Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
Wednesday, 31 July 2024
June 2024 Quarterly Activities Report
HIGHLIGHTS
Management and Board Changes
• Venture Minerals refreshes board and management.
• Ms Philippa Leggat appointed as new Managing Director.
• Mr Tim Lindley appointed as new Non-Executive Chairman.
• Mr Nick Cernotta appointed as new Non-Executive Director.
New Strategy Released
• Focus on projects with best potential to deliver shareholders value and rationalise portfolio.
• Jupiter clay-hosted, rare earth discovery in Western Australia confirmed as Flagship and
primary focus.
• 100% of Jupiter and the Brothers Project secured from joint venture partner.
• Strategy validated by institutional investors through participation in $6m placement.
Cornerstone investments include:
o North Star Impact Fund committed $2.5m
o Lion Selection Group (ASX: LSX) committed $1.0m
• 18 Months of funding will allow Venture to focus on two major objectives for Jupiter
o Maiden Resource Estimate with initial metallurgy – Q4 2024
o Resource Upgrade with more advanced metallurgy
Progress at Flagship project, Jupiter clay-hosted, rare earth discovery in WA
• Resource drilling program of 258 drill holes for 22,000 metres confirmed broad zones of
continuous, high-grade mineralisation across entire 40km2 area:
o +2,000ppm Total Rare Earth Oxides (TREO) over 20m – 30m widths within
o +1,000ppm TREO c. 80m widths
o 23% Magnet Rare Earths Oxides (MREO) in +1,000ppm material
o Very low thorium and uranium
o Drilling density at 500m x 250m across entire area
o Outstanding results include numerous record intercepts
Sale of Riley Iron Ore Mine
• Sold Venture’s wholly owned subsidiary, Venture Iron Pty Ltd which is the holder of the Riley
Iron Ore Mine (Riley), to Gold Valley Brown Stone.
• Completion of Riley sale added $3m to cash reserves, with return of the environmental bond
of $0.6m awaited.
Corporate
• Cash Position of $1.6 million as at 30 June 2024 (pre capital raising).
• Raise $0.7m from utilisation of At-the-Market facility with Acuity Capital.
• Capital Raise of $6M, placement to institutional and sophisticated investors (post quarter).
• $3m from sale of Riley Iron Ore Mine received (post quarter).
Venture Minerals Limited | ASX: VMS/VMSO
Level 2, 16 Altona Street, West Perth, Western Australia
T: + 61 8 6279 9428 | F: + 61 8 6500 9986 | admin@ventureminerals.com.au |
www.ventureminerals.com.au
ASX: VMS
Management and Board Changes
During the quarter, the Company announced the appointment of new board members and a Managing
Director.
Non-Executive Director Philippa Leggat was appointed as new Managing Director
Ms Leggat joined the board as a non-executive director in late 2023 and lead a board renewal process. Ms
Leggat is a mineral industry executive with over 20 years of experience in advancing domestic and
international projects along the value chain. She has served as an executive director and advisor to ASX
listed companies engaged in capital raising, exploration, development and project evaluation. Ms Leggat
has a track record of negotiating value accretive project acquisitions, identifying and communicating an
organisation’s competitive advantages to raise its profile.
Non-Executive Chair, Tim Lindley
Mr Lindley is an experienced board director and previous investment banker who brings a proven track
record in equity raising, project finance, debt, and M&A. During his 25-year executive career, Mr. Lindley
has held several senior and executive roles in both Australia and internationally, including Country Head
(Australia) of Barclays Bank and a Managing Director of Morgan Stanley (Australia). Mr Lindley has led and
completed more than 100 capital-raising transactions for Australian resource companies operating across
jurisdictions around the globe.
Non-Executive Director, Nick Cernotta
Mr Cernotta is an engineer with over 30 years of professional operations and international management
experience in the resources sector. More recently his focus has shifted to corporate strategy and growth in
new and evolving energy transition supply markets. Mr Cernotta has previously held Director-level roles in
other ASX listed companies with exposure to offtake arrangements, joint ventures and partnering
arrangements across a range of commodities.
Mr Radonjic tendered his resignation as Managing Director on 20 May 2024.
Page |
Page 2
2
Jupiter Clay-Hosted Rare Earths Project, Western Australia.
