October 2026 Ignite Investment Summit Investor Presentation
Released
Released
Announcement PDF
One Critical Minerals Platform
Jacob Deysel | CEO
Ignite Investment Summit | Hong Kong | 14–15 October 2026
ASX: CRI
Two strategic Australian projects. Multiple pathways to value.
Tungsten | Tin | Rare Earths + Yttrium | Gallium
2
Disclaimer
Authorised by the Board of Critica Limited
This Presentation (Presentation) has been prepared by Critica Limited (CRI or the Company)
and is authorised by the Board of CRI. The information contained in this Presentation is a
professional opinion only. Certain information in this Presentation has been derived from third
parties and though CRI has no reason to believe that it is not accurate, reliable or complete, it
has not been independently audited or verified by CRI.
This Presentation contains general and background information about CRI’s current activities
as at the date of this Presentation and should not be considered to be comprehensive or to
comprise all the information that an investor should consider when making an investment
decision. CRI is not responsible for providing updated information and assumes no
responsibility to do so. Recipients should conduct their own investigations and perform their
own analysis of the information, statements and opinions contained and this Presentation
should be read in conjunction with CRI’s other periodic and continuous disclosure
announcements lodged with the ASX.
This Presentation is for information purposes only. Neither this nor the information contained in
it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or
sale of CRI shares in any jurisdiction. This Presentation is not investment advice or a
recommendation to acquire CRI securities and has been prepared without taking into account
the recipient's investment objectives, financial circumstances or particular needs. Recipients
should seek professional advice before deciding if an investment is appropriate.
All securities transactions involve risks, which include (among others) the risk of adverse or
unanticipated market, financial or political developments.
To the fullest extent permitted by law, CRI, its officers, employees, related bodies corporate,
agents and advisers expressly disclaim, to the maximum extent permitted by law, all liabilities
(however caused, including negligence) in respect of, make no representations regarding, and
take no responsibility for, any part of this Presentation and make no representation or warranty
as to the currency, accuracy, reliability or completeness of any information, statements,
opinions, conclusions or representations contained in this Presentation. No responsibility for
any errors or omissions from this arising out of negligence or otherwise is accepted.
Any forward-looking statements and forward-looking information included in this Presentation
involve subjective judgment and analysis and are subject to uncertainties, risks and
contingencies, many of which are outside the control of, and may be unknown to, CRI. In
particular, they speak only as of the date of this Presentation, they assume the success of
CRI’s strategies, and they are subject to significant regulatory, business, competitive and
economic uncertainties and risks. Actual future events may vary materially from the forward-
looking statements and forward-looking information and the assumptions on which they are
based. Recipients of this Presentation are cautioned to not place undue reliance on such
forward-looking statements and forward-looking information.
Basis of Preparation
The Mt Lindsay Scoping Study is a preliminary technical and economic study that is not
sufficient to support the estimation of Ore Reserves or to provide assurance of an economic
development case. No Ore Reserve has been declared. The Scoping Study cautionary
statement, production target basis and funding disclosure are set out in full on the following
page and in the Company’s ASX announcement dated 29 September 2026.
Competent Persons Statements
The information in this Presentation that relates to exploration results including geology interpretation,
data preparation and data quality is based on work compiled by Dr. Stuart Owen who is a Member of the
Australian Institute of Geoscientists. Dr. Owen is a permanent employee of Critica Limited and has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (JORC Code). Dr. Owen consents to the inclusion in the Presentation of the matters based
on his information in the form and context in which they appear.
The information in this Presentation that relates to the Mineral Resource estimates for Mt Lindsay is
based on, and fairly represents, information and supporting documentation prepared by Dr. Stuart
Owen who is a member of the Australian Institute of Geoscientists. The information includes the mining
and metallurgical assumptions used in reporting the Mineral Resource. Dr. Owen has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration, and to
the activity he is undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the
JORC Code. Dr Owen consents to the inclusion in the Presentation of the matters based on his
information in the form and context in which they appear.
