Ignite Investment Summit Presentation - Hong Kong
Released
Released
Announcement PDF
Building Australian
Magnet Rare-Earth Supply
Corporate Presentation | October 2025 | ASX: CRI
Scale • Simplicity • Speed
Jupiter REE Project is Australia’s largest clay-hosted MREO resource. Based in Western
Australia, with promising beneficiation testwork results, advancing through metallurgical
studies.
2
Disclaimer
Authorised by the Board of Critica Limited
This Presentation (Presentation) has been prepared by Critica Limited (CRI or the Company) and
is authorised by the Board of CRI. The information contained in this Presentation is a professional
opinion only. Certain information in this Presentation has been derived from third parties and
though CRI has no reason to believe that it is not accurate, reliable or complete, it has not been
independently audited or verified by CRI.
This Presentation contains general and background information about CRI’s current activities as
at the date of this Presentation and should not be considered to be comprehensive or to
comprise of all the information that an investor should consider when making an investment
decision. CRI is not responsible for providing updated information and assumes no responsibility
to do so. Recipients should conduct their own investigations and perform their own analysis of
the information, statements and opinions contained and this Presentation should be read in
conjunction with CRI’s other periodic and continuous disclosure announcements lodged with the
ASX.
This Presentation is for information purposes only. Neither this nor the information contained in it
constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale
of CRI shares in any jurisdiction. This Presentation is not investment advice or a recommendation
to acquire CRI securities and has been prepared without taking into account the recipient's
investment objectives, financial circumstances or particular needs. Recipients should seek
professional advice before deciding if an investment is appropriate.
All securities transactions involve risks, which include (among others) the risk of adverse or
unanticipated market, financial or political developments.
To the fullest extent permitted by law, CRI, its officers, employees, related bodies corporate,
agents and advisers expressly disclaim, to the maximum extent permitted by law, all liabilities
(however caused, including negligence) in respect of, make no representations regarding, and
take no responsibility for, any part of this Presentation and make no representation or warranty
as to the currency, accuracy, reliability or completeness of any information, statements, opinions,
conclusions or representations contained in this Presentation. No responsibility for any errors or
omissions from this arising out of negligence or otherwise is accepted.
Any forward-looking statements and forward-looking information included in this Presentation
involve subjective judgment and analysis and are subject to uncertainties, risks and
contingencies, many of which are outside the control of, and may be unknown to, CRI. In
particular, they speak only as of the date of this Presentation, they assume the success of CRI’s
strategies, and they are subject to significant regulatory, business, competitive and economic
uncertainties and risks. Actual future events may vary materially from the forward-looking
statements and forward-looking information and the assumptions on which they are based.
Recipients of this Presentation are cautioned to not place undue reliance on such forward-
looking statements and forward-looking information.
Critica.limited
ASX:
CRI
October
2025
Basis of Preparation
CRI has not completed a Scoping or Feasibility Study. References to development pathways are
aspirational and do not imply economic viability. Inferred Mineral Resources are insufficient to support
Ore Reserves and cannot underpin production targets or forecasts. Metallurgical results are preliminary
testwork on selected samples; applicability across the deposit and at scale remains to be
demonstrated. Future studies, permits and funding (including equity) may be required before any
development decision.
Competent Persons Statement
The information in this report that relates to exploration results including geology interpretation, data
preparation and data quality is based on work compiled by Dr. Stuart Owen who is a Member of the
Australian Institute of Geoscientists. Dr. Owen is a permanent employee of Critica Limited and has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (JORC code). Dr. Owen consents to the inclusion in the report of the matters based on his
information in the form and context in which they appear.
This Presentation refers to Critica's mineral resource estimate at the Jupiter Project. The information in
this Presentation that relates to that mineral resource estimate has been extracted from Critica's
previous ASX announcement entitled Jupiter Maiden Resource – Australia’s Largest Clay Hosted which
Critica announced to the ASX on 11 February 2025 and 13 August 2025 Jupiter Confirmed as Australia’s
Largest MREO Clay Resource. A copy of the announcements are available at www.asx.com.au (ASXCRI)
or at www.critica.limited.
