 14 rare earth elements (excluding promethium) plus yttrium, expressed as oxides.
• MagREO (Magnet Rare Earth Oxides): The sum of neodymium (Nd₂O₃), praseodymium
(Pr₆O₁₁), dysprosium (Dy₂O₃) and terbium (Tb₄O₇), expressed as oxides. Primary value drivers
for permanent magnets used in electric vehicles, renewables and defence.
• MREC (Mixed Rare Earth Carbonate): A conventional intermediate product in the rare earth
supply chain, supplied to separation plants for further refining. Critica produced its first
commercial-quality MREC at 58% TREO at ANSTO in February 2026.
10
• MREO product (Mixed Rare Earth Oxide): A high-grade oxide intermediate produced via the
acid-bake route. Critica produced MREO products grading 84% TREO and 86% TREO in prior
quarters (refer to ASX announcements dated 28 October 2025 and 2 December 2025).
• MREP (Mixed Rare Earth Products): Critica’s collective term covering both Mixed Rare Earth
Carbonate (MREC) and Mixed Rare Earth Oxide (MREO) product specifications.
• Beneficiation: Physical upgrading of ore by rejecting waste material (quartz, feldspar, iron
oxides) while concentrating the valuable rare earth minerals, typically ahead of
hydrometallurgical treatment.
• EIS (Exploration Incentive Scheme): WA Government co-funded drilling programme that
reimburses up to 50% of eligible drilling and mobilisation costs for qualifying exploration
programmes.
• Inferred Mineral Resource: A Mineral Resource for which quantity and grade are estimated
with a low level of confidence under the JORC Code (2012). Targeted for conversion to
Indicated classification through the current drilling programme.
• Indicated Mineral Resource: A Mineral Resource estimated with sufficient confidence to
support mine planning. A higher JORC Code classification than Inferred.
• Scoping Study: A preliminary economic and technical assessment of the viability of a mining
project, conducted prior to a Pre-feasibility Study.
Authorised by the Board of Critica Limited.
Critica (ASX: CRI) is
rapidly advancing the
Jupiter Project in WA,
Australia’s largest clay-
hosted rare earth
resource, with a mine-
to-magnet plan to meet
surging AI, EV,
renewables and
defence demand.
Jacob Deysel
Chief Executive Officer
Critica Limited
admin@critica.limited
Investor and Media Relations
Dannika Warburton
Investability Partners
investors@investability.com.au
JOIN CRITICA’S INTERACTIVE INVESTOR HUB
Sign up and engage with our investor relations team
11
Competent Persons Statement
The information in this report that relates to exploration results including geology interpretation, data
preparation and data quality is based on work compiled by Dr. Stuart Owen who is a Member of the Australian
Institute of Geoscientists. Dr. Owen is a permanent employee of Critica Limited and has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Dr. Owen consents to the
inclusion in the report of the matters based on his information in the form and context in which they appear.
The information in this announcement that relates to previous exploration results for the Projects is extracted
from the following ASX announcements:
• Critica Commences Resource & Regional Drilling at Jupiter - 25 February 2026
• Critica Produces First Commercial-Quality MREC from Jupiter at ANSTO - 16 February 2026
• Second High-Grade Mixed Rare Earth Product Achieves 86% TREO - 2 December 2025
• Critica Advances Jupiter Flowsheet - Gallium Demonstrated as a Valuable By-Product - 10 November
2025
• Jupiter Delivers First High-Grade (84% TREO) Mixed Rare Earth Product - 28 October 2025
• Driving Innovation: R&D Funding and CRC Partnership - 14 October 2025
No new Mineral Resource information is contained in this report. Information in this report which refers to
Mineral Resources for the Jupiter Project in Western Australia is taken from the Company’s ASX disclosures dated
11 February 2025, 13 August 2025 and 10 November 2025 at www.critica.limited. The disclosure fairly represents
information compiled by Mr Rodney Brown, a Member of the Australasian Institute of Mining and Metallurgy
and an employee of SRK Consulting (Australia) Pty Ltd, independent of Critica Limited and without conflict of
interest.