(part of the broader Brothers Project)
Activities during the June Quarter
During the quarter, Venture announced assay results from the initial resource definition drill program
at the large-scale, clay-hosted Jupiter REE project. The 246 hole Air Core drilling program was
completed well ahead of schedule, and brings the average drill spacing down to 250m x 500m across
the 40km2 Jupiter target suitable for initial resource estimation work that is planned for release in Q4
2024.
Assay results from the initial resource definition drill program confirm broad widths of >1,000ppm TREO
mineralisation, and results at the end of the June quarter delivered six of the top 13 drill intersections
(BRAC092, 91, 93, 96, 97 and 114) at date of announcement, several of which have since been
superseded. The drilling has delivered significant high-grade zones with the announced +2,000ppm
TREO thickness averaging c. 20m and locally up to 60m, within broader zones up to of up to 80m
thickness grading well over 1,000ppm TREO. The drilling shows REE mineralisation over the entire
40km2 geophysical target, and validates the extent of the Jupiter alkaline intrusion beneath the clayhosted REE mineralisation. Magnet Rare Earth Oxides (MREO) average 23% for intersections with
>1,000ppm TREO, and peak at 30% of TREO. High-grade highlights during the June quarter include
results such as 16 m @ 3,526ppm TREO (BRAC165) and 7m @ 5,039ppm TREO (BRAC068). Other
notable results from the program include several intersections grading:
• over 1,000ppm Nd2O3 (Neodymium) up to 3,824ppm,
• over 300ppm Pr6O11 (Praseodymium) up to 1,232ppm,
• over 50ppm Dy2O3 (Dysprosium) up to 674ppm,
• over 10ppm Tb2O3 (Terbium) up to 101ppm, and
• over 100ppm Sm2O3 (Samarium) up to 389ppm.
Thorium and uranium levels remain consistently, extremely low for REE deposits.
The final batch of results for the June quarter very encouragingly continued to show broad REE
mineralised clay zones of up to 80m thickness occurring over the entire Jupiter alkaline intrusion and
included four of the top ten drill intersections recorded at that date. The best intersection recorded for
the June quarter was 58m @ 2,723ppm TREO (BRAC234), incidentally from the last batch of results
received for the quarter.
Assay results received subsequent to the end of the June quarter continued to deliver record drilling
intersections, including the best grade thickness result to date of 57m @ 3,430ppm TREO. The results
subsequent to the end of the June quarter also confirm the magnet rare earths (MREO) average 23%
of the TREO, and uranium and thorium levels continue to remain very low throughout the entire Jupiter
system.
Announcements on drilling results released during the quarter – click link to view
• Another Record Drilling Result – 57m @ 3,430ppm TREO – 17 July 2024 (post quarter)
• Best Drill Intersection to date – 58m @ 2,723ppm TREO – 17 June 2024
• 8m @ 5,716ppm TREO- Jupiter Drilling Continues to Outperform – 5 June 2024
• Drilling Delivers More Record REE Intersections at Jupiter – 23 May 2024
• Jupiter-more outstanding REE hits up to 60 m over 2000 ppm – 16 April 2024
Page |
Page 3
3
Figure 1 | Significant intercepts from announcement on 17 June 2024
Jupiter 40 km2 area with drill hole locations coloured by TREO grade thickness on gravity image. New intersections with
>2,000 ppm TREO zones annotated.
Page |
Page 4
4
Figure 2 | Significant intercepts from announcement on 5 June 2024
Jupiter 40 km2 target area with drill hole locations coloured by TREO grade thickness on gravity image. New
intersections with >2,000 ppm TREO zones annotated.
Page |
Page 5
5
Figure 3 | Significant intercepts from announcement on 23 May 2024
Jupiter 40 km2 target area with drill hole locations and updated significant intersections on Bouger gravity 2.67 anomaly
as defined by recent high resolution ground gravity surveying. For the marked east-west section lines please refer to
Figure 5 for the drilling cross sections.
Page |
Page 6
6
Project Background
Jupiter is well located in regional Western Australia, away from any significant population centres and close
to infrastructure. The new discovery is less than 10km from the bitumen highway that runs between Mount
Magnet and Geraldton, providing easy access to the labour centres, the Port of Geraldton and Mid-West
gas pipeline that runs parallel to the bitumen highway. Lynas’ Mt Weld and Iluka’s Eneabba rare earth
refineries are in close proximity to the site.
The terrain at Jupiter is sparsely vegetated and facilitates year-round access. The licences are situated on
pastoral leases which are minimally stocked.