Critica confirms that it is not aware of any new information or data that materially affects the
information included in that announcement and, in relation to the estimate of the mineral resource,
confirms that all material assumptions and technical parameters underpinning the estimate in that
announcement continue to apply and have not materially changed. The Competent Person in relation to
the mineral resource estimate in that announcement was Rodney Brown. Critica confirms that the form
and context in which the Competent Person's findings are presented have not been materially modified
from that announcement.
The Information in this presentation relates to previous exploration results extracted from the following
ASX announcements:
• 29 September 2025 – Consistent Bulk Sample Results Strengthen Jupiter Pathway
• 1 September 2025 - Critica to produce high-grade REE concentrate at pilot plant
• 26 August 2025 - ANSTO & Minutech engaged to produce first MREC from Jupiter
• 13 August 2025 – Jupiter Confirmed as Australia’s Largest MREO Clay Resource
• 16 July 2025 – Critica Advances Jupiter – Outstanding Magnet and HREO Grades
• 28 May 2025 – Critica Commences Bulk Metallurgical Testwork
• 5 May 2025 – Drilling Targets Restricted Heavy REE at Satellite Prospects
• 11 February 2025 – Jupiter Maiden Resource – Australia’ Largest Clay Hosted
• 23 January 2025 – Frist Pass Metallurgical Testwork Delivers 830% REE Upgrade
The Problem: A Critical Supply Bottleneck
Demand is Surging, Structural and Strategic
REE demand forecast to rise ~6× by 2050, with magnet REEs growing ~5× by
20401
Global Supply Chain Highly Concentrated2
Rare earth production and processing remain regionally concentrated,
creating vulnerability for diversified, resilient supply chains
OEMs Desperate for Traceable, ESG-Compliant Supply
Policy and customer requirements drive demand for transparent, low-carbon,
responsibly sourced materials; mine-to-magnet traceability is essential3
No New Supply: Build Times & Permitting Create Bottlenecks
Average 6–18 years from discovery-to-production - structural lag constrains
near-term supply4
Sources: 1 Barclays Research, May 2025; 2 IEA; US Geological Survey; 3 U.S. Government IRS rules on Evs and Restriction on NdFeB mine-to-magnet chain; EU Batteries Regulations; 4 IEA; S&P Global; 5 Reuters (quoting
Adamas Intelligence); 6 Global X ETFs, Wood Mackenzie, Politico, United States Geological Survey (via Livewire Markets); 7 In July 2025, the U.S. Department of Defence (DoD) has agreed to a US$110/kg price floor for
neodymium-praseodymium (NdPr), the key oxide used in high-strength permanent magnets.
Critica.limited
ASX:
CRI
October
2025
EVs
Defense
Platforms
Robotics
Wind
Turbines
AI
Processors
Magnet REEs power technologies such as:
3
U.S, EU, Japan, and Korea prioritising magnet REE
supply with direct funding and stockpiling programs
OEMs contracting earlier in the value chain to
secure magnet metal supply for EV and renewable
energy applications
EU targets by 2030: 10% extraction, 40% processing,
25% recycling, and ≤65% from any single third country
Policy & Funding Tailwinds
Demand and Supply
US$110/kg NdPr floor price set by U.S. DoD for
domestic producers7
What This Means for Critica
Jupiter’s scale, metallurgy and WA location align perfectly with global
demand for secure, responsible REE supply
Critica’s Jupiter Project
Jupiter & Brothers REE Project
1.8 Bt @ 1,700 ppm TREO (1,000 ppm cut off)
Including 520 mt @ 2,200 ppm TREO (1,800 ppm cut off)
Perth
Kulin Project
Geraldton
Australia’s largest and highest-grade clay-hosted resource. Magnet REEs (Nd, Pr,
Dy, Tb) making up a significant proportion of the reported grade distribution1
Critica.limited
ASX:
CRI