The information in this Presentation that relates to previously reported Exploration Results and
metallurgical test work has been extracted from the Venture Minerals Limited ASX announcements
“Record Breaking Drill Intersection at Mount Lindsay - 147 metres @ 1.0% Tin” dated 16 December 2021
and “Pilot Scale Metallurgy Confirms Excellent Recoveries at Mt Lindsay” dated 31 August 2012. Critica
confirms that it is not aware of any new information or data that materially affects the information
included in those announcements and that the form and context in which the Competent Person's
findings are presented have not been materially modified from those announcements.
The information in this Presentation that relates to the Mt Lindsay Mineral Resource estimate has been
extracted from the Company’s ASX announcement “Critica Updates Mt Lindsay Tin-Tungsten Mineral
Resource to JORC 2012” dated 14 September 2026 (for which the Competent Person was Dr. Stuart
Owen), and the information relating to the Mt Lindsay Scoping Study has been extracted from the
Company’s ASX announcement dated 29 September 2026. Critica confirms that it is not aware of any
new information or data that materially affects the information included in those announcements and
that all material assumptions and technical parameters underpinning the mineral resource estimates,
financial forecasts and the production target continue to apply and have not materially changed. Critica
confirms that the form and context in which the Competent Person’s findings have not been materially
modified from the relevant announcement.
Copies of the announcements are available at www.asx.com.au (ASX: CRI) or www.critica.limited. The
Scoping Study technical work, including the underground mine design, mine schedule, processing
flowsheet, infrastructure concept and capital and operating cost estimates, was prepared by DRA
Global.
critica.limited
ASX:
CRI
October
2026
3
Disclaimer (continued)
Authorised by the Board of Critica Limited
Basis of Preparation: Jupiter Project
No Scoping Study has been completed for the Jupiter Project. References to a Jupiter development
pathway are aspirational and do not imply economic viability (and Critica does not yet have reasonable
grounds to believe the aspirational statements can be achieved). The Jupiter Mineral Resource
comprises Indicated and Inferred Mineral Resources and no Ore Reserve has been declared.
Metallurgical results are from testwork to date; applicability across the deposit and at commercial
scale remains to be demonstrated.
Competent Persons Statement: Jupiter Project
The information in this report that relates to exploration results including geology interpretation, data
preparation and data quality is based on work compiled by Dr. Stuart Owen who is a Member of the
Australian Institute of Geoscientists. Dr. Owen is a permanent employee of Critica Limited and has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (JORC Code). Dr. Owen consents to the inclusion in the presentation of the matters based
on his information in the form and context in which they appear.
The information in this Presentation that relates to the Jupiter Mineral Resource Estimate has been
extracted from the Company’s ASX announcement “Jupiter Delivers First 160 Mt Indicated Mineral
Resource” dated 12 October 2026, which supersedes the maiden Jupiter Mineral Resource announced
on 11 February 2025. The Competent Person for the Mineral Resource Estimate is Mr Rodney Brown of
SRK Consulting (Australasia) Pty Ltd, with Dr Stuart Owen and Dr Natalee Bonnici as Competent
Persons for exploration results, data compilation and data quality. A copy of the announcement is
available at www.asx.com.au (ASX: CRI) or www.critica.limited.
Critica confirms that it is not aware of any new information or data that materially affects the
information included in that announcement and, in relation to the estimate of Mineral Resources, that
all material assumptions and technical parameters underpinning the estimate continue to apply and
have not materially changed. Critica confirms that the form and context in which the Competent
Persons’ findings are presented have not been materially modified from the original market
announcement.