Figure 4 | Location Map of Jupiter within the Brothers clay-hosted REE Project
Page |
Page 7
7
South West Project, Nickel-Copper-PGE, Western Australia
(Chalice are the majority owner, having earned a 51% interest)
Activities during the June Quarter
Joint Venture partner Chalice Mining completed a total of 137 hand auger soils collected on a 400 x 50m
grid during the June quarter to test a previously identified Sn-Ta laterite anomaly. Two low-level LCT
Pegmatite pathfinder anomalies were defined: a c. 500 x 200m Be-Cs-Li anomaly and an adjacent 500 x
300m Sn-Ta-Nb-W anomaly. Pegmatite geology was not observed in the field and JV partner Chalice
Mining has not planned any follow up work at this stage.
Project Background
The South West Project contains the Thor and Odin Prospects within its tenement package (256 km²) and
is located ~240 km south of Perth, hosted within the Balingup Gneiss Complex. A joint venture between
Teck Cominco and BHP Billiton, first identified this area as being prospective for base and precious metals
hosted within the complex. The joint venture completed surface sampling and airborne EM surveys which
culminated in the discovery of a base and precious metals deposit (Kingsley Prospect) which Teck identified
as a meta-Volcanic Massive Sulfide (“VMS”) system in high grade metamorphic rocks. Venture’s nearby
Thor prospect hosts a strong and coherent arsenic in laterite anomaly, with locally elevated levels of copper,
zinc, tin, bismuth, tungsten and antimony, elements that are typically elevated in VMS systems.
Chalice Earn-in (Thor and Odin Prospects)
In July 2020 Chalice executed an option and earn-in agreement on the South West Project, as the project
included a ‘Julimar lookalike’ Ni-Cu-PGE target: a ~20km long interpreted mafic-ultramafic complex with a
strong magnetic signature and massive sulfide occurrence (the Thor Target). Chalice, as operator, may
earn up to 70% by spending $3.7 million on exploration over 4 years. Chalice completed a ground EM
program, Auger Soil Geochemistry program and Maiden Drilling Program on the prospective Thor trend
and met the expenditure requirement of $1.2 million within two years of signing the agreement to earn 51%.
Chalice can earn a further 19% interest (for a total of 70%) through an additional $2.5 million of expenditure
by July 2024. Once the second stage of the earn-in is completed Venture can then elect to either contribute
30% or dilute to a minimum of 10% JV interest, in which case the interest automatically reverts to a 1.25%
NSR royalty. After identifying two new Ni-Cu-PGE targets in 2022, Chalice committed to the second stage
of the JV.
Page |
Page 8
8
Golden Grove North Project, Lithium & Zinc-Copper-Gold, Western Australia
(Premier1 Lithium earning in)
Activities during the June Quarter
Joint Venture partner Premier1 Lithium completed an 820 soil and rock sample programme during the June
quarter. The samples were assayed for a broad suite of elements and Premier 1 Lithium noted no significant
results were returned.
Project Background
The land package (288 km2) is less than 10 kilometres north of the Golden Grove Camp (Mine). Venture
entered into a farm-in agreement on the Golden Grove North Project with Premier1 Lithium (formerly
SensOre Ltd) to spend up to $4.5m to earn a 70% interest, with Venture to retain the rare earth element
mineral rights and an option to claw back up to 10% under the terms of the Farm-in Agreement.
The Company has four granted exploration licences (606 km²) located ~230 km east-southeast of Perth in
Western Australia.
Page |
Page 9
9
Riley Iron Ore Mine, North-West Tasmania
Activities during the June Quarter
Following a strategic review of the Riley Iron Ore Mine by Argonaut PCF, Venture successfully entered in
to a Sale Agreement with Gold Valley Pty Ltd (Gold Valley) for the sale of Venture Iron Pty Ltd (Venture
Iron), the holder of the Riley Iron Ore Mine.
Under the terms of the Sale Agreement, Gold Valley receives 100% of the Company’s shares in Venture
Iron for the consideration of A$3m. Gold Valley will also replace Venture’s bank guarantee relating to the
Environmental Bond.
Argonaut PCF is a specialist natural resources advisor with leading expertise and a proven track record of
assisting metals and mining companies critically assess and optimise the value of assets. The review
followed the lapse of the offtake agreement with Prosperity Steel, which allowed the Company to consider
all options in relation to the future of the Riley Iron Ore Mine.
The review considered all options, including a potential restart, joint venture or asset sale, with the focus on
delivering near-term value for the Company and its shareholders.