October
2025
4
The Solution
Scale
01
Simplicity
02
Preliminary testwork on selected samples indicates ~95% mass rejection and
>8× grade uplift prior to leach, with low U/Th in a Tier-1 WA location
Current programs with ANSTO, Minutech and GAVAQ are now live, with results
intended to inform pilot-scale work and future studies
Speed
03
1. Refer to Jupiter resource announcements dated 11 Feb and 13 Aug 2025
Critica.limited
ASX:
CRI
October
2025
5
Jupiter: Scale
A large-scale, high-grade clay-hosted resource
with strong beneficiation potential
Australian Clay Hosted REE Deposits
1.8Bt
Global Resource
TREO 1700ppm
640Mt
MREO Resource
MREO 487ppm
~95%
Mass Reduction
Beneficiation
testwork
WA
T1 Location
Proven Mining
Jurisdiction
>800%
Grade Uplift
Beneficiation
testwork
U&Th
Low ppm
Illustrative only. Jupiter resource is Inferred (ASX: 11 Feb & 13 Aug 2025) and not directly comparable to peers with
Indicated/Measured resources or advanced studies. Refer to Appendix C for source data for peer comparisons.
Resource Tonnage (Mt)
TREO
Grade
(ppm)
North Stanmore: Victory Metals
Splinter Rock: OD6
Cowalinya: Heavy Rare Earths Limited
Salazar-Newmont-OConnor:
West Cobar Metals
Mt. Ridley: Mt. Ridley
Mines
Koppamurra: Australian Rare Earths
Tower: Krakatoa
Resources
Jupiter: Critica
Limited
Jupiter High-Grade: Critica Limited
0
500
1,000
1,500
2,000
2,500
3,000
0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000
TREO Grade (ppm)
Mt
Mineralisation: Near surface, homogeneous across 40km2 –
constant & predictable
Clean basket: Low U&Th – potential ESG benefits
Growth potential: Jupiter <3% of Critica’s Brothers Project –
flexibility & grow
Critica.limited
ASX:
CRI
October
2025
6
Jupiter: Scale
Quality, Continuity & Growth Potential
The Jupiter resource features consistent mineralisation across the deposit,
with opportunities for expansion through targeted exploration
Critica.limited
ASX:
CRI
October
2025
7
Jupiter: Simplicity
Why Clay-Hosted Matters
Image: Jupiter Project. Jupiter's clay-hosted REE mineralisation potential to offer significant processing advantages
over hard rock deposits. The unique clay chemistry and structure enable physical separation and concentration using
conventional, low-energy processes.
Jupiter is located on pastoral leases with flat terrain and
sparse vegetation. Engagement underway for heritage
surveys and approvals
Low strip ratio, potentially simple mining
01
Beneficiate upfront, low footprint
02
Clay-hosted advantage: upfront beneficiation delivers major
mass reduction and grade uplift before hydrometallurgy
Metallurgical responsiveness, the key
03
Not all clays are equal. Large-scale pilot testing across all
Jupiter ore types confirms ~95% mass rejection and 8–10×
upgrade to a 15,000–20,000 ppm TREO concentrate —
validating the beneficiation-first pathway
These are aspirational statements and are not intended to be forecasts, as the Company does not yet have reasonable grounds to expect that the matters on this slide will be achieved
Critica.limited
ASX:
CRI
October
2025
8
Jupiter: Simplicity
Jupiter’s Beneficiation Unlocks Simplicity
The combination of ~95% mass rejection and 6–10× upgrade — validated on a 400 kg bulk sample across multiple Jupiter ore types — demonstrates a
simple, scalable beneficiation pathway with enduring advantages such as:
• A smaller leach circuit
• Reduced reagent, water and energy use
• Low U&Th levels provide potential favourable characteristic for handling and processing
Preliminary large-scale testwork (400 kg bulk sample) indicates ~95% mass rejection and 6–10× upgrade prior to leach across multiple Jupiter ore types. Applicability across the broader deposit and at commercial scale remains to be demonstrated.