The Information in this presentation relates to previous exploration results and metallurgical results
extracted from the following ASX announcements:
• 12 October 2026 – Jupiter Delivers First 160Mt Indicated Mineral Resource
• July 2026 - Critica Confirms High-Grade Rare Earth Zones at Jupiter
• 27 May 2026 - Jupiter Pilot Plant Delivers 14x Rare Earth Upgrade
• 20 May 2026 - Critica Secures $300,000 MRIWA and RTCM Trailblazer Funding
• 18 May 2026 - Critica Produces 97% TREO Third MREO from Jupiter
• 5 May 2026 - Critica Appoints DRA Global for Mt Lindsay Underground Scoping Study
• 14 April 2026- Jupiter Pilot Plant Recovery Improves to 81% MagREO
• 16 February 2026 – Critica Produces First MREC from Jupiter at ANSTO
• 2 December 2025 – Second High-Grade MREP Shows Strong Magnet REE & Y Grades
• 17 November 2025 – Critica’s MREP Flowsheet Achieves 63% Gallium Leach Recovery
• 28 October 2025 – Jupiter Delivers First High Grade 84% TREO MREP
• 29 September 2025 – Consistent Bulk Sample Results Strengthen Jupiter Pathway
• 1 September 2025 - Critica to produce high-grade REE concentrate at pilot plant
• 26 August 2025 - ANSTO & Minutech engaged to produce first MREC from Jupiter
• 13 August 2025 – Jupiter Confirmed as Australia’s Largest MREO Clay Resource
• 16 July 2025 – Critica Advances Jupiter – Outstanding Magnet and HREO Grades
• 28 May 2025 – Critica Commences Bulk Metallurgical Testwork
• 5 May 2025 – Drilling Targets Restricted Heavy REE at Satellite Prospects
• 11 February 2025 – Jupiter Maiden Resource – Australia’s Largest Clay Hosted
• 23 January 2025 – First Pass Metallurgical Testwork Delivers 830% REE Upgrade
Critica confirms that it is not aware of any new information or data that materially affects the
exploration results and metallurgical results information included in those announcements and that the
form and context in which the Competent Person’s findings are presented have not been materially
modified from those announcements. The Competent Person for relevant exploration results and
metallurgical results in those announcements was Dr Stuart Owen. Copies of the announcements are
available at www.asx.com.au (ASX: CRI) or www.critica.limited.
critica.limited
ASX:
CRI
October
2026
4
Scoping Study Cautionary Statement
Authorised by the Board of Critica Limited
Scoping Study cautionary statement
The Scoping Study referred to in this Presentation has been undertaken to determine the potential
viability of developing the Mt Lindsay Tungsten-Tin Project in north-west Tasmania. It is a preliminary
technical and economic study based on low-level technical and economic assessments that are not
sufficient to support the estimation of Ore Reserves or to provide assurance of an economic
development case at this stage.
Further exploration, evaluation, engineering, metallurgical, environmental, permitting, approvals,
funding, offtake and commercial work is required before Critica will be in a position to assess
whether it is possible to estimate any Ore Reserves or assess whether Critica may be able to provide
any assurance of an economic development case. The Company has concluded that it has a
reasonable basis for disclosing the production target and forecast financial information, based on
the material assumptions, modifying factors and technical information summarised in its ASX
announcement dated 29 September 2026. However, there is no certainty that the assumptions will
be correct or that the outcomes indicated by the Scoping Study will be achieved. Investors should
not make investment decisions based solely on the results of the Scoping Study.
Production target and Mineral Resources
No Ore Reserve has been declared for the Mt Lindsay Project. The Scoping Study production target
is based solely on part of the Main and No.2 deposits within the updated JORC 2012 Mineral
Resource Estimate (refer ASX Announcement “Critica Updates Mt Lindsay Tin-Tungsten Mineral
Resources to JORC 2012”, 14 September 2026. The production target comprises approximately 10.9
Mt of scheduled run-of-mine material, of which approximately 92% is derived from Indicated Mineral
Resources and approximately 8% is derived from Inferred Mineral Resources, after applying mining
modifying factors.
There is a low level of geological confidence associated with Inferred Mineral Resources and there is
no certainty that further exploration work will result in the determination of Indicated Mineral
Resources or that the production target itself will be realised. The Inferred Mineral Resources
underpin approximately 8% of the production target and are predominantly scheduled in later years
of the mine plan, with only limited inferred material scheduled in earlier years. The Company has
concluded that the Inferred component is not a determining factor in the viability of the development
scenario and that the Scoping Study does not depend on Inferred Mineral Resources.