The Company carefully considered all options presented and following a competitive process determined
that the sale of the Project was the best pathway to unlock the commercial value for Venture shareholders.
During the period the mining licence renewal was granted by Mineral Resources Tasmania.
Mount Lindsay Project, Tin-Tungsten, North West Tasmania
Activities during the June Quarter
Activities focussed on the long-term, research project that is being conducted by Curtin University. The
program is designed to establish the possibility of extracting both tin and boron which are bound together.
The work remains in progress and Venture will update the market on any information that rises to a level of
market sensitivity. Any feasibility study will require demonstration of the ability to extract the tin and boron
prior to advancing. The board of Venture has announced its intention to divest the project in future.
Project Background
The Mount Lindsay Project (178 km2) is located in north-western Tasmania within the contact metamorphic
aureole of the highly perspective Meredith Granite. The project sits between the world class Renison Bell
Tin Mine (Metals X Ltd/Yunnan Tin Group >230kt of tin metal produced since 1968) and the Savage River
Magnetite Mine (operating for >50 years, currently producing approximately 2.5 Mtpa of iron pellets). Mount
Lindsay has excellent access to existing infrastructure including hydropower, wind power, water, sealed
roads, rail and port facilities.
Venture owns 100% of the tenure that hosts both the Mount Lindsay Tin-Tungsten Deposit and all of the
surrounding prospects. Since 2007, Venture has completed circa 100 kilometres of diamond core drilling at
Mount Lindsay and defined JORC compliant Measured, Indicated and Inferred Resources (Refer to ASX
announcement 17 October 2012). The resource base at Mount Lindsay is hosted within two magnetite rich
skarns (Main Skarn and the No.2 Skarn) which extend over a total strike of 2.8 km and remain open at depth.
Page |
Page 10
10
Figure 5 | Location Map for Mount Lindsay Tin-Tungsten Deposit and Livingstone DSO Deposit
Livingstone DSO Hematite Project, North West Tasmania
Activities during the June Quarter
No further activities undertaken.
Project Background
Located only 3.5 km from the Mount Lindsay Tin-Tungsten Deposit, is the 100% owned Livingstone
DSO Hematite Deposit (Refer Figure 5). Livingstone consists of an outcropping hematite cap overlaying a
magnetite rich skarn. The hematite occurs from surface, is consistent in grade and located only 2 km
from a sealed road, which accesses existing port facilities.
A resource statement of 2.2mt @ 58% Fe was defined at Livingstone in 2011, which was followed by
a positive and robust scoping study. Additional work later in 2011 included blending and sizing test
work and preliminary mining studies, all of which delivered positive results.
Page |
Page 11
11
Corporate
As at 30 June 2024, the Company had $1.6 million cash on hand and the following payments of:
•
•
•
$1.6m on exploration activities (refer to Item 1.2(a) of Appendix 5B), relating to drilling and
activities, tenement fees and rates, and geological staff costs (ASX Listing Rule 5.3.1); and
there were no mining or development activities during the quarter (ASX Listing Rule 5.3.2); and
$0.1m in aggregate of payments made to related parties or their associates (refer to Item 6.1 of
Appendix 5B) including (ASX Listing Rule 5.3.5): Directors’ fees, salaries and superannuation.
Detailed information on all aspects of Venture Minerals’ projects can be found on the Company’s
website www.ventureminerals.com.au.
Authorised by the Managing Director on behalf of Venture Minerals Limited
Philippa Leggat
Managing Director
Competent Person’s Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled by Dr. Stuart Owen who
is a Member of the Australian Institute of Geoscientists. Dr. Owen is a permanent employee of Venture Minerals and has sufficient experience that
is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr.
Owen consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Notes: All material assumptions and technical parameters underpinning the Minerals Resource and Reserve estimate referred to within previous
ASX announcements continue to apply and have not materially changed since last reported. The company is not aware of any new information or
data that materially affects the information included in this announcement.