These are aspirational statements and not intended to be forecasts.
Mixed Rare Earth Product (MREP) - An intermediate product in rare earth processing, typically containing 30–50% TREO. MREP can be produced as a carbonate or oxide and is the preferred feedstock for downstream separation facilities.
Critica.limited
ASX:
CRI
October
2025
9
Jupiter: Tier-1 Western Australia
Infrastructure Advantage
Jupiter is located within trucking
distance of services, power and port
infrastructure
1
Infrastructure rich
Road > rail > port pathways; short haul to
utilities
2
Proven mining jurisdiction
Transparent approvals, Skilled workforce and
OEM/contractor base
Critica.limited
ASX:
CRI
October
2025
10
Jupiter: Speed
From Validation to Value - Near-Term Value Catalysts
Structured Pathway to Development
Geological
Definition –
Resource
Optimisation
GAVAQ
Beneficiation –
Pilot Scale
Validation
MREP*
Hydrometallurgy –
ANSTO &
Minutech
Pilot Design
Integration –
Process
Definition
Scoping Study –
Integration
& Forward
Planning
• Infill drilling and
block modelling of
magnet-REE zones
(Nd, Pr, Dy, Tb)
• Upgrading Inferred
to Indicated for
Scoping inputs
• 400 kg trials
confirm ~95 %
mass rejection and
6–10× upgrade
• 3,000 kg closed-
circuit pilot
underway to refine
recoveries
• Parallel hydromet
tests defining leach
pathway and MREP
chemistry
• Validates
recoveries and
product quality
across ore types
• Combines
beneficiation and
hydromet results
into full process
model
• Defines MREP
specification and
supports offtake
readiness
• Consolidates
technical data and
process
parameters
• Establishes
economics and
pathway to Pre-
Feasibility
01 02 03 04 05
*Mixed Rare Earth Product (MREP) - An intermediate product in rare earth processing, typically containing 30–50% TREO. MREP can be produced as a carbonate or oxide and is the preferred feedstock for downstream separation facilities.
Critica.limited
ASX:
CRI
October
2025
11
Critica Limited (ASX:CRI)
Owner of Australia's Largest Clay REE Resource1
Company Snapshot
ASX-listed Since 2006, critical minerals focused
Ticker CRI.ASX
Primary Project Jupiter REE (WA)
Other Assets Mt Lindsay Tin-Tungsten (Tasmania)
Jurisdiction 100% owned Australian portfolio
Shareholder Summary
1. Refer MRE announced dated 11 February 2025 and MRE Update dated 13 August 2025.
2. Share price, market cap and EV as at 13 October 2025.
3. Cash as at 30 June 2025. No debt. Figures shown in Australian dollars.
% Holding
Top 20 Shareholders 21%
WGS 63,688,888 2.4%
Elphinstone Group 60,521,450 2.2%
Board and Management 58,113,409 2.2%
Lion Selection Group 52,631,579 2.0%
NorthStar Impact Fund 40,000,000 1.5%
Financial Snapshot
2.70Bn
Shares on issue
$94.8M
$4.15M
Cash3
1
Nil
Debt
$90.7M
Enterprise Value2
Market Capitalisation2
$0.035
Last Price2
Share Price Performance (12 months)
Critica.limited
ASX:
CRI
October
2025
12
Leadership Team
Proven Track Record in Critical Minerals Project Delivery
Jacob Deysel BSc Mining, MBA
CEO – Mining engineer with 25+ years in global critical mineral leadership—from Rio Tinto to Rare Earths
and UEC—expert at scaling projects into production.
Jamie Byrde BComm, CA
CFO – Finance professional with 20+ years in ASX-capable CFO and company secretary roles, specialising
in governance, compliance and capital discipline.
Dr. Stuart Owen BSc (Geology), PhD (Geology)
Exploration Manager – PhD geologist with 25+ years of exploration success across four continents; led
discovery of Paulsens gold and the Jupiter REE deposit.