Funding
The Scoping Study estimates pre-production capital of approximately A$244.5 million, before taking into
account sustaining capital or any additional funding requirements that may arise in connection with working
capital, financing or other development requirements. Critica has not secured any of the funding required to
develop the Project. The pre-production capital requirement is substantial relative to the Company’s current
market capitalisation and existing financial resources, and the Company would need to obtain substantial
additional external funding to develop the Project.
There are risks that the Company will not be able to raise that amount of funding when needed, or at all. Any
future funding may include (without limitation) one or a combination of debt, equity, strategic partner,
offtake-linked, joint venture, partial sale or other commercial arrangements. If equity funding is required,
existing shareholders may be diluted or their interests may otherwise be affected.
Assumptions and accuracy
The Scoping Study outcomes, production target and forecast financial information are based on the material
assumptions and modifying factors set out in the Company’s ASX announcement dated 29 September 2026,
including mine design, processing, metallurgical recoveries, capital and operating costs, commodity prices,
exchange rates, approvals and funding. Capital and operating cost estimates carry an overall accuracy range
of approximately -25% to +50%.
Base Case processing recoveries of 75% tin, 85% WO₃ and 98% magnetite are modestly above recoveries
demonstrated or estimated in individual historical testwork programs and have not all been demonstrated
simultaneously in a single integrated locked-cycle test program. They remain subject to further metallurgical
validation, variability testing and optimisation.
Given the uncertainties involved, investors should not make investment decisions based solely on the results
of the Scoping Study.
critica.limited
ASX:
CRI
October
2026
5
critica.limited
ASX:
CRI
October
2026
C R I T I C A
The Critica Investment Case
Two strategic projects. Multiple critical minerals. Multiple demand drivers. Multiple pathways to value.
MT LINDSAY
TUNGSTEN + TIN
SCOPING STUDY
DELIVERED
A$1.01bn2
After-tax NPV₈
55.6%
After-tax IRR
ECONOMICS DEMONSTRATED
• Scoping Study delivered
• Strong NPV, IRR and rapid payback
• Advancing feasibility, offtake and partners
JUPITER
RARE EARTHS + Y + Ga
SCOPING STUDY
NEXT
1.7Bt1
Mineral Resource
160Mt
Indicated Resource
RESOURCE SCALE DEMONSTRATED
• Beneficiation first: ~95% mass rejection with up to 14x grade uplift
• Commercial-grade products produced: MREC 58% TREO • MREO 97%
TREO
• Multiple critical minerals: Magnet + heavy REEs, yttrium and gallium
100% OWNED AUSTRALIAN ASSETS • STRATEGIC CRITICAL MINERALS • MULTIPLE NEAR-TERM CATALYSTS
¹ Jupiter Mineral Resource: 160Mt Indicated and 1.5Bt Inferred, for a total Mineral Resource of 1.7Bt at 1,700ppm TREO (1,000ppm TREO cut-off). Refer Critica Limited ASX announcement, “Jupiter Delivers First 160 Mt Indicated
Mineral Resource”, dated 12 October 2026.² Mt Lindsay Scoping Study: All Mt Lindsay economic and development metrics are Scoping Study estimates. Refer Critica Limited ASX announcement, “Mt Lindsay Scoping Study”, dated 29
September 2026, and the Scoping Study Cautionary Statement in this Presentation.
5
A$244.5m
Pre-production capital
~1.9 YEAR PAYBACK SCOPING STUDY → NEXT MAJOR CATALYST
1,700ppm TREO • 1,000ppm TREO cut-off
6
critica.limited
ASX:
CRI
October
2026
C R I T I C A
Why Critica Matters Now
Critical mineral supply is concentrated. Demand is strategic. New Western supply is required.
THE SUPPLY PROBLEM
China dominates processing and
refining across the minerals
Critica is targeting.
~99% Gallium supply1
~90% Rare earth processing2
~80% Tungsten &
downstream1
~45% Refined tin supply3
DEMAND + DIVERSIFICATION
Strategic demand is broadening
across four major end markets.
DEFENCE Tungsten + magnet REEs
AI + DATA
CENTRES
Tin + rare earths
ADVANCED
MANUFACTURING
Tungsten + tin
ELECTRIFICATION Magnet rare earths
Rare earth supply needs to grow
materially by 2040, with new projects
required to diversify supply.2
CRITICA'S RESPONSE
Two Australian projects exposed to
the exact supply chains the West is
trying to secure.