The information in this report that relates to Mineral Resources for the Mount Lindsay Projects is based on
information compiled by Dr. Stuart Owen who is a Member of the Australian Institute of Geoscientists. Dr. Owen
is a permanent employee of Critica Limited. Dr Owen has sufficient experience which is relevant to the style of
mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as
a Competent Person as defined in the 2004 and 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Dr Stuart Owen consents to the inclusion in the report
of the matters based on his information in the form and context in which it appears. This information was
prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC
Code 2012 on the basis that the information has not materially changed since it was last reported.
The Company confirms that all material assumptions and technical parameters underpinning the Mineral
Resources Estimates referred to within previous ASX announcements remain current and have not materially
changed since last reported. The Company is not aware of any new information or data that materially affects
the information included in this announcement. The Company confirms that the form and context in which the
Competent Person’s findings are or were presented have not been materially modified.
12
Appendix A: Tenement Register
Mining Tenements Held at End of March 2026 Quarter
Project Location Tenement Interest at end of March 2026
Brothers Western Australia E59/2710 100%
Brothers Western Australia E59/2711 100%
Brothers Western Australia E59/2819 100%
Brothers Western Australia E59/2821 100%
Brothers Western Australia E59/2827 100%
Brothers Western Australia E59/2889 100%
Brothers Western Australia E59/2890 100%
Brothers Western Australia E59/2907 100%
Brothers Western Australia E59/2927 100%
Brothers Western Australia E59/2928 100%
Brothers Western Australia E59/2930 100%
Brothers Western Australia E59/2977 100%
Brothers Western Australia E58/629 100%
Jupiter Western Australia E59/2421 100%
Jupiter Western Australia E59/2463 100%
Mount Lindsay Tasmania 3M/2012 100%2
Mount Lindsay Tasmania 7M/2012 100%
Mount Lindsay Tasmania EL21/2005 100%
Mount Lindsay Tasmania EL12/2022 100%
Kulin Western Australia E70/5077 100%1
1
Farm-in Agreement with Ausgold Limited.
2
Livingstone Mining Licence in the process of being converted to a Retention Licence (RL1/2024) with Minerals
Resources Tasmania.
Mining Tenements Acquired or Disposed During the March 2026 Quarter
Project Location Tenement
Interest at beginning of
Quarter
Interest at end of Quarter
Golden Grove
North
Western
Australia
E59/2243 70% -
Golden Grove
North
Western
Australia
E59/2244 70%
-
Golden Grove
North
Western
Australia
E59/2285 70%
-
Golden Grove
North
Western
Australia
E59/2288 70%
-
13
Project Location Tenement
Interest at beginning of
Quarter
Interest at end of Quarter
Golden Grove
North
Western
Australia
E59/2506 70%
-
Golden Grove
North
Western
Australia
E59/1989 29%
-
Mount Lindsay Tasmania EL12/2022 100% -
Brothers
Western
Australia
E59/2820 100% -
Beneficial Percentage Interests in Joint Venture Agreements at End of Quarter
Project Location Tenement Interest at beginning of Quarter Interest at end of Quarter
Nil
Beneficial Percentage Interests in Farm-in or Farm-out Agreements
Project Location Tenement
Interest at beginning of
Quarter
Interest at end of Quarter
Kulin (Farm-in
with Ausgold)
Western
Australia
E70/5077 100% 100%
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Critica Limited
ABN Quarter ended (“current quarter”)
51 119 678 385 31 March 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(1,253) (2,867)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (260) (759)
(e) administration and corporate costs (396) (1,181)
1.3 Dividends received (see note 3) - -
1.4 Interest received 35 60
1.5 Interest and other costs of finance paid (1) (5)
1.6 Income taxes paid - -
1.7 Government grants, tax incentives and
associated costs
(94) 912
1.8 Other - -
1.9 Net cash from / (used in) operating
activities
(1,969) (3,840)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment - (4)
(d) exploration & evaluation - -
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets (Riley) - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other - -
2.6 Net cash from / (used in) investing
activities
- (4)
3. Cash flows from financing activities
2,720 7,986
3.1 Proceeds from issues of equity securities
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(193) (541)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
2,527 7,445
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
7,193 4,150
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(1,969) (3,840)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
- (4)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
2,527 7,445
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report