Dr. Natalee Bonnici BSc Hon (Geology), PhD (Geometallurgy)
Senior Exploration Geologist – 15+ years as a Geologist and PhD geometallurgist experienced in linking
mineralogy to metallurgical behaviours; part of the discovery of the Triumph VHMS deposit, Leonora WA;
developed and delivered resources at Northern Star Kalgoorlie.
Dr. Thi Thu Hien Dinh BSc (Mineral Processing), PhD (Metallurgy)
Senior Metallurgist – PhD metallurgist with 23+ years in rare earths and battery metals; led processing
teams across REE, lithium, and nickel projects.
Tim Lindley MCom, BA, GAICD, FGIA
Non-Executive Chairman – Seasoned ASX Chair and NED with 25 years in global investment banking
(Morgan Stanley, Barclays, Deutsche and UBS), adept in equity raising, project finance and growth M&A.
Nick Cernotta B.Eng (Mining)
Non-Executive Director – Mining engineer with 40 years of global multi-commodity, corporate and
operational leadership experience (Fortescue, Barrick, MacMahon). Independent NED and Chair roles across
ASX-listed companies.
• Proven track record in critical
minerals project delivery
• Experience from exploration
through to production
• Board and management aligned
on disciplined execution
• Deep WA industry, OEM and
investor relationships
Board
Management
Critica is not just a resource story —
delivered by people who’ve done it before
Critica.limited
ASX:
CRI
October
2025
13
Investment Highlights
• Australia’s largest clay-hosted magnet REE resource (~640 Mt @ ~490 ppm MREO)
• ~680,000 t contained MREO (including Nd, Pr, Dy, Tb)
• District-scale growth — Jupiter is one of six discoveries across Brothers (1,353 km²)
Scale
01
Simplicity
02
Speed
03
• Clay-hosted advantage — beneficiate upfront before hydrometallurgy
• Exceptional responsiveness — ~95% mass rejection & >800% upgrade
• Low U/Th basket — cleaner, safer, easier to permit, smaller footprint
• Active programs now — ANSTO, Minutech, GAVAQ pilot
• Clear catalyst path — MREP samples, Scoping Study inputs
• Disciplined funding — milestone-driven
Resource > MREP > Pilot Upscale > Scoping Study > Commercial Discussions
Our advantage is simple: scale that
overwhelms, metallurgical potential
and a pathway that accelerates.
Near-term value catalysts:
These are aspirational statements and are not intended to be forecasts, as the Company does not yet have reasonable grounds to
expect that the matters on this slide will be achieved
Contact
ASX: CRI
Address: Level 2, 16 Altona Street, West Perth WA 6005
Phone: +61 8 6279 9428
Email: info@critica.limited
Website: critica.limited
Follow Us
linkedin.com/company/criticaltd
@Critica_CRI
Investor Relations
Dannika Warburton
Investability
investors@investability.com.au
Critica.limited
ASX:
CRI
October
2025
15
Critica Limited (ASX:CRI)
Strategic Optionality
Mt Lindsay Tin Tungsten Project1
• Mt Lindsay is one of the largest
undeveloped tin-tungsten deposits globally
• Bankable Feasibility Study completed
• Contained metal:
• 81,000t of Tin &
• 3,200,000 mtu Tungsten Trioxide
(WO3) ~32,000t
• Tin and tungsten prices are accelerating,
driven by tightening global supply,
renewed demand from electronics,
semiconductors and defence sectors
1. Combined resource – Measured, Indicated & Inferred - Refer to ASX release 17
October 2012.