JUPITER | WA
Rare earths • Yttrium • Gallium
1.7Bt Resource • 160Mt Indicated
Beneficiation + commercial-grade MREC/MREO
MT LINDSAY | TAS
Tungsten • Tin
Scoping Study delivered
A$1.01bn after-tax NPV₈ • 55.6% IRR
THE INVESTMENT THESIS: CONCENTRATED SUPPLY + STRATEGIC DEMAND + TWO AUSTRALIAN PROJECTS WITH
DISTINCT VALUE DRIVERS
Sources: ¹ USGS, Mineral Commodity Summaries 2026 / China Mineral Industry data. ² IEA, Global Critical Minerals Outlook 2026. ³ International Tin Association / Project Blue market estimates. ⁴ Reuters, “How obscure yttrium became a global flashpoint”,
13 September 2026. Project data: Critica ASX announcements.
~93% Yttrium supply4
7
critica.limited
ASX:
CRI
October
2026
C R I T I C A
Policy and Price Are Re-Rating Critical Minerals
Government intervention is accelerating as strategic supply constraints support stronger commodity pricing
COMMODITY MARKETS ARE RESPONDING
Three price signals reinforce the strategic-demand
story.
RARE EARTHS (NdPr) ~1.8× since January 20264
Policy support + tightening supply
TUNGSTEN (WO₃) ~6.5× year on year5
Export controls + defence / industrial demand
TIN (Sn) ~3× from 2022 lows6
Supply disruption + AI / data-centre demand
Not a single-commodity thesis.
Critica has exposure across multiple minerals and multiple end markets.
POLICY SUPPORT + TIGHTER SUPPLY + STRONGER PRICING = A MORE SUPPORTIVE BACKDROP FOR CRITICA
Sources: ¹ US–Australia Framework for Securing Supply in Critical Minerals and Rare Earths, Oct 2025; ² Australian Government, Critical Minerals Strategic Reserve, Jan 2026; ³ Chinese critical-mineral export control announcements, 2023–25; ⁴ SMM NdPr oxide market data, Sep
2026; ⁵ Argus/Fastmarkets European APT market data, Sep 2025–Sep 2026; ⁶ LME tin cash settlement data, Oct 2022–Sep 2026.
POLICY IS MOVING FROM WORDS TO ACTION
Governments are increasingly acting to secure
critical-mineral supply chains.
US +
AUSTRALIA
Critical minerals supply framework1
Financing • offtake • permitting • potential price-
support mechanisms
AUSTRALIA A$1.2bn Strategic Reserve2
Rare earths and gallium among the initial priority
minerals
CHINA
Export controls have changed the
market3
Rare earths, gallium and tungsten increasingly
subject to strategic trade controls
Governments are no longer just identifying critical minerals;
they are actively intervening to secure supply.
8
One Platform, Two Strategic Australian Projects
critica.limited
ASX:
CRI
October
2026
C R I T I C A
ONE PLATFORM • TWO PROJECTS • TWO DIFFERENT VALUE DRIVERS • MULTIPLE CATALYSTS
Mt Lindsay: Figures are Scoping Study estimates (ASX, 29 September 2026), preliminary and subject to uncertainty; development remains subject to further studies, approvals, financing and a future Board decision. ¹ Jupiter: Mineral Resource of 160Mt
Indicated and 1.5Bt Inferred, for a total 1.7Bt at 1,700ppm TREO (1,000ppm TREO cut-off); refer ASX announcement “Jupiter Delivers First 160 Mt Indicated Mineral Resource”, dated 12 October 2026. Jupiter Scoping Study outcomes remain subject to
completion and announcement.