Page |
Page 12
12
Appendix One | Tenements
Mining tenements held at the end of June 2024 Quarter
Project
Location
Tenement
Interest at June 2024
Mount Lindsay
Tasmania
3M/2012
100%5
Tasmania
5M/2012
100%7
Tasmania
7M/2012
100%
Tasmania
EL21/2005
100%
Tasmania
EL1/2019
100%
Tasmania
EL6/2022
100%
Tasmania
EL11/2022
100%
Tasmania
EL12/2022
100%
Western Australia
P59/2116
100%
Western Australia
E59/2243
100%
Western Australia
E59/2244
100%
Western Australia
E59/2285
95%1
Western Australia
E59/2288
100%
Western Australia
E59/2506
51%2
Western Australia
E59/1989
51%2
Western Australia
E70/4837
49%4
Western Australia
E70/5067
49%4
Western Australia
E70/5421
49%4
Western Australia
E70/5077
100%
Western Australia
E70/5084
51%3
Western Australia
E70/5779
100%
Western Australia
E70/5801
100%
Mount Gibson
Western Australia
E59/2782
100%
Bandy
Western Australia
E77/2940
100%
Brothers
Western Australia
E59/2710
100%
Western Australia
E59/2711
100%
Western Australia
E59/2819
100%
Western Australia
E59/2820
100%
Western Australia
E59/2821
100%
Western Australia
E59/2827
100%
North East
Golden Grove North
South West
Kulin
Page |
Page 13
13
Project
Location
Tenement
Interest at June 2024
Iron Duke
Western Australia
E59/2421
70%6
Western Australia
E59/2463
70%6
1 A 5% interest is held by Galahad Resources Pty Ltd with Venture potentially earning up to 100%.
2
Venture Minerals is earning up to 90% interest from Bright Point Gold Pty Ltd on E59/1989 with a 10% interest held by Bright Point Gold. Once
Venture has earned a 90% interest, Bright Point must elect to either contribute or dilute to a royalty of 1% NSR.
3
Venture has the right to earn in to 80% interest from Exactical Pty Ltd. Exactical can elect to contribute or dilute to royalty of 2%.
4
Chalice Mining earned 51% during the quarter as per the terms of the Earn-in Agreement dated 21 July 2020.
5
Renewals lodged with Mineral Resources Tasmania; licences remain active.
6
Venture has the right to earn up to 100% interest in Iron Duke, with the tenements owned by Merchant Ventures Pty Ltd, a wholly owned subsidiary
of Sentinel Exploration Limited.
7
Note Riley Iron Ore Mine sale completed post quarter end on 16 July 2024.
Mining tenements acquired and disposed during the June 2024 Quarter:
Project
Location
Tenement
Interest at beginning of
Quarter
Interest at end of
Quarter
Mt Lindsay
Tasmania
EL72/2007
100%
-
Mt Lindsay
Tasmania
EL45/2010
100%
-
Beneficial percentage interests in joint venture agreements at the end of the Quarter:
Project
Location
Tenement
Interest at beginning of
Quarter
Interest at end of
Quarter
Iron Duke
Western Australia
E59/2421
70%
70%
Iron Duke
Western Australia
E59/2463
70%
70%
Beneficial percentage interests in farm-in or farm-out agreements acquired or disposed of during
the Quarter:
Project
Location
Tenement
Interest at beginning of
Quarter
Interest at end of
Quarter
Nil
Page |
Page 14
14
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Venture Minerals Limited
ABN
Quarter ended (“current quarter”)
51 119 678 385
30 June 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
(1,536)
(4,434)
(b) development
-
-
(c) production
-
-
(d) staff costs
(170)
(690)
(e) administration and corporate costs
(288)
(1,458)
-
-
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
28
79
1.5
Interest and other costs of finance paid
(3)
(15)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
1,501
1.8
Other – Deposit on sale of Riley
50
50
1.9
Net cash from / (used in) operating
activities
(1,919)
(4,967)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(6)
(6)
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(6)
(6)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
695
3,695
-
-
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(207)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
(11)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
695
3,477
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,873
3,139
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,919)
(4,967)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(6)
(6)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
695
3,477
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
1,643
1,643
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
643
673
5.2
Call deposits
1,000
2,200
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,643
2,873
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
112
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,919)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,643
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,643
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.86
-
$A’000
(1,919)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes, the company expects to continue with the current expenditure levels.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: Yes, on 1 July 2024 the company announced a $6m placement and a $1m Share
Purchase Plan. Tranche 1 of the placement completed on 5 July 2024. The sale of
the Riley Iron Ore Mine completed on 16 July 2024 raising an additional $3m before
costs.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes – As per the response in 8.8.2 the company has raised sufficient capital to
continue its operations.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
.........31 July 2024.........................................
Authorised by:
Jamie Byrde
CFO/Company Secretary
................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required un