Critica.limited
ASX:
CRI
October
2025
16
ESG Advantage
Built-In, Not Bolted-On
Critica’s Jupiter project is being
advanced with a focus on ESG
principles, leveraging geological and
processing characteristics that have
the potential to reduce
environmental impact and align with
global decarbonization objectives
Mass rejection
before leaching
95%
Preliminary testwork indicates exceptionally low uranium and thorium
content, significantly below regulatory thresholds — a favourable
characteristic for handling and export
Pilot-scale beneficiation results from a 400 kg bulk sample show ~95%
mass rejection across multiple ore types, meaning substantially less
material requires downstream processing and storage compared to
untreated feed
Flowsheet design under evaluation suggests lower water and energy
intensity than direct-leach approaches, reflecting potential processing
efficiencies
Standard heritage assessment undertaken – low risk area
Clean Geology
Smaller Footprint
Resource Efficiency
Heritage Assessment
Critica.limited
ASX:
CRI
October
2025
17
Appendix A: Glossary
Key Terms and Definitions
1
TREO/MREO
Total Rare Earth Oxides / Magnet Rare Earth Oxides - MREO refers specifically to
those rare earth elements used in permanent magnets (primarily Nd, Pr, Dy, Tb)
2
NdPr
Neodymium and Praseodymium - The two most common rare earth elements used in
permanent magnets, typically accounting for ~90% of magnet composition
4
MREP
Mixed Rare Earth Product - An intermediate product in rare earth processing,
typically containing 30–50% TREO. MREP can be produced as a carbonate or oxide
and is the preferred feedstock for downstream separation facilities
3
Dy, Tb
Dysprosium and Terbium - Heavy rare earth elements added to magnets to improve
performance at high temperatures, critical for EV traction motors and wind turbines
Critica.limited
ASX:
CRI
October
2025
18
Appendix B: Jupiter Inferred Mineral Resource Estimate
Mineral Resource Estimate prepared by globally recognised, tier one consultants, SRK Consulting.
For full Jupiter MRE detail including all component REO grades and gangue material content refer to ASX Announcement 11 February 2025.
Jupiter Inferred Grade-Tonnage Summaries
Cut-off Tonnage TREO MREO La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3
TREO (ppm) (Bt) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
1,000 1.78 1,651 383 342 762 81 284 41 9 25 3 14 2 6 1 5 1 74
1,800 0.52 2,169 499 444 1,023 106 371 53 11 31 4 18 3 8 1 6 1 90
Cut-off Tonnage TREO MREO La2O3 CeO2 Pr6O11 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb4O7 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3
TREO (ppm) (Bt) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
200 3.28 1,156 266 249 526 57 197 28 6 17 2 10 2 5 1 4 1 52
300 3.04 1,230 283 264 560 61 210 30 6 19 2 11 2 5 1 4 1 56
400 2.91 1,267 292 271 578 63 216 31 7 19 2 11 2 5 1 4 1 57
500 2.69 1,335 308 283 610 66 228 33 7 20 2 12 2 5 1 4 1 61
600 2.44 1,417 328 298 649 70 243 35 7 22 3 12 2 6 1 4 1 65
700 2.22 1,492 346 311 685 74 256 37 8 23 3 13 2 6 1 5 1 68
800 2.06 1,550 359 322 713 76 267 39 8 24 3 14 2 6 1 5 1 71
900 1.91 1,603 372 332 739 79 276 40 8 24 3 14 2 6 1 5 1 73
1,000 1.78 1,651 383 342 762 81 284 41 9 25 3 14 2 6 1 5 1 74
1,100 1.70 1,679 389 348 775 83 289 42 9 25 3 15 2 6 1 5 1 75
1,200 1.60 1,711 397 354 791 84 294 43 9 26 3 15 3 7 1 5 1 77
1,400 1.24 1,828 423 377 849 90 315 45 9 27 3 16 3 7 1 5 1 80
1,600 0.84 1,987 459 408 930 98 341 49 10 29 3 17 3 7 1 6 1 85
1,800 0.52 2,169 499 444 1,023 106 371 53 11 31 4 18 3 8 1 6 1 90
2,000 0.30 2,372 542 483 1,127 116 404 57 12 33 4 19 3 8 1 7 1 97
2,200 0.17 2,578 587 523 1,232 125 437 61 13 36 4 20 3 9 1 7 1 105
Critica.limited
ASX:
CRI
October
2025
19
Appendix C: Source Data for Peer Comparisons
Project Company Resource Mt TREO (ppm) Stage Source
Caldeira Meteoric Resources
Measured 37 2,983
PFS
ASX Announcement. Maiden Barra do Pacu Resource adds strategic high-grade rare
earths.15 April 2025. 02936637.pdf
Indicated 629 2,668
Inferred 832 2,097
Total 1,497 2,359
Colossus Viridis Mining
Measured 1 2,605
Pre-Scoping
ASX Announcement. Colossus Delivers Largest Measured & Indicated Resource and
Highest MREO Grade IAC Project Globally. 22 January 2025. 2924-02905018-
6A1247713
Indicated 329 2,680
Inferred 163 2,162
Total 493 2,508
Cowalinya Heavy Rare Earths Limited
Inferred 159 870
Pre-Scoping
ASX Announcement. Five-Fold Increase in mineral resources to 159 Mt @ 870 ppm
Total Rare Earth Oxides at Cowalinya Project in Western Australia. 3 October 2023.