Mt Lindsay establishes the economic foundation. Jupiter adds scale and the next catalyst
WHAT EACH PROJECT CONTRIBUTES
MT LINDSAY
ECONOMIC FOUNDATION
Tungsten + tin • Tasmania
Scoping Study delivered → DFS / offtake / strategic partners
JUPITER
RESOURCE SCALE + NEXT CATALYST
Rare earths + Y + Ga • Western Australia
160Mt Indicated • 1.7Bt total Resource → Scoping Study next
TWO VALUE DRIVERS
MT LINDSAY
ECONOMICS DEMONSTRATED,
DFS NEXT
JUPITER
SCALE DEMONSTRATED,
SCOPING STUDY NEXT
Mt Lindsay Project
“One of Australia’s largest undeveloped Tungsten & Tin
resources”
Tungsten | Tin
9
10
Mt Lindsay: The Economics Speak for Themselves
Base Case Scoping Study figures prepared by DRA Global; refer ASX announcement 29 September 2026 and read with the cautionary statement and material assumptions in that announcement. NPV at an 8% discount rate; corporate tax
rate 30%. Concentrate payabilities assumed at 94% tin, 80% tungsten and 100% magnetite. Capital and operating cost estimates carry a Scoping Study accuracy range of approximately −25% to +50%. No Ore Reserve has been declared
and there is no certainty the production target or forecast financial information will be realised.
critica.limited
ASX:
CRI
October
2026
KEY SCOPING STUDY METRICS
A$1.42bn
Pre-tax NPV (8%)
A$1.01bn
After-tax NPV (8%)
55.6%
After-tax IRR
~1.9 yrs
Payback
A$3.11bn
LOM EBITDA
A$5.20bn
LOM sales revenue
KEY FINANCIAL ASSUMPTIONS: BASE CASE
Production target basis
1Mt average LOM run-rate
~92% Indicated and ~8% Inferred Mineral
Resources, after mining modifying factors.
Study author
C R I T I C A | M T L I N D S A Y
A$244.5m
Pre-production capital
4.1x
After-tax NPV / pre-prod capital
Assumption Base Case
Tin price US$45,000/t
Tungsten APT price US$2,500/mtu
Magnetite concentrate (65% Fe) US$115/dmt
Exchange rate (AUD:USD) 0.65
Discount rate 8%
Corporate tax rate 30%
Mt Lindsay is one of the largest undeveloped tungsten–tin assets in a tier 1 jurisdiction
A$2.67bn
Pre-tax LOM free cash flow
A$1.92bn
After-tax LOM free cash flow
US$314/mtu
Indicative tungsten operating cost*
*After tin and magnetite by-product credits;
derived non-IFRS measure, not C1 or AISC.
11
critica.limited
ASX:
CRI
October
2026
Concentrated Supply Is Driving a Structural Repricing
TUNGSTEN APT
US$2,500/mtu
SEPTEMBER BENCHMARK
US$3,000/mtu
~17% BELOW REFERENCED BENCHMARK
Concentrated mining and refining; strategic interest in secure,
non-Chinese supply.
Argus/Fastmarkets European APT market data, 1 Sep 2026
TIN
SCOPING STUDY BASE CASE
US$45,000/t
SEPTEMBER BENCHMARK
US$54,725/t
~18% BELOW REFERENCED BENCHMARK
Electronics and electrification demand alongside constrained,
exposed supply.
LME cash settlement, 1 Sep 2026
The assumptions are long-term assessment prices - not an extrapolation of current spot prices.
They reflect Critica’s view that structural supply constraints and strategic demand support longer-term pricing.
Source: Mt Lindsay Scoping Study, Commodity Price Assumptions. Mt Lindsay produces scheelite and tin concentrates; modelled revenue applies 80% tungsten and 94% tin payabilities, plus transport and selling
costs. Benchmarks are dated market references, not forecasts.
SCOPING STUDY BASE CASE
Base Case prices below September 2026 benchmarks, reflecting enduring supply constraints
C R I T I C A | M T L I N D S A Y
12
A Credible Development Pathway
critica.limited
ASX:
CRI
October
2026
Distance to the Port of Burnie per the Mt Lindsay Scoping Study (ASX announcement 29 September 2026). Tasmania’s electricity generation is predominantly hydroelectric; the Scoping Study assumes grid power as the primary electricity
supply, with connection capacity and commercial terms subject to confirmation. Named nearby operations are third-party mines cited for regional context only.
100% ownership and granted Mining
Lease
Established project ownership and mining
tenure
Established Mineral Resource
More than 88,000m of diamond drilling
and extensive technical work
Established mining district
Located near operating mines and
established mining services
Existing infrastructure and access
Road access, nearby power infrastructure
and regional rail
Established export infrastructure
Port of Burnie approximately 120 km by
road
◈
100%
Ownership and granted Mining
Lease
88,000m
Diamond drilling completed
Hydro
Predominantly renewable
Tasmanian grid
120km
By road to Port of Burnie
Key foundations already in place to advance Mt Lindsay towards a DFS
~ 120km
C R I T I C A | M T L I N D S A Y
13
An Established Resource Underpins Development
critica.limited
ASX:
CRI
October
2026
C R I T I C A | M T L I N D S A Y
PLAN VIEW OF THE MAIN AND NO.2 MINERALISED SYSTEMS
14.3 Mt ~32 kt
~23 kt ~92%
Main and No. 2
Mineral Resource
Production target
from Indicated
Mineral Resources
Contained WO₃
Contained tin
Supported by more than 88,000 m of
diamond drilling
Additional Mineral Resources lie
outside the current Scoping Study
focus, providing opportunities for
further evaluation
The Main and No. 2 deposits represent 75% of Mt Lindsay’s total Mineral Resource
14
A Defined Underground Mining Concept
*Conceptual arrangement of the Mt Lindsay underground development showing the Main Skarn and No. 2 Skarn mineralised systems beneath surface, underground access from the existing HEC Quarry area, and the relationship to the
proposed conveyor, processing plant, tailings storage and existing infrastructure. The concept illustrates how underground mine access and surface infrastructure are being considered together to maximise the use of existing disturbed
areas and minimise new surface disturbance. Final locations and configurations remain subject to further engineering, environmental assessment and regulatory approvals. Refer ASX announcement 29 September 2026.
Defined underground access
Proposed decline from a portal within
the existing HEC quarry
Integrated site layout
Underground conveyor connecting the
mine to the proposed processing
plant, approximately 600 m from the
portal
Designed Around Existing
Disturbance
Proposed infrastructure designed
around existing disturbed areas, with
potential underground tailings backfill.
critica.limited
ASX:
CRI
October
2026
C R I T I C A | M T L I N D S A Y
1.0 Mtpa
Proposed mining rate
13.5 years
Mining schedule
11.6 years
Processing life
10.9 Mt
Material processed
A 1.0 Mtpa low-impact underground operation leveraging existing infrastructure
A$244.5m to Production | 4.1x Capital Value
C R I T I C A | M T L I N D S AY
A$244.5m
Pre-production capital
A$197.3m
Sustaining capital + closure
A$441.8m
Total LOM capital
4.1x
After-tax NPV / pre-prod
capital
Capital estimates from the Mt Lindsay Scoping Study (DRA Global), at Scoping Study accuracy of approximately −25% to +50%. Excludes working capital and financing costs. Refer ASX announcement 29 September 2026.
15
critica.limited
ASX:
CRI
October
2026
PRE-PRODUCTION CAPITAL TOTAL LIFE-OF-MINE CAPITAL
A$244.5m A$441.8m
Mine
development
A$122.0m
Processing &
infrastructure
A$94.0m
Contingency A$28.5m
Pre-production A$244.5m
Sustaining capital A$177.3m
Mine closure A$20.0m
After-tax NPV of 4.1 times pre-production capital
From Scoping Study to First Production
2026
H1 H2
2027
H1 H2
2028
H1 H2
2029
H1 H2
Scoping Study Definitive Feasibility Study (18 months)
Environmental Assessment and Permitting (parallel)
Construction, Commissioning and Ramp-up
Final Investment
Decision (FID)
mid-2028
First Production
end 2029
1 Definitive Feasibility Study
H2 2026 – H1 2028
• Optimise design, costs and schedule
• Advance offtake and financing
discussions
• Refine environmental and social
studies
2 Progress permitting
Share your feedback