02720133.pdf
Total 159 870
Ema Brazil Critical Minerals
Indicated 248 759
Scoping Study
ASX Announcement. Updated Mineral Resource for Ema 97% Increase of indicated
tonnage. 21 February 2025.
https://braziliancriticalminerals.com/announcements/6803971
Inferred 695 701
Total 943 716
Koppamurra Australian Rare Earths
Measured 0.7 813
Scoping Study
ASX Announcement. ASX Release. Significant Resource Expansion at Koppamurra.
30 September 2024. ASX:AR3 - Significant Resource Expansion at
Koppamurra
Indicated 112 750
Inferred 123 747
Total 236 748
Mt. Ridley Mt. Ridley Mines
Inferred 168 1,201
Pre-Scoping
ASX Announcement. Significant Resource Expansion at Koppamurra. 30 September
2024. ASX:AR3 - Significant Resource Expansion at Koppamurra
Total 168 1,201
North Stanmore Victory Metals
Indicated 176.5 477
Scoping Study
ASX Announcement. North Stanmore advances as a global heavy rare earth clay
deposit. 16 January 2025. 2924-02903539-6A1247110
Inferred 70.9 533
Total 247.5 493
PCH Project
Appia Rare Earths and
Uranium Group
Indicated 6.6 2,513
Pre-Scoping
CSE Announcement. Appia Files NNI 43-101 Technical Report on Maiden Indicated
and Inferred Mineral Resource Estimate for PCH Ionic Adsorption Clay Project in
Gois, Brazil. April 16 2024. 205668.pdf
Inferred 46.2 2,888
Total 52.8 2,841
Rocha Da Rocha Brazilian Rare Earths
Inferred 510 1,513
Pre-Scoping Brazilian Rare Earths. Prospectus. 7 December 2023. 2924-02755917-6A1187169
Total 510 1,513
Salazar-Newmont-West Cobar West Cobar Metals
Indicated 44 1,229
Pre-Scoping
ASX Announcement. Major Resource Expansions at Salazar for REEs, TiO2 and
Scandium. 8 October 2024. ea9172ff-a94.pdf
Inferred 186 1,166
Total 230 1,178
Tiros Resouro Strategic Metals
Measured 367 4,100
Scoping Study
TSXV Release. Tiros Measured and Indicated Resource increased by 37% to 1.4
billion tonnes at 12% TiO2 and 4,000 ppm TREO. 08 April 2025. 8f9caf36-25f.pdf
Indicated 1,000 4,000
Inferred 500 3,700
Total 1,867 3,940
Tower Krakatoa Resources
Indicated 40 824
Pre-Scoping
ASX Announcement. Krakatoa Delivers maiden mineral resource at tower rare earth
deposit. 21 November 2022. 02600437.pdf
Inferred 60 852
Total 101 840
The peer comparison is illustrative only and not intended to imply economic viability or equivalence.
Share your feedback
Discover